.md · 1 sections · 10998 characters
workbench: Research Packages/Economic Institution Legitimacy Crisis 2025-2026/WAVE_3_TIMELINE_SCHEMA_AND_SELECTION_RULES_2026-09-02.md
Canonical source SHA-256: 19ea938a84d3bb832ddb20af78b4fc7e085a513d2ff789c7f529d7236af14396
Served copy SHA-256: 19ea938a84d3bb832ddb20af78b4fc7e085a513d2ff789c7f529d7236af14396
Owner evidence cutoffs: {"economic-institution-legitimacy-crisis": "2026-10-12T18:25:00-04:00"}
These are package-level cutoffs, not a claim that this source was rechecked on those dates. Use its own publication and capture dates.
Owners: economic-institution-legitimacy-crisis
Section 1 of 1
# Wave 3 — Timeline Schema and Selection Rules
Status: working method; unreviewed
Date: 2026-09-02 ET
Purpose: govern the dated spine before any interactive timeline is built
Boundary: chronology does not establish coordination, causation, or a
legitimacy verdict
The timeline should reveal how different institutional clocks move in relation to one another. It should not flatten every document, announcement, law, standard, launch, court order, operating result, and public reaction into one kind of “event.”
The central visual question is:
When capability, adoption, law, supervision, authoritative records, remedy, and accepted legitimacy move at different speeds, where does the gap widen, narrow, or become contested?
The timeline treats legitimacy crisis as the interpretive lens over the dated record. It does not wait for an institution to publish that diagnosis. Events should preserve observable proxies—bypass, refusal, workaround, reliance shift, selective treatment, opacity, non-delivery, correction failure, burden shift, or loss of recognized authority—while keeping the project's inference separate from the source's own words.
Include an event only when a controlled source shows that at least one of these changed:
Include a speech, hearing, communiqué, or proposal only when it is itself a material institutional position, formal input, authorization-stage object, or direct legitimacy claim. Repeated rhetoric without a changed object belongs in source history, not the primary timeline.
Each event should carry:
event_idtitlesummarydomaincase_idsinstitutionsfunction_at_issueconsequential_objectsource_ownersource_pathssource_lifecycleevidence_directnessobject_statelegitimacy_dimensionsclock_changesunchanged_clocksaccountability_changelegitimacy_indicatorscounterevidenceclaim_limitnext_returnrelationship_idsrelationship_typesAn event may have several dates. Never force them into one field.
| Date field | Meaning |
|---|---|
announced_at |
Public announcement or release |
published_at |
Official publication or filing clock |
signed_at |
Signature or execution clock |
legal_effective_at |
Date the law, rule, order, agreement, or status legally takes effect |
operating_at |
First verified operation or production use |
observed_at |
First externally observed result, failure, complaint, or behavior |
corrected_at |
Correction, amendment, reversal, waiver, restatement, or remedy |
expires_at |
Sunset, account term, pilot close, deadline, or authority lapse |
source_as_of |
Exact cutoff of the controlling research object |
Every date must also carry:
date_precision — timestamp, day, month, quarter, year, or bounded range;timezone where material;date_source — the object controlling that clock; anddate_status — confirmed, reported, scheduled, proposed, inferred, or
unresolved.A scheduled date is not an observed event. A legal effective date is not proof of operation. A later announcement may describe an earlier legal or operating state. The timeline should be able to display all three without rewriting history.
Use the narrowest supported state:
institutional_positionhearing_or_commentintroducedproposedfinalizedsignedlegally_effectiveeligibleapprovedcontractedpilotinglimited_operationrecurring_operationstress_observedfailure_observedchallengedstayed_or_enjoinedcorrected_or_waivedsupersededexpiredunknownDo not use live as a whole-system state.
technical_capabilityadoption_or_reliancelegal_authoritystandard_or_supervisionauthoritative_recordfailure_correction_or_remedyaccepted_legitimacycapacity_or_carrierevidence_stateAn event should name both clock_changes and unchanged_clocks. For example:
SEC transfer-agent proposal
changed: legal-authority proposal and record-governance design
unchanged: final law, effective date, registered operation, failure remedy,
investor acceptance
## Evidence-directness vocabulary
legitimacy_indicator — explicit legitimacy/trust language or observable
acceptance, refusal, exit, bypass, reliance shift, fairness, remedy, or
recognized-authority evidence that bears directly on the analytic lens;direct_outcome — measured operation, performance, failure, correction, or
remedy bearing on legitimacy;institutional_contest — formal incompatible authority positions, court,
oversight, comment, or waiver dispute;mechanism — explains how control, capability, or responsibility can move;context — materially situates the event without bearing directly on the
legitimacy question; orcounterexample — successful adaptation, lawful pluralism, institutional
resilience, or another fact that weakens a crisis reading.More than one role may apply, but the timeline should visually distinguish direct evidence from mechanism and context.
Chronological proximity is not a relationship. Link events only with an explicit, sourced relation:
implementsauthorizesconstrainsresponds_tochallengesstays_or_enjoinscorrectssupersedesextendsexpiresoperationalizesmeasures_outcome_ofshares_standard_withcomparison_controlsame_period_onlysame_period_only is a warning, not evidence of coordination.
The first timeline should support these filters:
An event can appear in more than one lane without being duplicated in the source registry.
## Required visual modes later
The eventual interactive surface should be able to render the same events as:
The view should never calculate a single legitimacy score.
## Selection and compression rules
### Exclude from the factual timeline
An announcement can precede legal publication, effectiveness, contract, adoption, and operation by months or years. Display those later clocks as separate events.
A public notice may describe an agreement or status effective earlier. Preserve both publication and effective dates.
Controlled real-value testing, sandbox permission, a named participant, and limited production are not equivalent to recurring general operation.
### Institutional-position inflation
A speech by a powerful official may be direct evidence of a legitimacy claim, but it is not proof that the institution, legislature, public, market, or counterparty accepts the claim.
Complaint, temporary order, stay, preliminary injunction, merits judgment, appeal, mandate, and operational compliance are different events.
Forum endorsement, technical guidance, industry standard, domestic rule, supervisory practice, participant agreement, and court-recognized effect are different clocks.
Shared dates can reflect common calendars, reporting cycles, political
attention, or coincidence. Causation requires an explicit source or a stated
and testable inference; otherwise use same_period_only.
Later facts may change the status of an earlier claim. Preserve the earlier event's historical object state and add a correction, supersession, or evidence- state event rather than rewriting the earlier entry as if the later state were already known.
Each timeline event must point to the current component owner and at least one controlling source path. An umbrella synthesis, Crypto Hub card, generated view, or this project may route the reader but cannot replace the source owner.
Wave 3 is complete when: