Skip to content
Browse the whole research Library · Start page for AI agents ·

Wave 1A — Named-status legal instruments

.md · 3 sections · 26146 characters

Source, owner, and dates

workbench: Research Packages/Federal Government Entity Library Harvest 2026-08-22/waves/WAVE_1A_LEGAL.md

Canonical source SHA-256: ae990bbeff79b086e751abaeff2a194c7c925af0f3926c4f94ad341c42e04c2e

Served copy SHA-256: ae990bbeff79b086e751abaeff2a194c7c925af0f3926c4f94ad341c42e04c2e

Owner evidence cutoffs: {}

These are package-level cutoffs, not a claim that this source was rechecked on those dates. Use its own publication and capture dates.

Owners: federal-government-entity-library-harvest-2026-08-22

Opening section

Section 1 of 3

# Wave 1A — legal / regulatory / instruments

Named-status 33 only. Window B: January 20, 2025 through this sitting (2026-08-22). Federal Register, Public Inspection, organic-act hooks, executive orders, court orders, delegations, GENIUS/SCRC instruments. Schedule Policy/Career only if the instrument names one of these 33. DOJ National Fraud Enforcement Division is parked and is not in this 33; ignored unless it named one of them (it did not, on objects reached).

This sitting does not rebuild the EO ledger or Federal Group Control maps. Those maps stay paused after Wave 6. Objects already on those shelves are tagged existing_coverage and harvested here only as the status-bearing instrument for the named person. A keeper is not a vault landing. A press release is not a repeal. Four entity clocks never collapse: statutory existence · personnel · function transfer · appropriations.

Rows: generated/WAVE_1A_KEEPERS.csv.

## Method

Looked at FR API (publication ≥ 2025-01-20; agency slugs and presidential documents), current Public Inspection, White House / govinfo EO texts already in the vault EO files, slip opinions and RECAP PDFs for the restoration and emptying cases, GENIUS primary objects already in the Aug 17 implementation-gap package, and the publishing-parent locators from Slice C. News used only as a locator. Agency newsrooms not walked.

Keep bar for this lane: the object changes legal existence, control, personnel leash, function transfer, or the appropriations clock for one of the 33. Skip: routine notices, CPI/threshold reprints, comment-period housekeeping, Title VI recissions that do not move the person, safety zones, PRA extensions.

## Ranked keepers (clocks uncollapsed)

Rank is vault-interest, not chronology. Clocks below are object clocks. Entity clocks sit in the entity sections that follow.

Rank Object Why it is load-bearing Clocks that must not collapse
1 EO 14242 + McMahon stay + ED–Treasury IAA + P.L. 119-75 + EDGAR NPRM Education emptying without repeal Charter live. RIF cut, then PI, then stay of PI, then assented vacation of PI (docket metadata). IAA collects; does not take title. Congress still writes the check to the Department. EDGAR is a proposal.
2 EO 14169 + State Jan 26 / Mar 28 notices + P.L. 119-28 ¶15 + remnant site USAID operating death without charter death § 6563 still names the person. Pause / notify / cease is Clock 3. $125 million OE unobligated cut is Clock 4. Remnant homepage is not a deed.
3 NTEU v. Vought (live) CFPB contraction vs continuing Bureau No 2025–26 organic-act repeal. Preliminary restraints still govern parts of the planned contraction. En banc live; limited remand 2026-06-19; appeal No. 26-5220 open. Bureau still issues rules.
4 HHS Mar 27 Communiqué + AHA CJs + P.L. 119-75 headings + Kennedy PI AHA is a request SAMHSA/HRSA still statutory / appropriated. AHA heading not in P.L. 119-75. PI is not a merits repeal and does not name SAMHSA or AHA.
5 EO 14238 + D.R.I. PI + 1st Cir. stay denial FMCS / IMLS restored; MBDA contested EO ordered statutory minimum, not repeal. May 13 PI bars implementing § 2 of the EO as to the three. 1st Cir. left that relief in place. IMLS grants reinstated Dec 3. MBDA later permanent-injunction PDF not retrieved this sitting.
6 DHS walk-back + RFK Human Rights v. DHS moot PI OCRCL “restored” is a walk-back, not a rebuilt office Statutory office still named. July 11 2025 PI denied as moot after DHS said it would not abolish. Reconsideration denied Mar 27 2026. Banner asserts statutory functions. Headcount remains hollowed.
7 EO 14158 § 3(b) sunset vs doge.gov still serving Temp org died; USDS/site did not Temporary Organization terminates 2026-07-04. Same section: termination “shall not be interpreted to imply the termination” of other authority. Wave 0 found the .gov still live 2026-08-22. July 10 audit’s “site went dark” is a provenance correction.
8 P.L. 119-27 + Treasury ANPRM + state-similarity NPRM + § 3 NPRM SCRC exists on paper; pathway is unbuilt Enactment 2025-07-18. Implementation-reg deadline 2026-07-18 passed with no qualifying final set. State certification is one year after effective date, not enactment. No SCRC form, approval, or public list located.
9 EO 14217 + P.L. 119-28 ¶¶17–19 IAF / USADF / USIP starved, not repealed Reduction to statutory minimum, then enacted unobligated-balance cuts ($27m / $22m / $15m). Organic acts unamended. USIP rebrand is a same-URL replacement, not a charter.
10 EO 14233 / 14255 / 14196 / 14395 / 14178 New vehicles SBR/DASP = Treasury custodial offices, not statutes. Accelerator = Commerce office (30-day stand-up). SWF = 90-day plan. Task Force = EOP body (VP chairs). PWG = EO working group; 180-day report is not a charter.

## Entity clocks (the 33)

Status flags are Slice C / chart intent. They are not Clock 1.

### Education (fg-105) — dissolving in intent, live as a person

Clock State at sitting Controlling objects
1 statutory existence Live. 20 U.S.C. § 3411 still names the Department. § 3473(a)(2) bars the Secretary from abolishing chapter-created entities. Organic act; no 2025–26 repeal retrieved.
2 personnel Cut, then contested, then the bar on the RIF was stayed and later vacated. ED RIF announcement 2025-03-11. D. Mass. PI 2025-05-22 (New York v. McMahon, 1:25-cv-10601) barred the dismantling/RIF. First Circuit denied stay 2025-06-04. SCOTUS stay of that PI 2025-07-14, No. 24A1203 (unsigned majority; Sotomayor/Kagan/Jackson dissent). Docket metadata: assented motion to vacate the PI granted 2025-10-01. Official 2026 headcount after that: not retrieved.
3 function transfer Work moved by IAA. Authority did not. ED–Treasury IAA 2026-03-19: Economy Act / 31 U.S.C. § 3711(g). Attachment 1: referrals “do not transfer ownership of the debt from Education to Treasury.” Phase 3 is a review. EDGAR NPRM (FR Doc. 2026-17239) proposes grant-notice routing and continuation/termination changes — proposal only. Accreditation NPRM (2026-17001) is the Title IV recognition gate — proposal only.
4 appropriations Still pointed at the Department. P.L. 119-75 (2026-02-03) still appropriates Student Financial Assistance, Student Aid Administration, and Program Administration “For carrying out … the Department of Education Organization Act,” and orders staffing “necessary to fulfill its statutory responsibilities.”

Do not collapse: an EO that says “facilitate … permitted by law” into repeal; a stay into a merits holding; an IAA into a deed; EDGAR comments-due into a final termination power. Pulse Aug 21 already had EDGAR at Public Inspection (filed 2026-08-21 08:45 EDT, scheduled publication 2026-08-24, comments 30 days after publication). This sitting does not invent a final rule.

### USAID remnant (fg-078) / State (fg-074)

Clock State at sitting Controlling objects
1 Live. 22 U.S.C. § 6563 still names USAID as a 5 U.S.C. § 104 independent establishment unless abolished under the 1998 § 6601 plan. No 2025–26 statute, and no new § 6601 plan in the Federal Register, retrieved.
2 Hollowed. Remnant homepage is the Feb 23 2025 administrative-leave / RIF notice. Official 2026 headcount NR. USAID OIG remains a distinct live publisher (not this lane).
3 Operating death, claimed by State, not enacted by Congress. EO 14169 signed 2025-01-20, published 2025-01-30 (90 FR 8619): 90-day pause on new obligations/disbursements; continue / modify / cease after review; Secretary may waive. State Jan 26 2025: pause State/USAID foreign assistance. State Mar 28 2025: notified Congress of intent to realign some functions to State by July 1 2025 and discontinue the rest. July 2 2025 briefing snippet (full HTML NR at the FGC cutoff). Census Bureau final rule 2026-01242 (pub 2026-01-23) strips USAID-collaboration text from Census training regs — residue of Clock 3, not a USAID repeal. State Jan 27 2026 foreign-assistance final rules (2026-01516 / 01517 / 01519) are State as operator of remaining assistance policy, not a deed to § 6563.
4 Starved, not repealed. P.L. 119-28 ¶15 (enacted 2025-07-24): $125,000,000 of unobligated USAID Operating Expenses from P.L. 119-4 rescinded. Heading remains. ICA proposal of Aug 28 2025 (FR 2025-16851, 90 FR 42614, pub 2025-09-03) is a later proposal, not this enacted line.

usaid.gov still does not redirect to state.gov (Wave 0). A remnant site is Clock 2/3 evidence. It is not Clock 1.

### CFPB (fg-197) — dissolving in intent, surviving in fact

No 2025–26 EO or statute abolishing the Bureau was located. CFSA (2024) already upheld the Fed-assessment funding channel (JM-03; pre-window; do not re-date).

Clock State at sitting Controlling objects
1 Live. 12 U.S.C. § 5491 still names the Bureau. No repeal retrieved.
2 Acting Director Vought; contraction planned; court restraints. NTEU v. Vought, D.D.C. 1:25-cv-00381; D.C. Cir. 25-5091 and 26-5220. Preliminary restraints still govern parts of the planned contraction. En banc appeal live. Limited remand 2026-06-19 while the circuit retained jurisdiction. Appeal 26-5220 open.
3 Functions narrowed by the Bureau’s own 2025–26 recissions; not transferred to another statutory person. Supervisory-designation procedures recission (2025-18622, pub 2025-09-25). Rulemaking-procedure recission (2025-11241, pub 2025-06-18). Nonbank-registry recission (2025-19689, pub 2025-10-29). These change how the Bureau acts. They are not a charter amendment. ECOA/Reg B/CPI reprints skipped.
4 Funding channel still the Fed assessment unless a later Act or merits holding says otherwise. NTEU tests operations against that channel. Do not collapse JM-03 (2024) into a 2025–26 reaffirmation.

Pulse Aug 20 recorded CFPB complaint-narrative publication ceased as an ops object (Wave 1B), not a legal dissolution. This lane does not steal that row.

### AHA (fg-093) / SAMHSA (fg-094) / HRSA (fg-095) / HHS (fg-087)

Clock HHS SAMHSA HRSA AHA
1 Live (Reorg. Plan No. 1 of 1953; 20 U.S.C. § 3508; 42 U.S.C. § 3501) Live (42 U.S.C. § 290aa) Still the enacted heading; single “there is established” sentence like § 290aa NR Not established. No organic act retrieved. 5 U.S.C. § 905(b) reorganization-plan path died Dec 31 1984.
2 Mar 27 Communiqué claimed 82k→62k Not on the Kennedy named list Not on that list as HRSA; NIOSH (Communiqué said fold into AHA) is on the CDC list Not on the list
3 Announced 28→15 divisions Fold-in announced, not enacted Fold-in announced, not enacted Communiqué + two CJs with two different absorption lists
4 P.L. 119-75 still funds the Department Heading still in P.L. 119-75 Heading still in P.L. 119-75 Words “Administration for a Healthy America” do not appear in P.L. 119-75. FY2026 and FY2027 CJs are requests.

