NSSTS Wave 2 — Claim Audit and Forward Watchboard

.md · 1 sections · 9271 characters

Source, owner, and dates

workbench: Research Packages/Federal Science Operating System/NSSTS Technology-to-Company Map 2026-08-18/NSSTS_WAVE_2_CLAIM_AUDIT_AND_WATCHBOARD_2026-08-18.md

Canonical source SHA-256: 52d41e44d258edad24db19b8e1caad4ad1b489d631fbcd5c495d830ce3b7bd14

Served copy SHA-256: 52d41e44d258edad24db19b8e1caad4ad1b489d631fbcd5c495d830ce3b7bd14

Owner evidence cutoffs: {"nssts-technology-company-map": "2026-08-19"}

These are package-level cutoffs, not a claim that this source was rechecked on those dates. Use its own publication and capture dates.

Owners: nssts-technology-company-map

NSSTS Wave 2 — Claim Audit and Forward Watchboard

Section 1 of 1

# NSSTS Wave 2 — Claim Audit and Forward Watchboard

Evidence cutoff: 2026-08-18
Status: active workbench control record
Scope: energy systems, advanced manufacturing and critical-materials company edges

## Claim rulings

Unsafe compression Ruling
A named company on an AI-campus announcement supplies the turbines or cooling system. Not supported. The current federal project releases do not name those OEMs.
A 48C allocation means the factory is operating. False. Allocation, construction, production start and accepted delivery are separate.
A FITT or GRIP selection is an accepted grid deployment. False. Preserve selected, awarded, installed, commissioned and accepted.
A Transmission Facilitation Program selection means the HVDC line will be built. False. Contract, permit, financing, NTP and energization remain open.
An advanced-reactor construction permit means the plant may operate. False. Operating license, fuel, commissioning and generation remain separate.
A selected SMR project is a reactor order. False. Selection does not establish final award, permit or procurement.
A fusion Milestone participant is building a commercial power plant. False. Preserve design, component, device, site, license and electricity states.
A federal loan means project funds have all been drawn. False. Closing, disbursement, construction and repayment are distinct.
Announced magnet nameplate equals qualified production. False. Customer qualification and recurring delivery control.
U.S. magnet manufacture proves fully domestic feed. False. Oxide, metal/alloy and other origin seams remain material.
A DLA magnet order proves delivery. False. It confirms acquisition; completion and acceptance remain later objects.
A gallium or germanium award proves new output. False. Equipment installation, commissioning, purity and customer acceptance remain gates.
A demo-scale separation award can be added to commercial supply. False. Demonstration and production must not share a capacity total.
Major construction at Thacker Pass means lithium production. False. Mechanical completion, commissioning and battery-grade qualification are open.
Demonstration HALEU output equals commercial-scale supply. False. Expanded licensed cascades and fuel-chain delivery are still required.
An IDIQ ceiling is contractor revenue. False. Task orders and obligations control.
An America Makes winner is already a qualified supplier. False. Selection begins a process-control and qualification path.
Named GOTHAAM team membership proves the partner’s functional workshare. Not yet. Membership is public; role allocation remains inferred.
HiCAM or ARM membership proves a company-specific award. False. Require a funded task, contract, accepted article or transition object.
SMART USA remains a live path. False. The federal award was terminated and funding withdrawn.

## Near-term return gates

Watch Current state Return object that upgrades the map Downgrade or disconfirm
America Makes INSITE award notice scheduled for 2026-08-30 named teams for in-situ sensing, NDE and defect correlation delayed/canceled notice or no company role
America Makes MIAMI anticipated decision date passed named metal-interchangeability award teams call canceled or scope removed
Delta Qual 2.0 anticipated decision date passed machine calibration and installation-qualification winners no award or program closure
GRIP / Switched Source selected in DOE status table executed award and accepted Fort Bliss/utility deployment rescission or failed demo
Siemens Energy Charlotte factory under construction production start, qualification and first order schedule/certification failure
FITT transformer projects selected development paths installed public-utility demonstration with performance record cancellation or failed test
Southern Spirit HVDC capacity-contract selection executed contract, permits, finance and named suppliers withdrawal, denial or redesign
TerraPower Natrium construction permit issued operating-license progress, fuel and major nuclear build milestones suspension, fuel or license failure
X-energy / TRISO-X factory build and ARDP path licensed qualified fuel output and Seadrift permit HALEU, license or customer failure
Kairos Hermes construction operating authorization, fuel loading and criticality construction halt or license failure
Holtec SMR-300 selected final award, NRC authorization and site work rescission or review failure
TVA / BWRX-300 application docketed construction permit and long-lead orders TVA withdrawal or adverse review
BWXT SMR components selected capacity project installed nuclear-QA line and customer order qualification or demand failure
DLA magnet orders orders issued delivery acceptance and options late/rejected delivery
MP Independence / 10X startup / planned build qualified recurring magnet sales; installed 10X equipment qualification or scale failure
USA Rare Earth commissioned/planned multi-site platform named shipment and verified run rate; Blacksburg construction ramp or finance failure
Energy Fuels HREE under construction commissioned Dy/Tb line and customer-qualified shipment purity, schedule or customer failure
ReElement expansion funded installed line with measured output and named buyer scale economics or feed failure
Syrah Vidalia operating / qualifying recurring accepted commercial volumes qualification or Mozambique disruption
Thacker Pass major construction mechanical completion and battery-grade qualification cost/schedule/market scope failure
Project Crucible final award / preconstruction EPC mobilization and first commissioned product line finance, permit or schedule failure
American Centrifuge demo output + expansion contract new cascade installation and NRC authorization centrifuge, license or schedule failure
General Matter task order + site preparation accepted NRC application and construction notice technology or license failure
GOTHAAM GA-ASI selected prime workshare, process-control plan and validated allowables failure to reproduce properties
JAQS-SQ winners selected approved supplier processes and transition orders audit or transition failure
AFRL active contracts dated 2025 portfolio newer modification, accepted milestone or transition user termination or stale state
Sedaro IDIQ vehicle awarded material task-order flow and named program use no task orders or cancellation
QTIME leads selected validated rapid NDI in DoD/FAA/NASA production performance or transition failure
SMART USA terminated no promotion trigger; historical only any use as live PATH evidence

## Leading indicators by sector

### Energy and grid

High-value signals are executed capacity contracts, utility acceptance, energization, NRC permits and operating authorizations, fuel loading, long-lead equipment orders and named project suppliers. Load forecasts, queue positions, job postings and generic factory expansion are discovery signals only.

### Critical materials

High-value signals are direct orders, milestone disbursements, commissioned processing lines, certificates of analysis, origin records, named customer qualification and recurring deliveries. Nameplate announcements and planned tonnes decay quickly without these objects.

### Advanced manufacturing

High-value signals are contract modifications, process-control plans, statistical allowables, NDE acceptance, approved supplier status, flight or production articles, and a named transition user. Institute membership and printer ownership do not substitute for qualification.

## Required source surfaces

## Recheck cadence