.md · 2 sections · 23703 characters
workbench: Research Packages/Federal Government Weekly Delta 2026-09-16/waves/WAVE_4D_MILITARY_HOMELAND_RETRY.md
Canonical source SHA-256: fe885d6592f11a10cdd99ffb7f533ed7a6309855782ac90b8752bd11bbfd2b43
Served copy SHA-256: fe885d6592f11a10cdd99ffb7f533ed7a6309855782ac90b8752bd11bbfd2b43
Owner evidence cutoffs: {"federal-government-weekly-delta-2026-09-16": "2026-09-16T19:10:34-04:00"}
These are package-level cutoffs, not a claim that this source was rechecked on those dates. Use its own publication and capture dates.
Owners: federal-government-weekly-delta-2026-09-16
Section 1 of 2
# Wave 4D — military / homeland retry
Window: exclusive after 2026-09-11 16:01:37 EDT through frozen cutoff 2026-09-16 19:10:34 EDT
Mode: inspect-broadly / promote-narrowly on libraries, procurement dumps, PEO later clocks, CISA directives/ICS/KEV, FEMA declaration data. Not a recensus of Wave 2D press objects or Wave 3E IR 8587.
Discovery rule: official dedicated pages, print/search/mirrors, OpenFEMA, CISA feeds. Federal Register is not discovery.
Mutation: Workbench only. No vault, Catalog, Registry, watches, entity chart, app, or Git.
Award ≠ obligation ≠ payment ≠ delivery ≠ fielding. A 403/JS shell is a tool-path failure, not inactivity. 09-11 leftover holes recovered here stay 09-11-owned; they are not this-window atomics.
Recovered contract-day objects (09-11 hole closed as official HTML): dedicated War.gov pages for Sept. 3, 4, and 8 are now reached. Article IDs: 4590748 / 4591558 / 4592905. Largest unread-until-now awards on those dumps: CIRCM FRP IDIQ $4.838B (Sep 8); M1156 PGK IDIQ $862.8M (Sep 3); CVN 82 LLTM UCA $336.112M (Sep 4, official HTML now matches the company/secondary text); MDA IRBM/ICBM targets $508.5M (Sep 4; only $8.79M obligated); NASCM fire-control support $194.1M (Sep 3); DLA Pentaq fitness-gear add $763.1M ceiling (Sep 4, shared SPE1C1-25-R-0130 vehicle). Do not promote as this-window atomics. Disposition historical_repair into Weekly Delta 2026-09-11.
This window: no new Stafford major disaster after DR-4944. OpenFEMA recovered one in-window FMAG: FM-5676-AR Bunker Fire, declared 2026-09-15, incident began Sep 14. PA designated; IA not; no funding obligations displayed as of last refresh 2026-09-16. Wave 3E press walk missed it. Admit lower-rank. No new BOD/ED. KEV catalog refresh 2026-09-16 18:47 UTC (in-window) is routine under BOD 26-04 — fold to 3E. No Pantex B61-13 assembly-complete or War-acceptance clock. No War DPA Title I/III instrument. Feinberg memo / Elmet IBAS remain 2D; no new OSC/CAS Board implementing text retrieved (Feinberg PDF still Akamai 403).
Still blocked / unread: Sept. 16 contracts dump — dedicated slug not found; GlobalSecurity 16 Sep daily Defense Industry section empty (lists only Sept. 15). Treat as unread / not confirmed posted before freeze, not empty. Feinberg appendix PDF body still 403. Some PEO/DLA flagship URLs 403 from this host; newsrooms reached via search.
