.csv · 1 sections · 9697 characters
workbench: Research Packages/Federal Government Full Freshness Sweep 2026-08-22/relevance_retroaudit/wave_3_strict/army_airforce/D_REAUDIT.csv
Canonical source SHA-256: f6824fa63e2d35a520053562b07de5f7852aa0a5ae4814c132893382c25d1aa9
Served copy SHA-256: f6824fa63e2d35a520053562b07de5f7852aa0a5ae4814c132893382c25d1aa9
Owner evidence cutoffs: {"federal-government-full-freshness-sweep-2026-08-22": "2026-08-23"}
These are package-level cutoffs, not a claim that this source was rechecked on those dates. Use its own publication and capture dates.
Owners: federal-government-full-freshness-sweep-2026-08-22
Section 1 of 1
object_id,prior_relevance_class,controlling_relevance_class,canonical_plotlines,canonical_subplots,material_change_types,promotion_action,promotion_unit_id,nonroutine_basis W3-DS-OBJ-381,promotion_review,plotline_support_only,"[""Technology/AI"",""Military""]","[""The AI build-out""]","[""implementation"",""watch"",""provenance""]",update_watch,W3-AA-SUP-001,"C — the FedEx Dataworks collaboration and Google IL5 working structure support the established AI/logistics record, but initial working groups and a future implementation plan are not an instrument, funded deployment, operating network, or measured logistics consequence. Collaboration and flagship language do not clear D." W3-DS-OBJ-380,promotion_review,completeness_census_only,[],[],[],none,W3-AA-CEN-001,"B — Flight School Next is a selection and IDIQ announcement whose first transition task order remained future. Ceiling, possible ordering horizon and training adjacency do not prove an award instrument, obligation, transition, trained-pilot result, or a specific established-plotline change." W3-DS-OBJ-388,promotion_review,promotion_review,"[""Military"",""Technology/AI""]","[""Defense innovation & acquisition reform"",""The AI build-out""]","[""implementation"",""operating"",""chartable_date""]",review_only,W3-AA-PRU-001,"Retain D — not routine: Army Contracting Command placed Army MAX into an operating cloud-pilot state for AI-assisted solicitation work, adding a concrete procurement-control interface to the established defense-acquisition-reform storyline. The event is the operating pilot, not AI adjacency; enterprise deployment, completed procurement, award and validated savings remain unproved." W3-DS-OBJ-382,promotion_review,plotline_support_only,"[""Military"",""Technology/AI""]","[""Defense tech & autonomous weapons"",""Defense innovation & acquisition reform""]","[""funding"",""implementation"",""watch""]",update_watch,W3-AA-SUP-002,"C — the Mobile Tactical Cannon prototype OTA supports the defense-tech and acquisition-reform watch, but it is an ordinary prototype award. Six planned prototypes, an option and stated values do not prove obligation, delivery, successful testing, production decision or fielding." W3-DS-OBJ-026,promotion_review,plotline_support_only,"[""Technology/AI"",""Military""]","[""Defense tech & autonomous weapons""]","[""funding"",""implementation"",""watch""]",update_watch,W3-AA-SUP-003,"C — Xtremis supports the autonomous-threat-detection watch, but this is an ordinary AI/UAS R&D contract. Award-time funds do not prove method completion, test success, delivery, transition, fielding, detection performance or operating use." W3-DS-OBJ-070,promotion_review,completeness_census_only,[],[],[],none,W3-AA-CEN-002,"B — the TOW row is a routine full-rate-production and engineering-services modification. Amount and partial obligation do not prove production quantity, delivery, fielding, readiness or a specific established Observatory transition." W3-DS-OBJ-071,promotion_review,completeness_census_only,[],[],[],none,W3-AA-CEN-003,"B — the University of Alaska nuclear-detection record is an ordinary base IDIQ with work and funding deferred to future orders. Ceiling, UARC status and proliferation language do not establish an order, obligation, research result, detection capability or specific established-plotline change." W3-DS-OBJ-111,promotion_review,plotline_support_only,"[""Energy"",""Military""]","[""Infrastructure — roads, water & the physical grid""]","[""implementation"",""watch"",""falsifier""]",update_watch,W3-AA-SUP-004,"C — WaterCube supports the contested-water/logistics infrastructure watch, but the base IDIQ left work and funding to future orders and was later corrected. The vehicle does not prove an order, obligation, delivered system, potable-water output, sustainment or operating result." W3-DS-OBJ-220,promotion_review,plotline_support_only,"[""Technology/AI"",""Military""]","[""Drones, eVTOL & the airspace"",""Defense tech & autonomous weapons""]","[""funding"",""implementation"",""watch""]",update_watch,W3-AA-SUP-005,"C — Elroy Air supports the autonomous-aircraft and contested-delivery watch, but this is an ordinary SBIR Phase III development contract. Obligation does not prove development completion, test success, production, delivery, fielding or operational payload movement." W3-DS-OBJ-242,promotion_review,completeness_census_only,[],[],[],none,W3-AA-CEN-004,"B — the ground-based strategic-deterrent maintenance facility is a local construction