VA FY2027 VOLUME4 PHYSICAL 41 80 AUDIT

.json · 2 sections · 15105 characters

Source, owner, and dates

workbench: _Working/federal-budget-2026-2027/goal/terra_human/va/batch28/VA_FY2027_VOLUME4_PHYSICAL_41_80_AUDIT.json

Canonical source SHA-256: c531294c6e9e31f20659987ac87e16a6fd1c8fe6704f2cc8e9b4fde7c1ad6346

Served copy SHA-256: c531294c6e9e31f20659987ac87e16a6fd1c8fe6704f2cc8e9b4fde7c1ad6346

Owner evidence cutoffs: {"federal-budget-fy2026-fy2027": "2026-09-11T19:55:13-04:00"}

These are package-level cutoffs, not a claim that this source was rechecked on those dates. Use its own publication and capture dates.

Owners: federal-budget-fy2026-fy2027

complete text

Opening section

Section 1 of 2

{ "artifact_type": "bounded_full_sequential_CJ_read_receipt", "status": "complete_for_assigned_physical_page_range", "created": "2026-09-11", "source_document": { "identity": "U.S. Department of Veterans Affairs, FY 2027 Budget Submission, Volume 4 of 5: Construction, Long Range Capital Plan and Appendix", "official_url": "https://department.va.gov/wp-content/uploads/2026/04/Volume-4.pdf", "physical_pdf_page_count_observed_in_official_reader": 502, "local_source_path": null, "source_access": "Official PDF reader; no local download/extraction path claimed." }, "page_coverage": { "physical_pdf_pages_read": "41-80 inclusive in one-based terms; corresponding official-reader indices 40-79 inclusive", "printed_content_covered": "Construction, Major 2-21 to 2-60, including the intentionally blank physical page/index 79 after printed 2-60", "sequential_read_method": "All 40 assigned physical pages read in sequence in the official PDF reader. Tables were inspected for labels, bases, calculations/method references, totals, and current versus future-year distinctions, not transcribed cell by cell.", "next_unread_physical_page_one_based": 81, "next_unread_reader_index": 80, "next_unread_printed_page": "2-61", "remaining_scope": "physical pp.81-502 (reader indices 80-501), subject to page-map and blank-page checks" }, "claims_and_boundaries": [ { "printed_pages": "2-21 to 2-24", "claim": "The $30 million San Antonio request is for land acquisition; VA describes future construction and all new-project/activation costs as TBD pending 15% design and/or Army Corps acceptance.", "status": "FY2027_request_with_future_activity", "boundary": "The VISN 17 Southern Market table has a 2024 baseline plus 2029/2034/2044 projections. The future demographic, workload, schedule, and operating-cost fields are estimates, not observed delivery or capacity." }, { "printed_pages": "2-25 to 2-30", "claim": "VA requests $1.18182 billion for Manchester replacement-facility work, while future completion/demolition totals remain TBD. The prospectus identifies it as an EO 14296 priority rather than reporting an ordinary SCIP score.", "status": "FY2027_project_request_and_priority_rationale", "boundary": "The State of New Hampshire 2024 data point and projected 2029-2044 population/workload values must remain distinct. The cited EO priority, preferred-alternative narrative, and schedule do not demonstrate authorization, award, completion, or service outcome." }, { "printed_pages": "2-31 to 2-36", "claim": "VA requests $50.7 million to renovate WLA Buildings 211 and 226 for NCWI-related MWRE/town-hall functions, with a life-cycle alternative table identifying renovation as preferred.", "status": "FY2027_project_request_and_modelled_alternative_comparison", "boundary": "The cost table is explicitly discounted dollars and uses a cost-effectiveness-analysis template. It is a modelled alternative comparison, not an observed savings or realised benefit. Current versus proposed operating-cost fields and 2028 schedule are administrative/forecast inputs." }, { "printed_pages": "2-37 to 2-44", "claim": "VA requests $78.9 million for WLA Building 213 CLC renovation; the prospectus presents renovation as its preferred alternative and gives a $78.9 million estimated cost.", "status": "FY2027_project_request_and_modelled_alternative_comparison", "boundary": "The table's FY2024 values and current beds/FTEE are agency administrative data; the later demographic/workload columns, 2028 schedule, discounted life-cycle comparison, and stated benefits are forecast/model/request-side material." }, { "printed_pages": "2-45 to 2-52", "claim": "VA requests $62.7 million for WLA Building 215 CLC renovation, with the prospectus showing a $62.7 million estimated total cost and a preferred-renovation comparison.", "status": "FY2027_project_request_and_modelled_alternative_comparison", "boundary": "The life-cycle figures use the template-defined recurring expense and discounted construction assumptions. They do not establish actual lifecycle savings, performance, or NCWI service results." }, { "printed_pages": "2-53 to 2-60", "claim": "VA requests $77.8 million for WLA Building 214 domiciliary renovation and identifies it as an EO 14296/Secretary priority. The prospectus shows a $77.8 million estimated total cost and a modelled renovation alternative.", "status": "FY2027_project_request_and_modelled_alternative_comparison", "boundary": "Its 2024/forecast market data, PIT homelessness figures, projected schedule, and discounted-life-cycle table are distinct inputs. Building 214's stated current operational status and 100 beds are agency claims/data, not a measure of the proposed renovation's future effect." } ], "formulation_inputs_and_named_upstream_objects": [ { "id": "v4_eo14296_repeated_priority", "identity": "Executive Order 14296, Keeping Promises to Veterans and Establishing a National Center for Warrior Independence", "type": "executive order / stated priority input", "printed_CJ_pages": ["2-25", "2-29", "2-31", "2-33", "2-37", "2-41", "2-45", "2-49", "2-53", "2-55", "2-57"], "role_in_CJ": "The prospectuses use EO 14296 to characterize Manchester and WLA priorities, preferred alternatives, NCWI