## Scope and required surfaces
| Surface class | Result |
|---|---|
| 1. library / publications / FOIA / archive | CISA directives library reached; ICS advisory library reached; FEMA OpenFEMA datasets reached; NNSA/Pantex news reached (people/9-11 features) |
| 2. manuals / transmittals / bulletins / policy memos | CISA BOD/ED reached; no new directive. Feinberg implementing appendix blocked (PDF 403) |
| 3. budget / AFR / procurement / grants | War dedicated contract pages Sep 3/4/8 reached; Sep 16 unread. PEO later clocks reached (thin) — award headlines only, no delivery |
| 4. operational dashboards / datasets / APIs | OpenFEMA FemaWebDisasterDeclarations reached; CISA KEV JSON reached (catalogVersion 2026.09.16, dateReleased 2026-09-16T18:47:50Z) |
| 5. organization / leadership / delegation | not this slice’s hunt except PAE/SSC newsroom locators |
| 6. OIG / GAO / court companion | not in-scope for 4D |
| 7. newsroom as locator only | used to find article IDs and PEO wrapping; 2D/3E press objects not rewritten |
| Hunt | Path | Result |
|---|---|---|
| War contracts Sep 3 | GS daily index 09-03_index.htm → dod-contracts_4590748.htm; official war.gov 4590748 |
reached official HTML |
| War contracts Sep 4 | GS dod-contracts_4591558.htm; official war.gov 4591558 (also GlobeNewswire tracker redirect of same slug) |
reached official HTML. Air Force block after NAVY not independently line-read (truncation on both hosts). Not treated as empty. |
| War contracts Sep 8 | GS dod-contracts_4592905.htm; official war.gov 4592905 |
reached official HTML through Air Force / small-business footnote |
| War contracts Sep 16 | guessed slugs 404; GS 09-16_index.htm Defense Industry blank; GS daily briefing lists only “Contracts for Sept. 15, 2026” |
unread / not confirmed posted |
| War contracts index | JS shell (“simulated response” / Load More) | dynamic_bounded — not a finding of silence |
| Army ACC / USAASC | PrSM wrapping Sep 3 is 09-11-window; no in-window delivery/obligation later clock on named Sep 14 awards | reached; empty later-clock |
| NAVAIR / PAE(A) | MQ-25 Lot 1 and Blackbeard production stories are 2D award headlines; deliveries still 2029 / lot-not-accepted | reached; empty later-clock |
| SSC / AFPEO / AFLCMC | Sentinel Pathfinder is 2D; SSC newsroom locator shows FireSat-S CDR Sep 14 and SCAR CSO Sep 16 (2D already has SCAR strategy). Individual SSC story HTML 403 this host | reached via index/search; story bodies mixed |
| DLA | newsroom reached via search; Sep 16 Distributed Production Wargame is pre-window event wrapping (2D fold). Commodity lines on recovered Sep 3/4/8 pages are 09-11 | reached; no distinct in-window production/finance object |
| NNSA / Pantex | Y-12 B61-13 CSA remains 09-10/09-11. Pantex homepage/press: people and 9/11 features; newest dated press remains 2025. No assembly-complete or War-acceptance receipt | reached; empty_hunt for later clock |
| CISA BOD/ED library | /news-events/directives/all newest still BOD 26-04 Jun 10; ED 26-03 Mar 11 (V1). BOD 26-04 implementation guidance last Updated: August 25, 2026 |
reached; empty_hunt for new directive |
| CISA ICS-CERT | ICS Advisories index: Sep 15 batch (CareCam CM2507, Siemens, Schneider, mySCADA, Wärtsilä, Digital Watchdog) already 3E. No Sep 16 ICS batch | reached; fold 3E |
| CISA KEV | JSON feed known_exploited_vulnerabilities.json |
reached; in-window dateAdded grouped (see below) |
| FEMA declarations data | OpenFEMA FemaWebDisasterDeclarations filter declarationDate ge 2026-09-11; disaster page /disaster/5676 |
reached. One FMAG. No new DR after 4944; no new EM after 3653 |
| Feinberg PDF / OSC-CAS | media.defense.gov PDF | blocked Akamai 403 this sitting. 2D already has release HTML + appendix bullets. No CAS Board proposal text, no OSC loan instrument |
## Recovered 09-11 contract-day objects (historical_repair — not this window)
These sat in the 09-11 unread hole. Official HTML now certifies them. They are not this-window promotions. Award ≠ delivery.