award. Full stated obligation does not prove construction progress, completion, activation, maintenance throughput, deterrent readiness or a project-specific established Observatory transition." W3-DS-OBJ-293,promotion_review,plotline_support_only,"[""Energy"",""Military""]","[""Infrastructure — roads, water & the physical grid""]","[""funding"",""implementation"",""watch""]",update_watch,W3-AA-SUP-006,"C — the Fort Buchanan microgrid award supports the established physical-grid and installation-resilience watch, but ordinary local construction defaults to support. Award and obligation do not prove construction progress, commissioning, islanding, power delivery or resilience effect." W3-DS-OBJ-295,promotion_review,plotline_support_only,"[""Energy"",""Military""]","[""Infrastructure — roads, water & the physical grid""]","[""funding"",""implementation"",""watch""]",update_watch,W3-AA-SUP-007,"C — the White Sands power-generation/microgrid award supports the established physical-grid and installation-resilience watch, but ordinary construction is not a standalone transition. Obligation does not prove build progress, commissioning, generation, islanding or operating resilience." W3-DS-OBJ-018,promotion_review,plotline_support_only,"[""Military"",""Technology/AI""]","[""Defense innovation & acquisition reform"",""Robotics & automation""]","[""falsifier"",""provenance"",""chartable_date""]",update_watch,W3-AA-SUP-008,"C — the next-day correction decisively reverses the carrier's same-campaign claim that the Common Robotic System sustainment IDIQ was awarded, so it must remain provenance for the acquisition/robotics record. The underlying vehicle was ordinary and had no pre-existing project-specific Observatory storyline, so the correction does not clear standalone D." W3-DS-OBJ-442,promotion_review,plotline_support_only,"[""Technology/AI"",""Military""]","[""The AI build-out"",""Defense innovation & acquisition reform""]","[""funding"",""implementation"",""watch""]",update_watch,W3-AA-SUP-009,"C — the ARES production OTA follows prototype testing and supports the Air Force software-modernization watch, but the source exposes no instrument ID, value, obligation or completed rollout. A company-specific production vehicle with deployment next year does not prove consolidation, adoption, legacy retirement or readiness effect." W3-DS-OBJ-443,promotion_review,plotline_support_only,"[""Technology/AI"",""Military""]","[""Defense tech & autonomous weapons""]","[""implementation"",""operating"",""watch""]",update_watch,W3-AA-SUP-010,"C — completion of the first CCA command-and-control enclave evaluation phase supports the autonomous-weapons watch, but prototype evaluation is ordinary R&D progression. No integrator, second cloud phase, production, fielded system, accepted capability or combat result is established." W3-DS-OBJ-445,promotion_review,promotion_review,"[""Covid"",""Military""]","[""Covid revisionism""]","[""authority"",""implementation"",""operating"",""chartable_date""]",review_only,W3-AA-PRU-002,"Retain D — not routine: the Department of the Air Force implemented parallel medical/records processing and dedicated case management for the already tracked military COVID-vaccine reinstatement process, changing the operating return pathway and preserving an April 1, 2027 return window. It proves no individual eligibility decision, completed correction, return count or readiness effect." W3-DS-OBJ-068,promotion_review,plotline_support_only,"[""Technology/AI"",""Military""]","[""The AI build-out""]","[""funding"",""implementation"",""watch""]",update_watch,W3-AA-SUP-011,"C — Shipcom's eight AI test-program sets support the defense AI-build record, but this is ordinary procurement. Full stated obligation does not prove delivery, acceptance, use, maintenance effect or validated test capability." W3-DS-OBJ-179,promotion_review,plotline_support_only,"[""Technology/AI"",""Military""]","[""Defense tech & autonomous weapons""]","[""funding"",""implementation"",""watch""]",update_watch,W3-AA-SUP-012,"C — BLADE supports the lethal-AI/electronic-warfare watch, but it is an ordinary R&D contract with a limited award-time obligation. The action does not prove research completion, test success, transition, production, fielding, use or battlefield effect." W3-DS-OBJ-189,promotion_review,completeness_census_only,[],[],[],none,W3-AA-CEN-005,"B — the Leidos munition-readiness row is a no-funds-at-award base IDIQ for future advanced research. Ceiling and munition adjacency do not establish a task order, obligation, result, readiness change or specific established Observatory transition." W3-DS-OBJ-264,promotion_review,plotline_support_only,"[""Space"",""Technology/AI"",""Military""]","[""Commercial space & the high ground"",""Defense tech & autonomous weapons""]","[""funding"",""implementation"",""watch""]",update_watch,W3-AA-SUP-013,"C — Trusted Space supports the resilient/autonomous-satellite research watch, but this is an ordinary R&D contract with a small initial obligation. It does not prove experiment completion, satellite build, launch, deployment, autonomy performance or operating mission use."