Skip to content
Browse the whole research Library · Start page for AI agents ·

DEFENSE FY2027 C1 P75 P149 RECEIPT

.json · 1 sections · 8429 characters

Source, owner, and dates

workbench: _Working/federal-budget-2026-2027/goal/terra_institutions/defense/c1/batch2/DEFENSE_FY2027_C1_P75_P149_RECEIPT.json

Canonical source SHA-256: 6627c3b514414823ab1099d3fe684e6f7109dabec0a6dfad9792c710ba7af8aa

Served copy SHA-256: 6627c3b514414823ab1099d3fe684e6f7109dabec0a6dfad9792c710ba7af8aa

Owner evidence cutoffs: {"federal-budget-fy2026-fy2027": "2026-09-11T19:55:13-04:00"}

These are package-level cutoffs, not a claim that this source was rechecked on those dates. Use its own publication and capture dates.

Owners: federal-budget-fy2026-fy2027

complete text

Opening section

Section 1 of 1

{ "receipt_type": "bounded_document_read", "agency": "Department of War (Defense)", "document": { "title": "Military Construction and Family Housing — C-1", "fiscal_year": "FY2027", "official_url": "https://comptroller.war.gov/Portals/45/Documents/defbudget/FY2027/FY2027_c1.pdf", "publisher": "Office of the Under Secretary of War (Comptroller)", "document_date_printed": "April 2026", "pdf_physical_page_count": 450, "local_snapshot": "/private/tmp/fy2027_c1.pdf", "local_text_extract": "/private/tmp/c1_p75_149.txt", "identity_check": "The PDF title/headers identify FY2027 Military Construction and Family Housing C-1. PDF metadata records 450 pages; this batch covers physical PDF pages 75–149 (zero-based 75–149), sequentially." }, "read_scope": { "status": "full_for_bounded_range", "physical_pdf_pages_read": "75–149 inclusive (75 pages; zero-based 75–149)", "internal_document_pages_encountered": "67–141", "coverage_by_material": [ {"physical_pages": "75–80", "internal_pages": "67–72", "material": "FY2027 summary by state/country and Army, Navy, Air Force, and Defense component summaries"}, {"physical_pages": "81–135", "internal_pages": "73–127", "material": "FY2025 Military Construction / Family Housing Total Obligation Authority as Enacted: project and category tables, domestic, overseas, and unspecified locations"}, {"physical_pages": "136–149", "internal_pages": "128–141", "material": "beginning of FY2026 Military Construction Total Obligation Authority as Enacted: domestic project tables through Hawaii"} ], "remaining_unread_physical_pages": "150–449", "not_read": "Underlying project DD Forms, cost estimates, engineering assessments, environmental documents, service installation plans, FY2025/FY2026 enactment statutes, FY2026 spend-plan materials, and any source documents outside this C-1 range." }, "accounting_and_legal_state": { "unit": "Dollars in thousands unless noted", "FY2027_request_material": [ { "locator": "physical p75 / internal p67", "label": "FY2027 Military Construction and Family Housing summary by state and country", "construction_total": {"authorization": 38183658, "authorization_for_appropriations": 31338115, "appropriation_amount": 31250315, "TOA": 31250315}, "interpretation_limit": "This is a C-1 request/authorization presentation, not proof that Congress appropriated or enacted FY2027 amounts. The exhibit itself prints distinct authorization, authorization-for-appropriations, appropriation, and TOA columns." }, { "locators": "physical pp76–80 / internal pp68–72", "label": "FY2027 component/state-country summaries", "examples": [ {"component": "Army", "construction_total": {"authorization": 2337212, "authorization_for_appropriations": 4222257, "appropriation_amount": 4222257, "TOA": 4222257}}, {"component": "Navy", "construction_total": {"authorization": 19323945, "authorization_for_appropriations": 9980043, "appropriation_amount": 9980043, "TOA": 9980043}}, {"component": "Air Force", "construction_total": {"authorization": 10018135, "authorization_for_appropriations": 12648299, "appropriation_amount": 12560499, "TOA": 12560499}}, {"component": "Defense", "construction_total": {"authorization": 6504366, "authorization_for_appropriations": 4487516, "appropriation_amount": 4487516, "TOA": 4487516}} ], "interpretation_limit": "These are allocation/authorization summaries. Country, State, component, and project names are not independently cited evidence studies or cost models." } ], "historical_comparators": [ { "physical_pages": "81–135", "label": "FY2025 Military Construction Total Obligation Authority