### A. Sept. 3 dump — Contracts for Sept. 3, 2026
Material (not each a new atomic even for 09-11):
W15QKN-26-D-A072. Ceiling ≠ kits in inventory.W56KGY-26-D-A002. 09-11 CPE-ISW wrapping cited $96.9M; official dump is $99,529,577. Face-value difference unresolved except that the dedicated page is the obligation instrument. Same REWSI family already 09-11.N0003026C7000 (optional CLINs included); Nuclear-Armed Sea-Launched Cruise Missile Program; FY25 reconciliation RDT&E Navy $135,303,302 obligated; ECD 2028-09-30; SSP. Support contract ≠ missile in inventory ≠ first SLCM-N round. 10 U.S.C. 3204(a)(1).N5005426C0002. Prototype/validation ≠ fleet facility fielded.M67854-23-9-0023; MARCORSYSCOM M67854-25-9-0122. PRM ≠ IOC.FA2834-24-C-B002; cumulative face $13,113,048,798 from $13,082,081,647. Survivable Airborne Operations Center sustainment increment, not a new aircraft.### B. Sept. 4 dump — Contracts for Sept. 4, 2026
Material:
N00024-26-C-2182; FY26 SCN $336,112,000 obligated; ECD March 2039; 10 U.S.C. 3204(a)(1). Official HTML now certifies the object 2D could only quote from secondary/company text. Advance procurement ≠ keel ≠ construction start. HII’s own release is 2026-09-11 (company wrapping of this dump).HQ0855-26-C-E001; performance Sep 2026–Aug 2035; Chandler AZ / Corinne UT / Elkton MD; only $8,786,477 FY26 RDT&E obligated. One offer. Ceiling ≠ targets flown.SPE1C1-26-D-0079; solicitation SPE1C1-25-R-0130 (shared ceiling; other awardees already on this vehicle from Apr/May); five-year base + five-year option; ordering period end Sept. 3, 2031; six responses. Ceiling ≠ gear delivered. Commodity.N00383-26-F-YY2B; $60,335,000 (25%) obligated; remainder committed. Repair DO ≠ aircraft delivered.N0002426C4401; options to $149,921,701; ECD Sep 2028. Availability ≠ ship back in fleet as a counted object.N00024-20-C-6249; new-construction and in-service SSN. Production mod ≠ mast installed.N00024-26-D-4314; no funds at award. Sustainment vehicle.N0003024C0100; FY26 WPN fully obligated; ECD 2030-09-30; PAE SSP. Design/development ≠ LE2 fielded.Section 2 of 2
### C. Sept. 8 dump — Contracts for Sept. 8, 2026
Material:
W58RGZ-26-D-0056. Work locations and funding with each order. Largest object on the unread 09-11 dumps. FRP vehicle ≠ CIRCM kits delivered ≠ aircraft fitted.W912DQ-26-C-A048. Construction award ≠ hangar in service ≠ B-21 based.FA8681-26-D-B003…-B006); full and subscale variants; ECD 2033-09-07 if option executed; $10,000 FY26 RDT&E obligated at award. Ceiling ≠ cases produced.N0042126D1004 for naval-air platform engineering/sustainment through Mar 2032; no funds at award. Services vehicle.Labor Day 2026 was Sep 7; no dedicated Sep 7 dump located (expected).
## This-window objects (narrow)
### 1. FEMA FM-5676-AR — Bunker Fire (Fire Management Assistance)
Actor: FEMA Region 6; Arkansas Division of Emergency Management
Clocks: incident began 2026-09-14; declaration 2026-09-15; OpenFEMA entryDate/updateDate 2026-09-15; disaster page last updated 2026-09-16. Incident end date null.
URLs: OpenFEMA · disaster page
Disposition: admit_lower_rank as a data-recovered FMAG. Not a Stafford major disaster. Wave 3E press walk recorded 0 new declaration.
PA designated (paProgramDeclared true); IA/IH/HM false. Funding-obligations block on the disaster page: “If and when financial assistance is approved for this disaster, it will be displayed here.” Empty as of the Sep 16 refresh. Declaration ≠ obligated dollar ≠ fire contained.
Claim limit: FMAG ≠ major DR. Not DR-4945. Not a successor to DR-4944 Colorado.
No other OpenFEMA declaration with declarationDate on or after 2026-09-11 through the freeze. Last major remains DR-4944-CO (declarationDate in the API 2026-09-01; 09-11 3E owned the Sep 4 press). Last emergency remains EM-3653-NV Hawk Fire (Sep 1).
### 2. CISA KEV catalog refresh 2026-09-16 (fold to 3E)
JSON catalogVersion 2026.09.16, dateReleased 2026-09-16T18:47:50.6796Z (~14:47 EDT, before freeze). In-window dateAdded rows actually in the feed:
| dateAdded | CVE | Product |
|---|---|---|
| 2026-09-11 | CVE-2026-84869 | ConnectWise ScreenConnect |
| 2026-09-11 | CVE-2026-42016 / CVE-2026-42018 | JFrog Artifactory |
| 2026-09-11 | CVE-2026-85706 | GitLab CE/EE |
| 2026-09-14 | CVE-2026-76461 | Cisco Secure Email Gateway |
| 2026-09-16 | CVE-2026-58704 | Google Pixel modem |
| 2026-09-16 | CVE-2026-76460 | Cisco ISE / ISE-PIC |
| 2026-09-16 | CVE-2026-87886 | Acronis Backup |
Sep 11 adds sit on the exclusive-start calendar day; 3E already grouped Sep 14 and Sep 16 (Pixel / Acronis / Cisco ISE). Sep 11 KEV is 09-11-adjacent. Routine catalog under BOD 26-04. Do not promote. Due dates in the catalog (e.g. Acronis due 2026-09-19) are BOD 26-04 clocks, not new directives.
## PEO later clocks on named in-window awards (2D objects — do not recensus headlines)
| 2D object | PEO/acquisition surface this sitting | Later clock? |
|---|---|---|
| PrSM Increment 2 EOC IDIQ (Sep 14, $1.211B) | USAASC Sep 3 wrapping is 09-11-window program narrative (MTA-RF pathway talk). No ACC Redstone delivery/order clock after the War dump | No. IDIQ ≠ first Increment 2 missile |
| MQ-25A Lot 1 LRIP (Sep 14 UCA $552.053M / news $562M) | NAVAIR/PAE(A) Sep 14–15 stories restated Lot 1 = three air vehicles, Lot 2 long-lead, initial deliveries 2029. Same clocks as 2D | No delivery. Face-value $552M vs $562M still unresolved; contracts page remains the obligation instrument |
| Blackbeard first production lot (Sep 14 $43.65M order / Navy wrap to $200M) | Navy press 2026-09-15 is the 2D wrapping. No accepted-AUR clock | No. 444 AURs still a lot size, not inventory |
| AMPV production mod (Sep 14 $818M) | No ACC Detroit later obligation/delivery page retrieved | No |
| Olin small-caliber IDIQ (Sep 11 $788M) | No ACC-RI later order clock | No |
| Sentinel Pathfinder inert stack (Sep 14) | AFNS/AFNWC reprints of the same 2D milestone. Flight test still 2027; IOC still early 2030s | No later flight/silo clock |
| Feinberg Fostering One Strong Industrial Base (Sep 15) | PDF still 403. No CAS Board proposal docket, no OSC loan term sheet, no first commercial determination under the 15-day clock | Memo only, as 2D |
| Elmet IBAS $450M (Sep 14) | No OSC implementing instrument on War/OSC pages. Company 8-K (locator only) is not official War text and is not recensus’d | Announcement only, as 2D |
SSC newsroom locator (index reached 2026-09-16): FireSat-S Critical Design Review Sep 14 (System Delta 810). CDR ≠ satellite on orbit. SCAR CSO strategy Sep 16 already 2D. DARC Site 3 Lake Kickapoo preferred location is 09-11. Individual SSC article HTML 403 this host.