New York v. Kennedy, D.R.I. 1:25-cv-00196: PI July 1 2025; revised list Aug 12 2025; First Circuit stay denied Sept 17 2025 (New York v. Kennedy, 155 F.4th 67) — stay denial, not merits. Motion to dismiss denied Apr 7 2026. No merits judgment retrieved. MAHA Commission (EO 14212) is a different object; not harvested as AHA.

Restorations — three different legal machines

Section 2 of 3

### Restorations — three different legal machines

Do not write “the courts restored three agencies” as one act.

Person Reduction instrument Restoration instrument What actually returned
FMCS (fg-212) EO 14238 § 2(a)(i), signed 2025-03-14, pub 2025-03-20 (90 FR 13043). 7-day OMB report. Rhode Island v. Trump, D.R.I. 1:25-cv-00128. Memo/order May 6 2025; PI May 13 2025 (ECF 60): enjoins implementing EO 14238 § 2 as to IMLS, MBDA, and FMCS; reverse prior implementing actions; “shall not take any further actions to eliminate” the three. First Circuit No. 25-01477, Sept 11 2025, denied stay (govinfo PDF). WAVE_1D records Dec 30 2025 vacation of mediator layoffs — SDNY PDF not retrieved this sitting. Statutory mediation person survived. Wave 0: fmcs.gov is theirs again. Personnel census after restoration NR.
IMLS (fg-232) EO 14238 § 2(a)(iv). Same D.R.I. PI + 1st Cir. stay denial. Agency instrument: IMLS “Statement of Agency’s Reinstatement of Terminated IMLS Grants,” 2025-12-03, reinstates all federal grants and supersedes prior termination notices. Entity-audit / WAVE_1D: Apr 2026 settlement, government withdrew appeal, RIF reversed — settlement PDF not retrieved this sitting. Grantmaker continued; 2026 awards on-site (Wave 0). Jan 2026 lapse plan (38 employees) is a shutdown plan, not a dissolution.
OCRCL (fg-103) Not in EO 14238. DHS RIF ~Mar 21 2025 is the personnel act (FR org rule not located). Robert F. Kennedy Human Rights v. DHS, D.D.C. 1:25-cv-01270 (ACR). PI denied as moot July 11 2025 after DHS said it would not abolish CRCL / the two ombudsmen. Reconsideration denied Mar 27 2026 (ECF 78). DHS component page banner: “continues to exist and will perform its statutorily required functions.” Clock 1 asserted by DHS and not enjoined as abolished. Clock 2 remains hollowed (litigation declarations of a handful of staff). This is a walk-back, not a rebuilt office. Covered by DHS.
MBDA (fg-129) EO 14238 § 2(a)(vii). Same May 13 PI. WAVE_1D / entity audit: November 2025 permanent injunction, appeal pending 2026 — permanent-injunction PDF not retrieved this sitting. P.L. 119-75 restricted transfer of MBDA funds (FGC Education/Impoundment bind). Person survived; contested, not restored in the FMCS/IMLS sense. mbda.gov still live (Wave 0).

### DOGE (fg-054) — sunset vs live site

EO 14158, signed 2025-01-20, published 2025-01-29 (90 FR 8441).

Clock State
1 USDS-in-EOP rename. Not a Cabinet department. Temp org is a 3161 time-limited body inside USDS.
2 USDS Administrator reports to WH Chief of Staff. Agency Team-Lead census NR.
3 Software-modernization + records access, “to the maximum extent consistent with law.”
4 Subject to appropriations. No standalone DOGE appropriation retrieved.
Temp-org sunset 2026-07-04 by the order’s own terms.
Observed implementation Wave 0 (2026-08-22): https://doge.gov still serving as an official .gov (savings wall + API). FOIA is EOP/USDS, not a doge.gov reading room.

July 10 entity-chart audit wrote “self-terminated … site went dark same day.” That is false as to the site on the Wave 0 fetch. Temp-org sunset ≠ USDS repeal ≠ hostname death. Do not collapse those three.

Related DOGE workforce/cost EOs (14210, 14222) and Treasury-access cases (JM-19, JM-20) stay on their existing shelves. Not rebuilt here.

### SCRC / GENIUS (fg-391) — committee exists; gates unopened

P.L. 119-27, GENIUS Act, enacted 2025-07-18. SCRC is § 2(27): Treasury Secretary chairs; Fed Chair (or Vice Chair for Supervision if delegated) and FDIC Chair sit. State-qualified issuers (≤ $10 billion outstanding) need a substantially similar state regime and SCRC approval that it meets or exceeds § 4(a) (§ 4(c)). SCRC must issue the non-financial-company interpretive rule (§ 4(a)(12)(D)).

Object Clock State at sitting
Statute Enactment 2025-07-18 Live. Creates SCRC. Does not approve an issuer.
General implementation regulations Due one year after enactment: 2026-07-18 Deadline passed. No complete qualifying final set located (GENIUS gap audit 2026-08-17, re-checked FR this sitting).
Treasury ANPRM 2025-18226 PI 2025-09-18 08:45; pub 2025-09-19 (90 FR 45159); comments 2025-10-20 Questions, including SCRC state-similarity principles. Not a final SCRC procedure.
State-similarity NPRM 2026-06489 Pub 2026-04-03 (91 FR 16844); comments 2026-06-02 Closed. No final rule located. CSBS / seven-senator later-certification dispute is comment, not a determination.
§ 3 issuance/offer/sale NPRM 2026-16796 Pub 2026-08-18 (91 FR 53368); comments 2026-10-19 (Regulations.gov comment_end 2026-10-20) Pulse Aug 20 already owns this as the published § 3 NPRM. Harvest keeps it because it is the SCRC/Treasury perimeter for the named committee. 87-question count is Pulse’s; do not re-count here.
Offer/sale prohibition § 3(b) 2028-07-18 (three years after enactment) Future operating clock.
State certification One year after the Act’s effective date, not enactment. If no acceleration and the 2027-01-18 backstop controls, conditional initial date 2028-01-18 Unopened. No SCRC form, process, submitted certification, approval, or public list located through this sitting.
Non-financial public-company rule SCRC interpretive rule required NR
Foreign comparability § 18 Treasury determination NR

No scrc.gov (Wave 0 not_web). Publishing parent is Treasury.

### New / proposed vehicles (no own site except as noted)

Person Instrument What it is What it is not
Task Force to Eliminate Fraud (fg-055) EO 14395, signed 2026-03-16, pub 2026-03-19 (91 FR 13485) EOP task force. VP chairs; FTC Chair vice-chairs; Treasury bears FR cost (Slice C). Not Treasury. Not the parked DOJ National Fraud Enforcement Division.
Strategic Bitcoin Reserve (fg-071) EO 14233, signed 2025-03-06, pub 2025-03-11 (90 FR 11789) Treasury office / custodial accounts for finally forfeited BTC. 30-day agency-authority reports; 60-day legal/investment evaluation. BTC “shall not be sold.” Not a statute. Not a live fund site. Budget-neutral additional acquisition is a direction, not a purchase.
US Digital Asset Stockpile (fg-072) Same EO 14233 § 3(b) Separate Treasury custodial account for non-BTC forfeited digital assets. Additional acquisition other than forfeiture/penalty needs later executive or legislative action. Not SBR. Not a live site.
US Investment Accelerator (fg-130) EO 14255, signed 2025-03-31, pub 2025-04-03 (90 FR 14701) Commerce office within 30 days. Heads CHIPS Program Office. Executive Director to be named by the Secretary. Not a fund. Not chips.gov as the Accelerator root (Wave 0). Silberstein ED announcement 2026-06-29 is personnel (Wave 1B unless a PAS instrument appears).
US Sovereign Wealth Fund (fg-303) EO 14196, signed 2025-02-03, pub 2025-02-10 (90 FR 9181) 90-day plan (Treasury + Commerce). Not an operating fund. Entity-audit May 2026 “blueprint rejected” — rejection instrument not retrieved this sitting.
PWG Digital Asset Markets (fg-392) EO 14178, signed 2025-01-23, pub 2025-01-31 (90 FR 8647) Working group; 180-day report clock from signing ≈ 2025-07-22. Report PDF exists on whitehouse.gov. Report is not a charter and not an SCRC approval.
External Revenue Service (fg-073) None located Proposed name. Senate locators are not law. Do not invent a CBP/Treasury host.