as Enacted", "legal_state": "historical enacted table, not an FY2027 request", "key_totals": [ {"locator": "physical p112 / internal p104", "category": "inside United States", "authorization": 12101264, "authorization_for_appropriations": 7823134, "appropriation_amount": 9107406, "TOA": 9107406}, {"locator": "physical p123 / internal p115", "category": "outside United States", "authorization": 5816907, "authorization_for_appropriations": 3355951, "appropriation_amount": 3677770, "TOA": 3677770}, {"locator": "physical p132 / internal p124", "category": "unspecified locations", "authorization": 2761097, "authorization_for_appropriations": 7447239, "appropriation_amount": 6893833, "TOA": 6897833} ], "interpretation_limit": "The tables identify project and line-item amounts under an enacted FY2025 header. They do not supply outcomes, a performance evaluation, or a published project-cost methodology." }, { "physical_pages": "136–149", "label": "FY2026 Military Construction Total Obligation Authority as Enacted", "legal_state": "historical enacted table, not an FY2027 request", "scope_limit": "Only the start of the domestic project listing (Alabama through beginning Hawaii) is in this batch; later FY2026 tables remain unread." } ] }, "named_input_or_authority_census": { "separately_named_source_objects": [], "result": "No named statute, regulation, strategy, report, study, audit, model, engineering estimate, environmental record, or published decision memorandum appears in the physical pp75–149 text as a source for the displayed FY2027 request or project amounts.", "explicit_non_sources": [ {"labels": "Project names, installation names, State/country/component headings, and construction categories", "role": "allocation/authorization or enacted line-item tables; not studies or source documents"}, {"labels": "PDI, CTC, EDI, GBSD, B-21, F-35, Sentinel, Columbia Sub, OTH Radar, BRAC, NATO Security Investment Program, and Military Housing Privatization Initiative labels", "role": "program/project/category labels in tables; no separately identified underlying strategy, requirement document, or model was supplied in this read range"}, {"labels": "MIT-LL/Engineering and Prototype Facility", "locator": "physical p95 / internal p87", "role": "facility project label, not a cited MIT Lincoln Laboratory study or estimate"}, {"labels": "Reconciliation", "locator": "FY2026 project names beginning physical p136", "role": "table/project descriptor; no underlying reconciliation analysis is identified in the range"} ] }, "material_observations": [ {"locator": "physical pp81–135", "observation": "The FY2025 enacted tables show authorization, authorization-for-appropriations, appropriation amount, and TOA separately, including differences on some projects and category totals. Do not collapse them into a single spending measure."}, {"locator": "physical pp124–132", "observation": "FY2025 unspecified-location enacted tables include categories such as minor construction, design, energy resilience/conservation investment, NATO Security Investment Program, direct-loan subsidy reestimate/interest, operation, leasing, maintenance, and housing privatization support. Their names do not themselves establish an evidence base or a FY2027 policy rationale."}, {"locator": "physical pp133–135", "observation": "The FY2025 family-housing tables separate new/improvement construction and recurring categories such as utilities, furnishings, management, services, leasing, maintenance, and privatization support; they remain enacted historical accounting tables."} ], "upstream_queue": [ {"item": "FY2027 individual project justification and DD Form material for the FY2027 project lists", "why": "Necessary to test condition, scope, cost, alternatives, and estimated benefit; not included in this C-1 table range.", "status": "unread"}, {"item": "FY2025 and FY2026 enacted MILCON/FH legal texts and related spend-plan documents", "why": "Needed to independently verify the exhibit's enacted legal-state labels and any reconciliation entries.", "status": "unread"}, {"item": "Underlying requirements, engineering estimates, installation plans, environmental records, and program decision documents for named projects", "why": "No such objects are identified or read here; project labels are insufficient evidence of method or outcome.", "status": "unread"} ] }