.json · 1 sections · 9119 characters
workbench: _Working/federal-budget-2026-2027/goal/terra_human/va/ehr_cost/batch1/VA_EHR_SEPTEMBER_2025_COST_NOTIFICATION_AUDIT.json
Canonical source SHA-256: 52389f8e8fc8b54fe229fdbd4f151ae3e37cf62e47e02ae7f4db26c10b8b7727
Served copy SHA-256: 52389f8e8fc8b54fe229fdbd4f151ae3e37cf62e47e02ae7f4db26c10b8b7727
Owner evidence cutoffs: {"federal-budget-fy2026-fy2027": "2026-09-11T19:55:13-04:00"}
These are package-level cutoffs, not a claim that this source was rechecked on those dates. Use its own publication and capture dates.
Owners: federal-budget-fy2026-fy2027
Section 1 of 1
{ "receipt_id": "va_ehr_cost_notification_batch1", "status": "original_notification_and_cost_model_not_recovered; related_primary_records_read", "created_date": "2026-09-12", "scope": "Investigate the September 30, 2025 VA notification to Congress and supporting approximately $37.2 billion EHR cost model cited by FY2027 Volume 5 printed 158 / physical 159.", "saved_materials_search": { "locations_searched": ["_Working/federal-budget-2026-2027", "Catalog", "Research Catalog"], "queries": ["September 30, 2025", "37.2 billion", "10.5 billion", "EHR cost projection", "Electronic Health Record 37"], "result": "No saved notification, transmittal, cost-model attachment, or identified hearing record was found. The only direct local hit is the FY2027 Volume 5 CJ and its prior isolated receipts." }, "source_records": [ { "id": "va_fy27_volume5_cj", "type": "agency congressional justification", "title": "Department of Veterans Affairs, 2027 Congressional Submission, Volume 5", "url": "https://department.va.gov/wp-content/uploads/2026/04/Volume-5.pdf", "exact_locator": "printed 158 / physical 159", "read_status": "full page previously read in va/batch43", "what_it_says": "On September 30, 2025, VA notified Congress of high-level long-term projections: approximately $37.2b total program cost, inclusive of $10.5b obligated actual spending from 2018-2024; requirements were based on historical costs to implement and operate 170 VA enterprise sites by end-2031.", "sender_recipient_attachments": "VA and Congress are named only at institutional level; no sender, committee/recipient, transmittal identifier, attachment title, cost-model version, or URL is provided.", "limit": "This is a later VA assertion about a notification, not the notification or its supporting model." }, { "id": "bicameral_cost_request_letter_2025_03_28", "type": "original congressional letter", "title": "March 28, 2025 letter requesting an updated EHRM schedule and cost estimate", "url": "https://www.veterans.senate.gov/services/files/978365EF-08C2-4425-A3C3-E1034459CB04", "local_path": "/tmp/va_ehr_cost_request_letter_2025-03-28.pdf", "local_text_path": "/tmp/va_ehr_cost_request_letter_2025-03-28.txt", "read_status": "full two-page PDF read", "date": "2025-03-28", "sender": "Senate Veterans' Affairs Chairman Jerry Moran and Ranking Member Richard Blumenthal; House Veterans' Affairs Chairman Mike Bost and Ranking Member Mark Takano; Senate MilCon-VA Appropriations Subcommittee Chairman John Boozman and Ranking Member Jon Ossoff; House MilCon-VA Appropriations Subcommittee Chairman John Carter and Ranking Member Debbie Wasserman Schultz", "recipient": "The Honorable Doug Collins, Secretary, U.S. Department of Veterans Affairs", "request": "Provide a detailed EHRM schedule and cost estimate before September 30, 2025, before fielding resumes.", "method_expectation": "The letter points to Clinger-Cohen, OMB Circulars A-11 and A-130, OMB M-15-14, FITARA, FAR cost analysis, GAO's Cost Estimating Guide, and GAO's March 2025 recommendation as its requested framework; it supplies no VA cost model.", "attachments": "none in recovered two-page PDF", "role": "A request for a future VA response; it does not prove delivery, content, or reliance of any later related hearing." }, { "id": "gao_26_108812", "type": "official GAO testimony", "title": "VA Electronic Health Record Modernization: Critical Actions Needed to Support Accelerated System Deployments", "url": "https://www.gao.gov/assets/890/882956.pdf", "issued": "2025-12-15", "recipient_for_testimony": "House Committee on Veterans' Affairs, Subcommittee on Technology Modernization", "read_status": "relevant cost-estimate, recommendation, and method passages read from official accessible PDF; not a full document census", "finding": "GAO states that as of December 2025 VA had not provided an updated cost estimate, although it had delivered a notional schedule to congressional committees. It continued to list the updated independent life-cycle cost estimate recommendation as open/not