.csv · 11 sections · 120823 characters
workbench: Research Packages/Federal Government Full Freshness Sweep 2026-08-22/waves/wave_4_logistics/PRIMARY_OBJECT_DISPOSITION_LEDGER.csv
Canonical source SHA-256: e7a84c28ef3470d0bca821866be0d99be50b25412afb2b58de99b5d17e7e6ad6
Served copy SHA-256: e7a84c28ef3470d0bca821866be0d99be50b25412afb2b58de99b5d17e7e6ad6
Owner evidence cutoffs: {"federal-government-full-freshness-sweep-2026-08-22": "2026-08-23"}
These are package-level cutoffs, not a claim that this source was rechecked on those dates. Use its own publication and capture dates.
Owners: federal-government-full-freshness-sweep-2026-08-22
Section 1 of 11
object_id,wave,entity_id,issuer,publishing_parent,object_type,source_families,stable_object_id,title,source_url,archive_or_pdf_url,announcement_clock,decision_signature_clock,filing_clock,public_inspection_clock,publication_clock,effective_clock,implementation_clock,operating_clock,observed_effect_clock,state_before,state_after,claim_limit,existing_coverage,novelty_class,disposition,promotion_route,retrieval_cutoff W4-CI-OBJ-001,4,fg-120,Department of Commerce,Department of Commerce,Federal Register notice,legal_regulatory_instruments,2026-16621,2026 Unified Agenda of Regulations,https://www.federalregister.gov/d/2026-16621,,,,,,2026-08-14 date level,,,,,Commerce regulatory planning was represented through the ordinary semiannual agenda process.,The 2026 unified agenda notice was published.,The carrier announces an agenda; it does not itself enact each listed rule or prove a material plotline change.,Fresh official carrier; no substantive pre-campaign event dependency.,routine_reject,retained as routine planning census only,none,2026-08-23 09:38:07 EDT W4-CI-OBJ-006,4,fg-123,National Institute of Standards and Technology,National Institute of Standards and Technology,Federal Register request for information,legal_regulatory_instruments,2026-16371,RFI on Modernizing the National Vulnerability Database in the Age of Artificial Intelligence,https://www.federalregister.gov/d/2026-16371,,,,,,2026-08-12 date level,,,,,The NVD modernization RFI had already been captured in the Aug. 13 weekly delta.,The same RFI remains on the official Federal Register carrier.,Exact prior research controls novelty; an RFI also proves no final NVD architecture or implementation.,Research Packages/Federal Government Weekly Delta 2026-08-13/ exact substantive coverage.,duplicate,hard duplicate reject,none,2026-08-23 09:38:07 EDT W4-CI-OBJ-007,4,fg-123,National Institute of Standards and Technology,National Institute of Standards and Technology,Federal Register rule,legal_regulatory_instruments,2026-17082,Traffic and Conduct on the Grounds of Certain NIST Sites,https://www.federalregister.gov/d/2026-17082,,,,,,2026-08-21 date level,,,,,Site conduct rules used the prior text.,NIST published updated site traffic and conduct rules.,The rule is ordinary site administration and does not materially change an established Observatory storyline.,No exact pre-campaign match located.,time_novel,retain as completeness census only,none,2026-08-23 09:38:07 EDT W4-CI-OBJ-003,4,fg-123,National Institute of Standards and Technology,National Institute of Standards and Technology,voluntary cybersecurity framework profile,publications_libraries_foia_archives;publisher_root_feeds_sitemaps,NIST-CSF-TRANSIT-PROFILE-FINAL-2026-08-05,Strengthening Transit Resilience: Final CSF Community Profile,https://www.nist.gov/news-events/news/2026/08/strengthening-transit-resilience-final-csf-community-profile-upcoming,,,,,,2026-08-05 date level,,,,,The transit profile was under development.,NIST announced the final voluntary transit CSF community profile.,"Final publication is standards support; it is not a mandate, adoption decision, cyber incident, or operating outcome.",No exact pre-campaign final-page match located.,time_novel,retain as plotline support only,none,2026-08-23 09:38:07 EDT W4-CI-OBJ-002,4,fg-123,National Institute of Standards and Technology,National Institute of Standards and Technology,interagency memorandum of understanding and implementation announcement,operations_organization_funding_data;publications_libraries_foia_archives;publisher_root_feeds_sitemaps,NIST-DOE-GENESIS-MOU-2026-08-04,NIST Joins National Genesis Mission to Accelerate AI