.json · 2 sections · 15192 characters
workbench: _Working/federal-budget-2026-2027/goal/terra_human/va/batch27/VA_FY2027_VOLUME4_PHYSICAL_1_40_AUDIT.json
Canonical source SHA-256: 7944e88bce40bd5d2d5b1436ac97dd966887fa76911c8b4aa8469cb78a445e3c
Served copy SHA-256: 7944e88bce40bd5d2d5b1436ac97dd966887fa76911c8b4aa8469cb78a445e3c
Owner evidence cutoffs: {"federal-budget-fy2026-fy2027": "2026-09-11T19:55:13-04:00"}
These are package-level cutoffs, not a claim that this source was rechecked on those dates. Use its own publication and capture dates.
Owners: federal-budget-fy2026-fy2027
Section 1 of 2
{ "artifact_type": "bounded_full_sequential_CJ_read_receipt", "status": "complete_for_assigned_physical_page_range", "created": "2026-09-11", "source_document": { "identity": "U.S. Department of Veterans Affairs, FY 2027 Budget Submission, Volume 4 of 5: Construction, Long Range Capital Plan and Appendix", "official_url": "https://department.va.gov/wp-content/uploads/2026/04/Volume-4.pdf", "document_date_on_cover": "March 2026", "official_landing_page": "https://department.va.gov/administrations-and-offices/management/budget/", "physical_pdf_page_count_observed_in_official_reader": 502, "landing_page_metadata_page_count": 424, "identity_and_denominator_disposition": "The official PDF cover identifies this as Volume 4 of 5. The VA landing-page metadata says 424 pages; the official PDF reader reports 502 physical pages. Both are preserved; this receipt uses the observed 502-page physical-PDF denominator.", "source_access": "Official PDF read in browser/extraction reader. A local direct-download/extraction attempt did not create /tmp/va-volume4.pdf and pdftotext was unavailable, so no local-PDF path is claimed." }, "page_coverage": { "physical_pdf_pages_read": "0-39 inclusive (40 pages, with zero-based physical reader indexing)", "printed_content_covered": "cover; intentionally blank physical p1; TOC printed i-1 to i-2; Introduction printed i-3 to i-12; Construction Summary 1-1 to 1-6; Construction, Major 2-1 to 2-20", "sequential_read_method": "All assigned physical pages were read in order through the official PDF reader. Tables were inspected for headings, year/basis labels, totals, and source/method identifiers; they were not transcribed cell-by-cell.", "next_unread_physical_page": 40, "next_unread_printed_page_expected": "2-21 (confirm against the PDF when opening next batch)", "remaining_scope": "physical pp.40-501, subject to the same printed/physical page-map reconciliation" }, "claims_and_evidence_boundaries": [ { "printed_pages": "Introduction i-5 to i-12; Construction Summary 1-1 to 1-6", "claim": "VA requests $5.4 billion in FY2027 construction resources: $3.95 billion discretionary appropriations plus $1.45 billion anticipated RETF resources ($1.3 billion Major, $150 million Minor).", "status": "FY2027_budget_request_and_planned_transfer", "evidence_boundary": "The $1.45 billion is described as an anticipated transfer of unobligated balances into RETF at the end of 2027, not as enacted or realized funding. The tables label some NRM values as planned FY2027 obligations." }, { "printed_pages": "Introduction i-7 to i-12; Construction Summary 1-3 to 1-6", "claim": "VA describes SCIP as the annual framework that uses gap data, 10-year action plans, business cases, panel ratings, and leadership-approved priority weights to rank capital requests; funding selection also reflects budget process, execution readiness, policy decisions, studies, and scheduling conflicts.", "status": "agency_process_and_budget_formulation_description", "evidence_boundary": "The narrative establishes VA's stated selection process, not that a given score caused an appropriation or that a selected project will meet its outcomes. Project scores and gap inputs are agency process artifacts; originals were not separately read." }, { "printed_pages": "Construction Summary 1-5 to 1-6", "claim": "VA estimates full implementation of the SCIP plan at approximately $98-$109 billion including activation costs.", "status": "agency_snapshot_estimate", "evidence_boundary": "VA expressly calls this a snapshot based on current market conditions, baseline portfolio, demographic data, and projected needs; it says costs will change as estimates and requirements are refined. It is not a funded commitment, actual cost, or validated forecast interval." }, { "printed_pages": "Construction, Major 2-1 to 2-8", "claim": "The FY2027 Major Construction request is $3.089 billion appropriations plus $1.3 billion anticipated RETF resources. The request table distinguishes FY2025 actual, FY2026 original budget estimate, FY2026 current estimate, and FY2027 request.", "status": "mixed_actual_estimate_request_table", "evidence_boundary": "Only the FY2025 column is labelled actual. FY2026 current estimate and FY2027 request are distinct planning bases. Unobligated-balance and obligations rows include