requirements, and a 2028 planning horizon.", "status": "cited_in_CJ_only", "url": null, "limits": "The order was not read in this batch. The CJ's policy framing is not independent proof that each requested project is legally authorized, funded, executable, or outcome-producing." }, { "id": "v4_scip_priority_and_gap_process_repeated", "identity": "VA Strategic Capital Investment Planning (SCIP) process, priority scoring, gap identification, and Secretary priority designation", "type": "agency planning/scoring process", "printed_CJ_pages": ["2-21", "2-22", "2-25", "2-31", "2-37", "2-45", "2-53"], "role_in_CJ": "Provides the stated project-gap and priority framework; the prospectuses say major projects are typically funded based on SCIP rank and ability to award, with EO-identified projects treated as Secretary priorities.", "status": "described_in_CJ_only", "url": null, "limits": "No project business case, gap analysis, decision weights, ranking record, or approval evidence was read. 'Typically' does not establish that a score determines funding." }, { "id": "v4_army_corps_15percent_gate_repeated", "identity": "Army Corps of Engineers project acceptance and 15-percent-design cost-development gate", "type": "agency process / cost-estimation condition", "printed_CJ_pages": ["2-21", "2-23", "2-29", "2-30"], "role_in_CJ": "Conditions completion of San Antonio and Manchester project-cost analyses on 15% design and/or Army Corps acceptance.", "status": "described_in_CJ_only", "url": null, "limits": "No acceptance, design package, cost estimate, or independent cost review was read. It marks unresolved total-cost uncertainty." }, { "id": "v4_visn17_southern_market_forecasts", "identity": "VISN 17 Southern Market demographic and workload data/projections", "type": "agency administrative data and forecast", "printed_CJ_pages": ["2-22", "2-23"], "role_in_CJ": "San Antonio project need/capacity input, showing 2024 baseline values and 2029/2034/2044 projections.", "status": "agency_data_and_forecast_in_CJ_only", "url": null, "limits": "Raw data, definitions, model method, and uncertainty absent. Pharmacy and laboratory/pathology stops are excluded according to the CJ." }, { "id": "v4_new_hampshire_population_workload_forecasts", "identity": "State of New Hampshire projected Veteran/enrollee populations and workload data", "type": "agency administrative data and forecast", "printed_CJ_pages": ["2-29", "2-30"], "role_in_CJ": "Manchester project need/capacity input, showing 2024 baseline values and 2029/2034/2044 projections.", "status": "agency_data_and_forecast_in_CJ_only", "url": null, "limits": "Source dataset, forecast assumptions, and uncertainty were not identified; pharmacy and laboratory/pathology stops are excluded." }, { "id": "v4_wla_market_data_and_pit_counts", "identity": "VISN 22 Greater Los Angeles/all-market demographic and workload projections, plus VA Point in Time (PIT) homelessness-count estimates", "type": "agency data, forecast, and count estimate bundle", "printed_CJ_pages": ["2-35", "2-39", "2-40", "2-43", "2-47", "2-50", "2-54", "2-57", "2-58"], "role_in_CJ": "Inputs to WLA project need, capacity, and NCWI narratives; tables distinguish 2024 values from projected 2029/2034/2044 values and cite catchment/California/national homelessness estimates.", "status": "agency_data_and_forecast_in_CJ_only", "url": null, "limits": "Underlying datasets, PIT methodology/vintage, forecast model, geography definitions, and uncertainty were not read. This compound record remains unsplit because the CJ does not give the component source identities." }, { "id": "v4_cost_effectiveness_template", "identity": "Unidentified cost-effectiveness analysis template for major-project alternative comparisons", "type": "cost/life-cycle model instrument", "printed_CJ_pages": ["2-34", "2-40", "2-48", "2-49", "2-56", "2-57"], "role_in_CJ": "Defines recurring operating expenses/supplies and presents discounted construction/renovation/build-out cost comparisons across status quo, renovation, new construction, lease, contract-out, and other alternatives.", "status": "method_described_in_CJ_only_identity_unresolved", "url": null, "limits": "No template name/version, discount rate, horizon, data source, model assumptions, or validation is supplied. The rankings are agency model outputs, not causal evidence." }, { "id": "v4_high_level_market_research_wla", "identity": "High-level market research on suitable acquisition/renovation alternatives in West Los Angeles", "type": "unnamed market-research input", "printed_CJ_pages": ["2-34", "2-40", "2-48", "2-56"], "role_in_CJ": "CJ says it found no suitable nearby facility capable of meeting project requirements, leading VA to exclude acquisition alternatives from quantitative analyses.", "status": "described_in_CJ_only_identity_unresolved", "url": null, "limits": "No title, date, preparer, search area/method, results file, or URL supplied." }, { "id": "v4_va_dow_coordination_input", "identity": "VHA Office of Interagency Health Affairs—Office of VA-Department of War Coordination", "type": "interagency operational input", "printed_CJ_pages": ["2-34", "2-40", "2-48", "2-56"], "role_in_CJ": "CJ attributes the determination that no nearby facility-sharing opportunity exists for joint VA/DoW alternatives to this office.", "status": "described_in_CJ_only", "url": null, "limits": "No correspondence, assessment, geographic analysis, or decision record read; the stated nonavailability is not independently verified." }, { "id": "v4_historic_preservation_consultation", "identity": "California State Historic Preservation Office, Los Angeles Conservancy, and Advisory Council on Historic Preservation", "type": "stakeholder/consultation bodies", "printed_CJ_pages": ["2-31", "2-32"], "role_in_CJ": "Named as historical-preservation stakeholders in the Buildings 211/226 renovation description.", "status": "named_in_CJ_only", "url": null,

