.md · 2 sections · 16095 characters
workbench: Research Packages/Sovereign Compute/TRIBAL_DATA_CENTER_SOURCE_WATCHBOARD.md
Canonical source SHA-256: 7d1d2ddf1571a482090e5c7e9a93fad3f717eb566b70f274267e15000ddb1528
Served copy SHA-256: 7d1d2ddf1571a482090e5c7e9a93fad3f717eb566b70f274267e15000ddb1528
Owner evidence cutoffs: {"sovereign-compute": "2026-10-05"}
These are package-level cutoffs, not a claim that this source was rechecked on those dates. Use its own publication and capture dates.
Owners: sovereign-compute
Section 1 of 2
# Tribal data centers — source watchboard
Updated: 2026-08-27 Status: manual watch map; dated returns reconciled; successor returns ledger-governed Purpose: locate primary actions early without turning rumors or repeated press coverage into duplicate events.
[!caution] Freshness boundary The four dated return questions below were checked on 2026-08-27. The check produced negative or limited evidence, not proof that an unlocated action did not occur. Each successor source/state trigger is governed by the Research Return Ledger. The undated DOE convening and approximately September 2027 Colusa target remain standing package watches.
Watch the entity that can actually change the relevant state. A developer's press release can announce a partnership; it cannot prove a tribal lease. A tribal council can authorize a deal; it cannot prove grid capacity. A utility filing can establish an interconnection request; it cannot prove final construction. Each source is assigned to the clock it can move.
| Source | Clock | Trigger to capture |
|---|---|---|
| BIA approved HEARTH regulations | Land / leasing authority | New or amended business, energy, or general leasing regulations for a watched Tribe |
| BIA leasing services | Land / lease approval | Business lease, right-of-way, handbook, or approval-process change |
| BIA TERAs and TEDOs | Energy authority | New TERA or TEDO certification; scope and effective date |
| DOE Office of Indian Energy | Federal partnership / funding | Tribal Data Center Convening; site assistance; awards; webinars; legal or engineering guidance |
| DOE Indian Energy events | Convening | Agenda, speakers, participating Tribes, developers, matchmaking, or follow-up materials |
| FERC news and dockets | Grid / rates | Large-load tariffs, co-location, cost allocation, flexible load, generator tie, or tribal-energy filings |
| FAST-41 project dashboard | Federal permitting | Named data-center project, sponsor, site, lead agency, or tribal consultation |
| EPA data-center resources | Air / environmental | Turbine rules, exemptions, enforcement, permitting guidance, or tribal air-program action |
| Federal Register | General federal action | Data center + Tribe/Indian/Native/HEARTH/TERA/trust land; categorical exclusion; land solicitation; funding |
| New York Public Service Commission Case 26-E-0045 | New York grid / rates | Large-load interconnection rules, separate rate classes, cost allocation, technical conference, white paper, and Indigenous Nation comments |
| NYISO interconnection queue | New York power | New, modified, withdrawn, or completed large-load request near a New York Indigenous territory; owner, MW, point of interconnection, and in-service target |
| NYSDEC Indian Nation Affairs | Consultation / environmental | CP-42 consultation, environmental permit, cultural-resource review, or Nation-specific outreach for a data-center project |
| New York data-center legislation | State regulation | Governor action, effective date, implementing study, hearing rules, permit pause, rate classifications, and scope questions involving tribal parcels |
## Tribal-government and enterprise sources
| Entity | Primary pages or records | Trigger to capture |
|---|---|---|
| Cachil Dehe / Colusa Indian Community | Tribal council records; Colusa Indian Energy news; approved HEARTH text | Parcel, lease, Center of Excellence activation, generation permit/contract, financing, construction, tenant, or additional partner |
| Quechan Indian Tribe | Tribal announcements; Council and special-meeting records; Economic Development Administration; environmental-review notices | Due-diligence authorization, parcel/site map, developer identity, 200-MW power configuration, environmental scope, community vote, lease, or termination |
| Caddo Nation | Council agendas/minutes/resolutions; economic-development authority; tribal newspaper; BIA HEARTH text | Developer contact, RFP, resolution, referendum, parcel, lease, power or water agreement |