expired budgetary resources as footnoted." }, { "printed_pages": "Construction, Major 2-13 to 2-18", "claim": "VA requests $1.64157 billion in FY2027 for the Indianapolis replacement VAMC/MSOC, central utility plant, parking, and initial land/construction funding; it designates New Construction as the preferred alternative.", "status": "project_request_and_agency_preferred_alternative", "evidence_boundary": "The prospectus records total estimated cost as TBD until design reaches 15% and/or the Army Corps of Engineers accepts the project. It reports a 2024 demographic/workload baseline and projected 2029/2034/2044 figures for the VISN 10 Indiana Market; the future columns are forecasts, not observed utilization." }, { "printed_pages": "Construction, Major 2-19 to 2-20", "claim": "VA requests $30 million to acquire land for future construction of a San Antonio healthcare facility; total cost and future construction remain TBD.", "status": "project_request_with_future_activity", "evidence_boundary": "This is land-acquisition funding and a preferred-alternative narrative, not evidence that a facility has been authorized, built, or is operational. The prospectus states its cost will be developed after 15% design and/or Army Corps acceptance." } ], "formulation_inputs_and_named_upstream_objects": [ { "id": "v4_scip_process_and_inputs", "identity": "VA Strategic Capital Investment Planning (SCIP) process, including 10-year gap analysis, long-range action plans, business cases, SCIP Board weights, SCIP Panel ratings, and executive review", "type": "agency planning/scoring process and underlying administrative/forecast data", "printed_CJ_pages": ["i-7", "i-8", "i-9", "i-10", "i-11", "i-12", "1-3", "1-4", "1-5", "1-6", "2-3", "2-15", "2-20"], "role_in_CJ": "Stated capital-budget formulation mechanism: compares current portfolio and gap data with projected needs, scores business cases, ranks projects, and informs long-range and annual funding lists.", "status": "described_in_CJ_only", "url": null, "limits": "No gap-data extract, decision-criteria model, weights, scoring record, business case, or independent validation was read. Some funding decisions are explicitly outside rank order." }, { "id": "v4_pact_act_major_lease_authority", "identity": "Sergeant First Class Heath Robinson Honoring our Promise to Address Comprehensive Toxics Act of 2022 (PACT Act), Public Law 117-168", "type": "law", "printed_CJ_pages": ["i-4", "i-7", "i-8", "1-5"], "role_in_CJ": "CJ says the Act changed the major-lease congressional-resolution threshold and supplies lease funding context.", "status": "cited_in_CJ_only", "url": "https://www.congress.gov/117/plaws/publ168/PLAW-117publ168.pdf", "limits": "Act not read in this batch; this record preserves the CJ's use, not an independent legal interpretation." }, { "id": "v4_40usc3307_and_a11_threshold", "identity": "40 U.S.C. §3307 and OMB Circular A-11 (signed August 29, 2025, as described by the CJ)", "type": "statute and budget guidance", "printed_CJ_pages": ["i-8", "1-5"], "role_in_CJ": "CJ identifies the annual-rent lease threshold and says Circular A-11 changed the FY2027/FY2028 threshold to $4,109,355.", "status": "cited_in_CJ_only", "url": null, "limits": "Neither authority/guidance document nor the threshold calculation was read. The date and amount are agency narrative, not independently verified here." }, { "id": "v4_real_property_reporting_authorities", "identity": "Federal Property Management Reform Act of 2016 (P.L.114-318); Federal Real Property Council guidance; 38 U.S.C. §8168; OMB Memorandum M-20-03; and 40 U.S.C. §621", "type": "compound statutory/guidance bundle", "printed_CJ_pages": ["i-9"], "role_in_CJ": "CJ identifies these as the reporting/capital-planning authorities for disposal/reuse, EUL reporting, and real-property capital planning.", "status": "cited_in_CJ_only", "url": null, "limits": "Compound bundle retained because the page lists multiple authorities. No original law, memorandum, council guidance, report, or compliance record was read." }, { "id": "v4_title38_major_construction_authorities", "identity": "38 U.S.C. §§316, 2404, 2406, chapter 81, and §8104(a)(3)(A)", "type": "compound statutory authority bundle", "printed_CJ_pages": ["2-1", "2-2", "2-3"], "role_in_CJ": "Cited in proposed Major Construction appropriation language and its project-cost/authorization threshold description.", "status": "cited_in_CJ_only", "url": "https://uscode.house.gov/", "limits": "Exact section-level text not read. This is a cited authority set, not a conclusion that the request is enacted or authorized." }, { "id": "v4_wla_master_plan", "identity": "Greater Los Angeles Health Care System–West Los Angeles Draft Master Plan (January 2016) and VA's March 2022 update", "type": "agency master plan/strategy", "printed_CJ_pages": ["2-8", "2-10"], "role_in_CJ": "Stated framework for West Los Angeles campus revitalization and