Section 2 (continued)

Section 2 of 2

  "limits": "No consultation record, finding, approval, or condition was read. Naming stakeholders does not establish consent or completed compliance."
},
{
  "id": "v4_national_register_smyth_tower",
  "identity": "National Register of Historic Places listing for Smyth Tower",
  "type": "historic-property record",
  "printed_CJ_pages": ["2-25"],
  "role_in_CJ": "CJ says Smyth Tower is a historic structure on the National Register and excluded from Manchester demolition.",
  "status": "cited_in_CJ_only",
  "url": null,
  "limits": "Listing record not read; no historical-review or demolition plan independently checked."
},
{
  "id": "v4_current_building_and_bed_status_data",
  "identity": "VA administrative facility-condition, building-age, current-bed/FTEE, and operational-status descriptions for Manchester and WLA Buildings 211/226, 213, 215, and 214",
  "type": "agency administrative data/condition assessment bundle",
  "printed_CJ_pages": ["2-25", "2-27", "2-31", "2-32", "2-37", "2-38", "2-45", "2-46", "2-53", "2-54"],
  "role_in_CJ": "Supports the asserted baseline condition, seismic deficiency, existing capacity, and proposed-renovation rationale.",
  "status": "agency_claim_and_data_in_CJ_only",
  "url": null,
  "limits": "No facility-condition assessments, seismic reports, inventory, FTEE dataset, or capacity validation was read."
}

], "table_measure_and_basis_handling": { "observed_or_currently_described": [ "2024 demographic/workload columns, subject to their unidentified source/method limits", "current building age, operational status, existing beds/FTEE, and present-facility operating-cost rows as VA administrative descriptions", "listed historic-status/consultation identities, not their underlying records" ], "forecast_request_or_modelled": [ "FY2027 project requests; 2028 award/completion/activation schedules; future construction/demolition activity", "2029, 2034, and 2044 demographic/workload values", "discounted life-cycle cost, FTEE, and alternative-benefit tables generated with an unidentified cost-effectiveness template", "priority/Secretary designation and preferred-alternative rationale" ], "interpretive_limit": "The prospectuses support VA's stated formulation and comparison process. They do not establish that preferred alternatives will be awarded, complete on schedule, cost as estimated, meet a projected demand path, or produce stated access/safety/outcome effects." }, "remaining_work": [ "Continue at physical p81 / reader index80 / printed 2-61.", "If separately authorized, locate/read original SCIP records, EO14296, WLA master-plan and preservation records, market research, VA/DoW coordination record, PIT methodology, demographic/workload models, cost-effectiveness template, cost estimates, and authorization/award records.", "Do not turn FY2027 request/anticipated resource/schedule or modelled alternative assertions into enacted, actual, or completed-project claims." ] }