implemented.", "method_and_comparator": "It describes the 2022 Institute for Defense Analyses estimate as $49.8b ($32.7b implementation for 13 years plus $17.1b sustainment for 15 years), and calls for an updated independent total life-cycle cost estimate using GAO-20-195G best practices.", "relation_to_cj": "This does not prove the CJ statement false: GAO's 'updated cost estimate' denotes the requested detailed/independent estimate. But it does mean the CJ's high-level $37.2b notification cannot be treated as the detailed, independently validated model GAO requested." }, { "id": "gao_26_109393", "type": "official GAO testimony", "title": "VA Electronic Health Record Modernization: Actions Needed to Sustain Accelerated System Deployments", "url": "https://www.gao.gov/assets/gao-26-109393.pdf", "issued": "2026-09-02", "recipient_for_testimony": "House Committee on Veterans' Affairs", "read_status": "relevant cost-estimate, recommendation, and method passages read from official PDF; not a full document census", "finding": "GAO again says VA had delivered a notional schedule but not a cost estimate or sufficient detailed schedule documentation; as of August 2026, GAO still listed the updated independent life-cycle-cost-estimate recommendation as open/not implemented.", "method_and_comparator": "Restates the 2022 IDA $49.8b estimate and GAO's recommendations to obtain an updated independent estimate and reliable integrated master schedule.", "relation_to_cj": "A later oversight statement, not a cited FY2027-CJ source. It bears on what can be inferred from the CJ's high-level notification and does not establish that any particular hearing or GAO record formed VA's FY2027 request." } ], "notification_recovery_result": { "notification_date_claimed_by_cj": "2025-09-30", "notification_sender": "unidentified; CJ attributes action only to VA", "notification_recipient": "unidentified congressional recipient(s); CJ says Congress", "transmittal_or_report_identity": "not recovered", "supporting_cost_model_identity": "not recovered", "attachments": "not recovered", "method_inputs_known_only_from_cj": "historical costs plus projected resources to plan, procure, deploy, operate, and maintain 170 enterprise sites through end-2031; $10.5b obligated actual spending covers 2018-2024", "missing_method_details": ["cost base year and inflation/escalation treatment", "cost-element breakdown", "implementation versus sustainment horizon", "source appropriation/obligation extract", "risk/uncertainty and sensitivity analysis", "schedule linkage", "independent review/validation", "version/date of model"], "access_attempts": ["local saved material and Catalog text search", "official VA/site-specific web search for exact dollar/date phrases", "official Senate and GAO source review"], "access_limit": "No official public copy of the September 30 transmittal or $37.2b model/attachment was located in these searches. Absence from these locations does not establish nondelivery." }, "source_lineage_and_boundaries": { "request_lineage": "2025-03-28 bicameral/bipartisan committee leadership letter to Secretary Collins requested a detailed estimate by 2025-09-30.", "cj_lineage": "FY2027 Volume 5 later says VA notified Congress that date with a high-level $37.2b projection.", "oversight_lineage": "GAO December 2025 and September 2026 testimony state VA had not provided the updated cost estimate GAO regarded as needed, while acknowledging a notional schedule delivery.", "interpretation": "The available record supports an unresolved distinction between a VA high-level notification asserted in the CJ and a detailed, independent, best-practice life-cycle cost estimate sought by Congress and GAO. It does not establish that no September notification occurred or that its claimed figure was used in the FY2027 formulation." }, "related_hearings": { "identified": ["GAO-26-108812, December 15, 2025 House Technology Modernization Subcommittee testimony", "GAO-26-109393, September 2, 2026 House Veterans' Affairs Committee testimony"], "reliance_status": "related oversight records only; neither is proven to have been relied on by the FY2027 CJ or to contain the VA September 30 notification." }, "remaining_work": [ "Obtain the VA transmittal from the relevant congressional committees or VA EHRM/FOIA records, including any enclosure and recipient routing.", "Locate a versioned $37.2b cost model and reconcile its 2018-24 obligations, projected 2025/2026-31 costs, and horizon against the 2022 IDA estimate without substituting one for the other.", "Read GAO-25-106874 and the IDA 2022 estimate before judging methodological adequacy." ] }