NCWI-related infrastructure descriptions.", "status": "described_in_CJ_only", "url": null, "limits": "Underlying plans and update not read; the CJ's description is not a project-outcome evaluation." }, { "id": "v4_wla_leasing_acts", "identity": "West Los Angeles Leasing Act of 2016 (P.L.114-226) and West Los Angeles VA Campus Improvement Act of 2021 (P.L.117-18)", "type": "compound law bundle", "printed_CJ_pages": ["2-8"], "role_in_CJ": "CJ says the laws modify/extend enhanced-use lease authority for West Los Angeles campus partnerships.", "status": "cited_in_CJ_only", "url": null, "limits": "Neither law read; the receipt does not independently validate the statutory effect or any individual lease." }, { "id": "v4_eo14296", "identity": "Executive Order 14296, Keeping Promises to Veterans and Establishing a National Center for Warrior Independence", "type": "executive order", "printed_CJ_pages": ["2-8"], "role_in_CJ": "CJ describes it as refining the future role of the West Los Angeles campus and NCWI.", "status": "cited_in_CJ_only", "url": null, "limits": "Order not read in this batch; CJ role is preserved without inferring a funding obligation or project outcome." }, { "id": "v4_wla_eul_operations_data", "identity": "West Los Angeles enhanced-use lease execution, construction, and operational-status records", "type": "agency/lessee administrative project-status data", "printed_CJ_pages": ["2-8", "2-9"], "role_in_CJ": "Supports the narrative's dates, units, lessees, construction, and operating-status claims for specific WLA EUL projects.", "status": "agency_data_described_in_CJ_only", "url": null, "limits": "Underlying leases, amendments, construction records, occupancy data, and performance results were not read. Operational status does not establish program effectiveness." }, { "id": "v4_indianapolis_market_and_workload_forecasts", "identity": "VISN 10 Indiana Market demographic and workload data/projections",
Section 2 of 2
"type": "agency demographic/workload data and forecast",
"printed_CJ_pages": ["2-17"],
"role_in_CJ": "Input to Indianapolis project need and capacity narrative; includes 2024 values and projections through 2044.",
"status": "agency_data_and_forecast_in_CJ_only",
"url": null,
"limits": "Source dataset, definitions, model, and forecast uncertainty absent. The 2024 observation and projected outyears must not be treated as the same evidentiary type."
},
{
"id": "v4_indianapolis_market_research",
"identity": "High-level market research for acquisition/renovation alternative at Indianapolis",
"type": "unnamed market-research input",
"printed_CJ_pages": ["2-16"],
"role_in_CJ": "CJ says it indicated no suitable existing facility in the delineated market area.",
"status": "described_in_CJ_only_identity_unresolved",
"url": null,
"limits": "No title, date, preparer, method, search boundary, findings file, or URL supplied. It cannot be treated as independently checked evidence."
},
{
"id": "v4_army_corps_design_cost_gate",
"identity": "Army Corps of Engineers project acceptance / 15-percent-design cost-development gate",
"type": "agency process and future cost-estimation condition",
"printed_CJ_pages": ["2-13", "2-17", "2-19"],
"role_in_CJ": "CJ conditions completion of total estimated-cost/project-cost analysis on reaching 15% design and/or Army Corps acceptance.",
"status": "described_in_CJ_only",
"url": null,
"limits": "No acceptance document, cost estimate, design package, or independent cost review was read. It signals material unresolved cost uncertainty."
}
], "table_and_measure_handling": { "observed_or_actual_labels": [ "FY2025 Major Construction table column labelled Actual", "Indianapolis 2024 demographic/workload baseline values, expressly identified as VISN 10 Indiana Market data" ], "estimate_forecast_or_request_labels": [ "FY2026 Budget Estimate and FY2026 Current Estimate table columns", "FY2027 appropriation and resource requests; anticipated RETF transfer; planned NRM obligations", "Indianapolis 2029, 2034, and 2044 demographic/workload values; design-build and construction schedule", "SCIP $98-$109 billion full-implementation magnitude estimate; all TBD project/activation costs" ], "interpretive_limit": "A capital-project priority score, a project request, and a future schedule are planning/formulation instruments. They do not show a completed facility, realized cost, service-access outcome, or causal performance effect." }, "remaining_work": [ "Read physical pp.40-501 sequentially; reconcile printed labels and blanks with this physical-page denominator.", "Expand original sources only in separate upstream tasks, especially SCIP models/weights/gap data, market research, master plans, statutory and executive authorities, leases, and project cost documents.", "Do not infer enacted appropriations, authorization, construction start, operational delivery, or outcome attainment from FY2027 request narratives." ] }