| Cherokee Nation | Executive orders; task-force pages; Council records | Data-center task-force report or extension; citizen input; policy; project or moratorium |
| Seminole Nation of Oklahoma | General Council/Tribal Council resolutions and minutes; official communications | Original March 7 moratorium; duration; amendments; developer identity; enforcement |
| Muscogee (Creek) Nation | National Council legislation and minutes; executive branch; Looped Square Ranch/food-sovereignty records | Substitute or reintroduced technology-park legislation, developer identity, parcel change, or new environmental safeguards following NCA 25-077's 4-11 defeat |
| Forest County Potawatomi / Potawatomi Ventures | Data Holdings; Potawatomi Ventures | Expansion, added power, new tribal-government customers, data-sovereignty service, ownership or campus change |
| Southern Ute | Tribal Council; Department of Energy; Growth Fund; TERA implementation | First project approved through TERA; large-load, generation, or digital-infrastructure application |
| Shoshone-Bannock | Official press releases; Pocatello administrative record | July 16 appeal, written decision, new project materials, treaty or consultation action |
| Yakama Nation | Tribal Council; cultural-resource and treaty-fisheries entities; Goldendale dockets | Historic-properties plan, consultation record, storage approval, land transaction, confirmed data-center offtaker |
| Oneida Indian Nation of New York | Oneida ordinances and regulations; Turning Stone Enterprises; Oneida Innovations Group; federal contract notices; utility and NYISO records | Location or expansion of four stated Tier III data centers; third-party hosting; sovereign-cloud offering; large-load request; new lease or equipment procurement |
| Tonawanda Seneca Nation | Nation correspondence; GCEDC STAMP library; Town of Alabama records; DEC and Army Corps records | Stream hearing, SEQRA determination, site-plan revision, 500-MW power instrument, tenant, generator air permit, water/wastewater decision, Nation response or litigation |
| Saint Regis Mohawk Tribe / Akwesasne governments | SRMT Council and Environment Division; Mohawk Council of Akwesasne; Mohawk Nation Council of Chiefs; Mohawk Networks; Massena planning records | Separate government positions; Massena site-plan and SEQR actions; power allocation; Alcoa sale; additional developers; 140-acre parcel status; tribal telecom or compute partnership |
| Seneca Nation of Indians | Council records; Seneca Holdings and Seneca Nation Group; Seneca Energy; broadband records | Physical cloud/data-center footprint; PPA or large-load study; site screening; developer approach; equipment or hosting contract |
| Shinnecock Indian Nation | Council records; Shinnecock Power; NTIA and ConnectALL records; LIPA dockets | Fiber completion, carrier/NOC agreement, energy project, edge/sovereign-cloud node, site or land-status action |
| Tuscarora Nation | Council/environmental records; Haudenosaunee Environmental Task Force; NTIA; NYPA Niagara records | Fiber completion, network operator, power or telecom enterprise, large-load or developer approach, consultation on nearby Niagara projects |
## Developer and capital sources
| Entity | Source | Trigger to capture |
|---|---|---|
| UnityCloud | Company website; corporate registrations; financing announcements | First named Tribe, parcel, signed agreement, financing, power partner, construction, or operating capacity |
| Strata Expanse | Company releases; SEC/REIT and financing records; local permits | Colusa site control, gray-space subscription, tenant, financing, equipment, second tribal partner |
| Colusa Indian Energy | News | Tribal power projects serving data centers; project-company creation; government funding; construction |
| STACK Infrastructure | Company releases; planning and utility dockets | Confirmed Indigenous-land, sacred-site, treaty, or tribal-power connection rather than geographic proximity alone |
| Hyperscalers and operators | SEC filings; company releases; state incentive contracts; utility dockets | Named tribal counterparty, land status, power seller, sovereign-cloud claim, or national-security workload |
| Brokers, project LLCs, and land companies | Secretary of State records; county land records; UCC filings; planning packets | Common officers, repeat law firms, options, assignments, financing, or migration from a blocked site |
## Utility and resource sources
For each confirmed site, identify the balancing authority, retail utility, water supplier, air regulator, and gas pipeline before searching their dockets.