Innovation,https://www.nist.gov/news-events/news/2026/08/nist-joins-national-genesis-mission-accelerate-ai-innovation,,2026-08-04 date level,,,,,,,two-year sprints beginning from the 2026-08-04 announced operating state,,Genesis Mission collaboration existed without this NIST-DOE operating agreement or these two identified NIST implementation sprints in the reservoir.,"NIST and DOE Office of Science signed an MOU; NIST identified two two-year AI implementation sprints, including autonomous manufacturing agents and critical-infrastructure cyber defense.","The announcement proves the MOU and stated sprint designs, including a goal to scale drone production tenfold in two years; it does not prove achieved production, deployment, procurement, or outcome.","No exact pre-campaign title, URL, or substantive MOU record found; same-campaign discovery is not the novelty floor.",time_novel,admit to tightly bounded promotion review,new_event_review,2026-08-23 09:38:07 EDT W4-CI-OBJ-009,4,fg-123,National Institute of Standards and Technology,National Institute of Standards and Technology,grouped official-news enumeration,publications_libraries_foia_archives;publisher_root_feeds_sitemaps,NIST-NEWS-ROUNDUP-2026-08-06_19,"NIST quantum, 5G, nanotechnology, NIIMBL, and advisory-meeting items — grouped census",https://www.nist.gov/news-events/news,,,,,,2026-08-06 through 2026-08-19 date-level enumeration window,,,,,The post-floor NIST news surface required full enumeration.,The remaining dated NIST science and meeting items were checked and grouped.,This group preserves census proof only; it makes no single-object claim and confers no event status.,No promotion dependency; grouped from the fresh native index.,state_recertification,retain as completeness census only,none,2026-08-23 09:38:07 EDT W4-CI-OBJ-005,4,fg-123,National Institute of Standards and Technology,National Institute of Standards and Technology,initial public draft with two official carrier pages,publications_libraries_foia_archives;publisher_root_feeds_sitemaps,NIST-SP-1353-IPD-2026-08-19,Using Artificial Intelligence for Cybersecurity Framework 2.0 Analysis and Reporting — initial public draft,https://www.nist.gov/news-events/news/2026/08/seeking-public-comment-using-artificial-intelligence-cybersecurity,,,,,,2026-08-19 date level,,,,,The quick-start guide was not available for this public comment round.,NIST released SP 1353 as an initial public draft and requested comments.,Two NIST carrier pages describe one draft object; the row proves neither a final standard nor implementation by regulated entities.,No exact pre-campaign SP 1353 draft match located.,time_novel,retain as one support object; do not double-count carrier pages,none,2026-08-23 09:38:07 EDT W4-CI-OBJ-004,4,fg-123,National Institute of Standards and Technology,National Institute of Standards and Technology,initial public draft,publications_libraries_foia_archives;publisher_root_feeds_sitemaps,NIST-TEVV-ATHLON-IPD-2026-08-07,TEVV-Athlon Framework for Evaluating AI Systems — initial public draft,https://www.nist.gov/artificial-intelligence/ai-research/tevv-athlon-framework-evaluating-ai-systems,,,,2026-10-06 comment deadline,,2026-08-07 date level,,,,,The draft evaluation framework had not opened this comment round.,NIST posted the initial public draft and invited comments through October 6.,"A draft and comment deadline are not a final standard, adoption decision, or tested operating result.",No exact pre-campaign draft-page match located.,time_novel,retain as plotline support only,none,2026-08-23 09:38:07 EDT W4-CI-OBJ-008,4,fg-123,National Institute of Standards and Technology,National Institute of Standards and Technology,Inspector General final audit report,oversight_courts_congress;publications_libraries_foia_archives,OIG-26-025-A,Audit of NIST MEP Awards to Ohio Department of Development,https://www.oig.doc.gov/audit-of-nist-mep-awards-to-ohio-department-of-development/,,,,,,2026-08-19 date issued,,,,,The award-oversight audit had not issued its final report.,Commerce OIG issued the final audit reporting financial-reporting and expense-oversight deficiencies.,The report is bounded to the cited awards and findings; it does not establish department-wide program failure or a new control plane.,No exact pre-campaign final-report match located.,time_novel,retain as economy oversight support only,none,2026-08-23 09:38:07 