.json · 1 sections · 9358 characters
workbench: _Working/federal-budget-2026-2027/goal/terra_process/va/batch4/VA_FY2027_FUTURE_OF_WORK_CONSOLIDATION_STUDY_DISCOVERY_RECEIPT.json
Canonical source SHA-256: d6ec5e04c34e2457dd3f96dfdc0801c36447f1c943e58e06948538cea428084a
Served copy SHA-256: d6ec5e04c34e2457dd3f96dfdc0801c36447f1c943e58e06948538cea428084a
Owner evidence cutoffs: {"federal-budget-fy2026-fy2027": "2026-09-11T19:55:13-04:00"}
These are package-level cutoffs, not a claim that this source was rechecked on those dates. Use its own publication and capture dates.
Owners: federal-budget-fy2026-fy2027
Section 1 of 1
{ "artifact_type": "bounded_original_study_discovery_and_read_receipt", "created": "2026-09-11", "question": "Identify the VA Central Office (VACO) Future of Work Consolidation Study described in FY2027 Volume 4; recover and assess any public original report, methodology, outputs, and demonstrated relation to FY2027 footprint targets.", "cj_primary": { "title": "Department of Veterans Affairs FY 2027 Budget Submission, Volume 4 of 5", "url": "https://department.va.gov/wp-content/uploads/2026/04/Volume-4.pdf", "local_pdf": "/tmp/va_fy27_volume4.pdf", "examined_pages": [ {"pdf_physical_page": 292, "printed_page": "6.2-68", "scope": "SCIP linkage to M-20-03, M-21-25, M-22-14, and M-23-15."}, {"pdf_physical_page": 296, "printed_page": "6.2-72", "scope": "VBA/OIT workplace and space-planning discussion."}, {"pdf_physical_page": 297, "printed_page": "6.2-73", "scope": "OIT facility reduction examples."}, {"pdf_physical_page": 298, "printed_page": "6.2-74", "scope": "OA/HRA Future of Work Consolidation Study passage."}, {"pdf_physical_page": 359, "printed_page": "6.6-1, headed 2026 Congressional Submission within this PDF", "scope": "Related Staff Offices narrative, retained as a separate version/text instance."} ], "exact_cj_text_at_issue": "In 2022, Human Resources and Administration (HRA) commissioned a Future of Work Consolidation Study for the VACO campus in response to OMB Memorandum M-22-14, Agency Wide Capital Planning to Support the Future of Work, integrating the preliminary results into the SCIP process. The study temporarily paused to implement OMB Memorandum M-23-15 in 2023. However, in 2024 a data call was reissued, and the study completed to account for VA's hybrid policy requiring VACO personnel to work from the office more frequently.", "nearby_fy2027_context": "The same page says VA's late-December 2024 space-planning process was modified in January 2025 for full return to office; HRA will need to re-block and re-stack VACO buildings after ARRP efforts, and OA anticipates additional Minor Construction funding in coming years. It supplies no study publication, result, target, baseline, calculation, project list, or FY2027 dollar amount." }, "study_identity": { "reported_title": "Future of Work Consolidation Study", "reported_sponsor": "VA Human Resources and Administration (HRA); FY2027 page is within Office of Administration discussion.", "reported_scope": "VACO campus, mid- and longer-term space requirements/portfolio strategy.", "reported_origin": "Commissioned in 2022 in response to OMB M-22-14, according to the CJ.", "public_identity_recovery": "not_recovered", "not_publicly_identified_in_reviewed_material": ["author or contractor", "report number", "publication date", "procurement or task-order identifier", "data-call instrument or returned dataset", "methodology", "assumptions", "findings", "recommendations", "Concept Plans or Design Intent Drawings"], "limit": "A named agency statement that a study was completed does not establish that its underlying report, data, or methodology is publicly available or reviewed. This search does not establish nonexistence." }, "official_public_search": { "scope": "Bounded searches of public VA, VA OIG, GAO, and USAspending domains for the exact title, VACO phrase, Concept Plans/Design Intent Drawings, and related SCIP language; no access-control bypass or nonofficial substitute used.", "results": [ { "object": "FY2024 VA Volume 4", "url": "https://www.va.gov/budget/docs/summary/fy2024-va-budget-volume-iv-construction-long-range-capital-plan-and-appendix.pdf", "status": "official_CJ_text_located_via_public_search; underlying_report_not_located", "reported_relation": "The FY2024 CJ says the 2022 study's preliminary results were incorporated into SCIP and says completion was expected in 2023 with a plan to reduce Washington-area locations from seven to four. This is a historical agency budget narrative, not the study or proof that the planned reduction occurred." }, { "object": "FY2025 VA Volume 4", "url": "https://www.va.gov/opa/docs/remediation-required/management/fy2025-va-budget-volume-iv.pdf", "status": "official_CJ_text_located_via_public_search; underlying_report_not_located", "reported_relation": "It