### Reduction class still contested (not restored)

EO 14217 (signed 2025-02-19, pub 2025-02-25, 90 FR 10577): Presidio Trust (not in this 33); IAF, USADF, USIP. 14-day OMB report. Also killed FEBs/PMF path and named advisory committees, including CFPB Academic Research Council and Credit Union Advisory Council (personnel/advisory leash, not Bureau repeal).

EO 14238 remaining names: USAGM, Wilson Center, USICH, CDFI Fund (plus FMCS/IMLS/MBDA above).

P.L. 119-28 (2025-07-24) Clock 4 only:

Account Amount
15 USAID Operating Expenses (from P.L. 119-4) $125,000,000
17 Inter-American Foundation $27,000,000
18 U.S. African Development Foundation $22,000,000
19 U.S. Institute of Peace $15,000,000

Account cut ≠ organic-act repeal. USIP usip.org rebrand to “Donald J. Trump Institute of Peace” is Wave 0 same-URL replacement; no charter amendment retrieved. USAGM/USIP appellate questions remain paused behind Slaughter (JM-02) per the July 10 audit — this sitting did not retrieve a 2026 merits disposition for either. Wilson Center: EO 14238 target; Wave 0 live and running 2027–28 fellowships = restructured, not dead. CDFI Fund and USICH: ordered to statutory minimum; no closure receipt and no restoration PI retrieved. AmeriCorps: dissolving-status, site live, Title VI NPRM 2026-14906 skipped as housekeeping; controlling court object not retrieved (entity-audit watch: joint status report was due 2026-07-31).

### Dissolved historical (fg-387 SIGPR, fg-388 SIGTARP, fg-389 OTS)

No 2025–26 instrument creating, repealing, or pretending to revive these persons was located in FR. Wave 0 already recorded the web removals (SIGPR redirect to Treasury fraud form; SIGTARP NXDOMAIN; OTS OCC archive). NARA schedule DAA-0056-2023-0001 is a records clock, not a 2025–26 charter act. Skip as legal-existence objects for this window.

## Skip (one line, no PDF)

## Empty hunts / access

Hunt Result
FR org rule abolishing OCRCL Not located. Personnel act was a DHS RIF; restoration is a walk-back plus a moot PI.
SCRC form / public list / approval order Not located.
ERS establishment statute, EO, or org rule Not located.
SWF “blueprint rejected” primary Not located this sitting. Entity-audit claim stands as a locator only.
AmeriCorps controlling PI/settlement PDF Not located this sitting.
USIP / USAGM 2026 merits disposition Not located. Still paused locators behind Slaughter.
MBDA Nov 2025 permanent injunction PDF; IMLS Apr 2026 settlement PDF; FMCS Dec 30 2025 layoff-vacation PDF Not retrieved this sitting. Keep the D.R.I. PI + 1st Cir. opinion, which were.
New § 6601 USAID abolition plan in FR Not located.
AHA heading in an enacted appropriation Not located in P.L. 119-75. FY2027 enacted act isolated as an AHA heading: NR.

Claim limits

Section 3 of 3

## Claim limits

## Sources (primary, reached this sitting)

No chart mutation. No vault landing. No EO-ledger rebuild.