Capture:
The economic-need hypothesis must be built nation by nation. For every watched Tribe, collect dated primary records for:
National gaming totals are a context series, not a substitute for tribal accounts. The current national baseline is record FY2024 gross gaming revenue, while particular Tribes may still face closure, market loss, debt, or extreme concentration. NIGC — FY2024 Gross Gaming Revenue
Use combinations rather than only “data center”:
Section 2 of 2
| Date | Watch | Expected source |
|---|---|---|
| 2026-07-16 | Pocatello appeal hearing for former Hoku-site project | City Council packet, recording, written decision; Shoshone-Bannock response |
| 2026-07-24, 5:00 p.m. EDT | DOE tribal-energy funding deadline | DOE award announcements and application summaries later in 2026 |
| Through 2026-08-14 | Cherokee data-center task-force report or extension | Cherokee Nation executive/task-force pages |
| 2026-08-13 | DOE webinar on tribal pathways in nuclear energy | Participant list and any explicit data-center/microreactor pairing |
| Date not announced | DOE Tribal Data Center Convening | DOE event page, agenda, attendees, presentations, resulting agreements |
| Approximately 2027-09 | Colusa target to exceed 100 MW onsite generation | Permits, equipment, financing, construction, commissioning |
## 2026-08-27 dated-return receipt
| Original return anchor | Bounded result through 2026-08-27 | Boundary and route |
|---|---|---|
2026-07-16 — Pocatello appeal hearing for former Hoku-site project |
Pocatello's official Agenda Center exposed the July 16 meeting/appeal surface, but the bounded check did not recover a controlling written disposition. | Access/locator hold; ledger-governed. Do not infer approval or denial. Return on a written decision, complete administrative record or attributable Shoshone-Bannock response. |
2026-07-24, 5:00 p.m. EDT — DOE tribal-energy funding deadline |
The application clock passed. DOE's program page places award announcements later in 2026; no award/result follows from deadline passage alone. | Resolved at the filing clock; ledger-governed successor. Return on a DOE award announcement or application/result summary. |
2026-08-13 — DOE webinar on tribal pathways in nuclear energy |
DOE now provides a recording and slides. The materials are general civilian-nuclear and microreactor support; they do not establish a named tribal data-center pairing. | Resolved negative for the pairing test; ledger-governed successor. Return on a named Tribe, site, developer, data-center project or executed support object. |
Through 2026-08-14 — Cherokee data-center task-force report or extension |
Cherokee Nation's current task-force page still lists the Data Center Task Force, but the bounded check did not locate a report or extension. | Negative public-source check; ledger-governed. Non-detection is not proof of nonproduction. Return on the report, written extension or official disposition. |
Date not announced — DOE Tribal Data Center Convening |
No dated gate was adjudicated by this receipt. | Standing watch / package-context-only. Keep the event, agenda, attendee, presentation and resulting-agreement triggers above. |
Approximately 2027-09 — Colusa target to exceed 100 MW onsite generation |
The target is future-dated and was not adjudicated by this receipt. | Standing watch / package-context-only. Keep permit, equipment, financing, construction and commissioning triggers above. |
<a id="yyyy-mm-dd-action-title"></a>### YYYY-MM-DD — action title
**Status:** Occurred / Announced / Proposed / Approved / Operating / Scheduled
**Entity acting:**
**Other entities named:**
**Project ID / aliases:**
**Clock:** Tribal government / land / developer / power / water-environment / capital / compute / revenue / resistance / national security
**Project stage before:**
**Project stage after:**
**Land status:** Verified / claimed / unknown
**Location:**
**Time:** Publicly stated / not publicly stated
One neutral paragraph stating what the source establishes and what remains unestablished.
**Primary source:** [Label](URL)
**Secondary corroboration:** [Label](URL), if needed
**Open document request:**
A lead becomes a confirmed project only when the record contains, at minimum:
No number of repeated articles can substitute for those fields.