says the study was completed in 2023 but needed an update in 2024 for more frequent in-office work. This differs from the FY2027 timeline and supplies no report or methods." }, { "object": "FY2026 VA Volume 4", "url": "https://department.va.gov/wp-content/uploads/2025/07/FY26-Volume-4-Construction-and-Long-Range-Capital-Plan.pdf", "status": "official_CJ_text_located_via_public_search; underlying_report_not_located", "reported_relation": "It says the study was completed in 2024 and that Concept Plans and Design Intent Drawings were being implemented for Phase 1 organizations, then says the effort needed adjustment in early 2025. These are agency implementation descriptions; neither the plans/drawings nor the study were recovered." }, { "object": "GAO and VA OIG public report searches", "status": "no_exact_study_or_study_audit_recovered_in_bounded_search", "reported_relation": "Searches found general real-property and workplace material but no GAO or VA OIG publication that identifies, reproduces, validates, or audits this VACO study. General reports were not substituted for its methodology or outputs." }, { "object": "USAspending public-domain search", "status": "no_identifiable_award_or_contract_record_recovered_in_bounded_search", "reported_relation": "No contractor/task order can be inferred from the CJ's word 'commissioned.'" } ] }, "related_official_guidance": [ { "title": "OMB Memorandum M-23-15, Measuring, Monitoring, and Improving Organizational Health and Organizational Performance in the Context of Evolving Agency Work Environments", "url": "https://www.whitehouse.gov/wp-content/uploads/2023/04/M-23-15.pdf", "date": "2023-04-13", "role": "Policy direction cited by the CJ. It directs agencies to update Work Environment Plans and establish routines to assess and optimize work-environment changes; it does not publish VA's VACO study, its data call, or a VA footprint result.", "read_boundary": "Official public search text reviewed; not used as a substitute for unavailable study methodology." }, { "title": "OMB Memorandum M-22-14, Agency-Wide Capital Planning to Support the Future of Work", "url": null, "role": "CJ-stated policy trigger for commissioning the study.", "read_boundary": "Exact original memorandum was not recovered in this bounded batch; no claim is made about its detailed requirements beyond the CJ's title and stated relationship." } ], "timeline_and_version_boundary": [ {"period": "FY2024 CJ", "statement": "Study commissioned in 2022; preliminary results incorporated in SCIP; plan expected in 2023 to reduce seven Washington-area locations to four.", "meaning": "Forecast/agency plan, not an achieved metric or study output recovered here."}, {"period": "FY2025 CJ", "statement": "Study completed in 2023 but required a 2024 update for increased in-office work.", "meaning": "Agency narrative; it conflicts with a simple one-time completion story."}, {"period": "FY2026 CJ", "statement": "Study completed in 2024; Phase 1 Concept Plans and DIDs being implemented; effort adjusted in early 2025.", "meaning": "Implementation statement, without public plans/drawings or output evidence."}, {"period": "FY2027 CJ printed 6.2-74", "statement": "Study paused in 2023, data call reissued, and study completed in 2024 to account for more frequent office work.", "meaning": "Current agency description of process history; no numeric target or result."} ], "fy2027_reliance_and_target_conclusion": { "demonstrated_reliance": "The FY2027 CJ explicitly says preliminary results were integrated into SCIP. This establishes an asserted process connection only.", "not_demonstrated": ["a specific FY2027 footprint target derived from the study", "a VACO location or square-footage target for FY2027", "a calculation linking study data to a specific Minor Construction request", "implementation of a completed study recommendation", "whether the FY2024 seven-to-four plan occurred"], "proposal_vs_execution": "The CJ says OA anticipates future Minor Construction need and describes re-blocking/re-stacking after ARRP. It neither appropriates funds nor proves completion, savings, or compliance with a footprint target." }, "full_text_actually_examined": ["FY2027 Volume 4 physical pages 292, 296-298, and 359 from /tmp/va_fy27_volume4.pdf."], "limits": ["No public original study/report or its appendices/data call was recovered in the bounded official-source search.", "Prior-year CJ passages are evidence of what VA represented in those submissions, not independent confirmation of timeline or results.", "This is not a full VA real-property, SCIP, procurement, FOIA, or ARRP review.", "No canonical or maintained files were edited."] }