## Fold-only / do not recensus
| Object | Owner | This retry |
|---|---|---|
| War contracts Sep 11 / 14 / 15 dumps | 2D | Fold. Not re-listed. |
| Feinberg memo; Elmet IBAS preferred equity | 2D | Fold. No implementing OSC/CAS text. Elmet is IBAS, not DPA Title III. |
| PrSM Inc 2; MQ-25 LRIP; Blackbeard lot; AMPV mod; Olin ammo | 2D | Fold headlines. Later-clock hunt empty. |
| NNSA Y-12 B61-13 CSA complete (stamp 2026-09-01; announced 2026-09-10) | 09-11 / 2C / 2D fold | Still no Pantex assembly-complete or War-acceptance receipt. CSA ≠ assembled bomb ≠ fielded B61-13. |
| EO 14427 DPA energy; EO 14426 Veterans | 1A / 1C | No War DPA Title I/III instrument on recovered dumps or War releases. Last retrieved War DPA Title III on war.gov remains out of window (BAE RH45 July 7). |
| CISA IR 8587 final | 3E | Fold. Not a BOD/ED. |
| CISA AA26-251A; LRA M-26-14 (Aug 20); BOD 26-04 (Jun 10); ED 26-03 (Mar 11) | 09-11 / 3E / standing | Did not fire. Agency Logging Plan still Nov 18. |
| CISA ICS Sep 15 batch; cyber-decoy Sep 16; TIC 3.0 minor | 3E | Fold. Vendor ICS ≠ BOD. |
| FEMA DR-4944; EAS test scheduled Nov 17; PA/HMGP obligation pressers | 3E / 09-11 | Fold. FM-5676 is a different instrument (FMAG). |
| DLA Distributed Production Wargame Sep 1–3 / Sep 16 story; Industry Collider Day Sep 9 | 2D | Fold as pre-window wrapping. |
| Griffon Outlaw Sep 4 announce / Sep 8 actual award | 09-11 | Fold the correction. |
| Crane MMR; JASSM/LRASM P00020; Nitradyn; NGEAU FRP; MK 48 options; DARC Site 3 | 09-11 2D | Fold. |
| Surface | Status | Note |
|---|---|---|
| war.gov Contracts Sept. 16 | unread / not confirmed posted | Dedicated article 404 on guessed slugs. GS 16 Sep daily Defense Industry section empty. Standing 5 p.m. dump, if posted, would sit before freeze (19:10:34 EDT) — still not retrieved. Not empty. |
| war.gov Contracts index | dynamic_bounded JS shell | Article URLs work when the ID is known. |
| Feinberg memo PDF (media.defense.gov) | blocked 403 | Release HTML in 2D. Appendix not line-read. |
| Sept. 4 Air Force block | unread (truncated) | NAVY through small-business footnote reached; AF section not independently hashed. |
| SSC individual story HTML | blocked 403 this host | Index/search reached (FireSat-S CDR locator; SCAR already 2D). |
| dla.mil / af.mil flagship | mixed; curl 403 on some paths | Reached via search this sitting (same 2D pattern). 403 ≠ inactivity. |
| SAM.gov / FPDS / USAspending | not recensus’d | Bounded. |
| Classified / nonpublic ops | classified_nonpublic | Not inactivity. |
| Publisher family | Status | Recovered / new | Fold / empty | Still blocked |
|---|---|---|---|---|
| War dedicated contract dumps | Sep 3/4/8 reached; Sep 16 unread | 09-11 hole closed as official HTML (CIRCM, PGK, CVN 82, MDA targets, NASCM, Pentaq, B-21 hangar, large-penetrator cases) | Sep 11/14/15 already 2D | Sep 16 dump |
| Service PEO (ACC, NAVAIR/PAE(A), SSC, AFPEO/AFLCMC) | reached via search/index | 0 delivery later clocks | award headlines 2D | some story HTML 403 |
| DLA | reached via search | 0 in-window production object | wargame wrapping 2D; Sep 4/8 commodity on recovered dumps | some flagship 403 |
| NNSA / Pantex | reached | 0 later clock | CSA fold | — |
| CISA directives / ICS / KEV | reached | 0 new BOD/ED; KEV refresh hashed | IR 8587 / ICS / KEV 3E | — |
| FEMA declaration data | reached | 1 FMAG (FM-5676) | DR-4944 / EAS / PA press 3E | — |
Lane closed? Yes for the named 4D must-retrieves that can be closed from public HTML: Sept. 3/4/8 dedicated contract pages are now official-page-reached; CISA directive library empty of new BOD/ED; FEMA OpenFEMA has one in-window FMAG and no new major DR; Pantex later-clock empty; PEO later-clock empty on named 2D awards. No for a complete business-day contracts series — Sept. 16 dump still unread. Feinberg appendix PDF still blocked.
This is public-surface research, not a census of every PEO, SAM award, classified OTA, or Stafford worksheet.