Skip to content
Browse the whole research Library · Start page for AI agents ·

batch3 — FY2027 C-1: physical PDF pages 150–224

.md · 1 sections · 1778 characters

Source, owner, and dates

workbench: _Working/federal-budget-2026-2027/goal/terra_institutions/defense/c1/batch3/REPORT.md

Canonical source SHA-256: 04cb4c2aaaedf72a0ef8db95bc638f750f63dac8e42525cdba3f2f051b5a7415

Served copy SHA-256: 04cb4c2aaaedf72a0ef8db95bc638f750f63dac8e42525cdba3f2f051b5a7415

Owner evidence cutoffs: {"federal-budget-fy2026-fy2027": "2026-09-11T19:55:13-04:00"}

These are package-level cutoffs, not a claim that this source was rechecked on those dates. Use its own publication and capture dates.

Owners: federal-budget-fy2026-fy2027

complete text

FY2027 C-1: physical PDF pages 150–224

Section 1 of 1

# FY2027 C-1: physical PDF pages 150–224

This staged receipt reads one-based physical PDF pp. 150–224 of the 450-page official FY2027 Military Construction and Family Housing C-1, using pypdf indices 149–223. The first page overlaps the preceding batch because batch2 used zero-based indices through 149; the overlap closes the page-convention boundary without a coverage gap. New material begins at one-based p. 151. Pages 225–450 remain unread.

Pages 150–200 are explicitly headed FY 2026 … as Enacted, including domestic, overseas, unspecified-location, and family-housing tables. They are historical accounting comparators. Their authorization, authorization-for-appropriations, appropriation-amount, and TOA columns are distinct. The FY2026 domestic total at p. 179 is $15.321 billion authorization, $13.865 billion authorization for appropriations, and $13.741 billion each for appropriation amount and TOA.

Pages 201–224 begin the FY2027 domestic project listing, explicitly headed Total Obligation Authority as Requested. This supplies request-side allocations—not FY2027 enactments—and the range ends before a FY2027 total. It gives no narrative project rationale, cost methodology, requirements analysis, or performance estimate. No separately named study, strategy, model, audit, statute, or decision record occurs in this range. Project and program labels remain allocation identifiers, with individual supporting justifications and source materials queued rather than presumed reviewed.

See DEFENSE_FY2027_C1_P150_P224_RECEIPT.json for exact read coverage, accounting locators, the evidence-input census, and remaining scope.