EDT W4-CI-OBJ-012,4,fg-124,United States Patent and Trademark Office,United States Patent and Trademark Office,Federal Register notice,legal_regulatory_instruments,2026-16315,Administrative Updates to Patent Bar Admission Requirements,https://www.federalregister.gov/d/2026-16315,,,,,,2026-08-11 date level,2026-08-11 date level,,,,Biomedical Science remained in Category B for patent-bar admission.,USPTO moved Biomedical Science to Category A under its periodic review.,"The update is an ordinary professional-admission adjustment, not a material Observatory plotline change.",No exact pre-campaign match located.,time_novel,retain as completeness census only,none,2026-08-23 09:38:07 EDT W4-CI-OBJ-013,4,fg-124,United States Patent and Trademark Office,United States Patent and Trademark Office,Federal Register request for comments,legal_regulatory_instruments;operations_organization_funding_data,2026-16744,Request for Comments on Community Outreach Office Locations in the Southwest States,https://www.federalregister.gov/d/2026-16744,,,,,,2026-08-17 date level,,,,,USPTO had not opened this location-selection comment process.,USPTO requested public input on possible Southwest outreach-office locations.,"A location RFI is proposal-stage and does not prove selection, lease, staffing, opening, or operation.",No exact pre-campaign match located.,time_novel,retain as completeness census only,none,2026-08-23 09:38:07 EDT W4-CI-OBJ-011,4,fg-124,United States Patent and Trademark Office,United States Patent and Trademark Office,precedential PTAB decision,legal_regulatory_instruments;publications_libraries_foia_archives,EX-PARTE-BAURIN-2024-002920,Precedential Ex parte Baurin decision on obviousness-type double patenting,https://www.uspto.gov/patents/ptab/precedential-informative-decisions,,,2026-08-06 date level,,,2026-08-06 designation date,,,,,The rehearing decision had not been designated precedential.,USPTO designated the Aug. 6 decision precedential.,The decision matters to patent practice but is not joined to a current established Observatory plotline.,No exact pre-campaign designation match located.,time_novel,retain as legal completeness census only,none,2026-08-23 09:38:07 EDT W4-CI-OBJ-010,4,fg-124,United States Patent and Trademark Office,United States Patent and Trademark Office,official economic report announcement,publications_libraries_foia_archives;publisher_root_feeds_sitemaps,USPTO-IP-INTENSIVE-INDUSTRIES-REPORT-2026,IP-intensive industries provide better paying jobs and account for 44% of U.S. GDP — USPTO study,https://www.uspto.gov/about-us/news-updates,,,,,,2026-08-03 date level,,,,,The 2026 edition was not represented in the pre-campaign reservoir.,USPTO released the 2026 study on IP-intensive industries.,"The announcement supplies descriptive economic research, not a new patent rule or causal proof of future growth.",No exact pre-campaign title match located; release predates the Aug. 4 legal floor by one day and is admitted only as reservoir-new historical support.,reservoir_new_historical,retain as economy support only,none,2026-08-23 09:38:07 EDT
Section 2 of 11
W4-CI-OBJ-015,4,fg-124,United States Patent and Trademark Office,United States Patent and Trademark Office,grouped routine service notices,operations_organization_funding_data;publications_libraries_foia_archives;publisher_root_feeds_sitemaps,USPTO-MAINTENANCE-GAZETTE-EVENTS-2026-08,"USPTO maintenance, gazette, and event notices — grouped census",https://www.uspto.gov/system-status,,,,,,,,,2026-08 recurring maintenance and publication window,,Routine service and publication schedules were ongoing.,"The current maintenance, gazette, and event surfaces were enumerated.",This grouped row proves coverage only and makes no claim that any service notice is an Observatory event.,Routine current surface; no novelty claim.,routine_reject,routine maintenance hard reject,none,2026-08-23 09:38:07 EDT W4-CI-OBJ-014,4,fg-124,United States Patent and Trademark Office,United States Patent and Trademark Office,office-location announcement,operations_organization_funding_data;publisher_root_feeds_sitemaps,USPTO-NC-COMMUNITY-OFFICE-SELECTION-2026-08-18,USPTO selects North Carolina for expanding community engagement,https://www.uspto.gov/about-us/news-updates/uspto-selects-north-carolina-its-expanding-community-engagement,,2026-08-18 date level,,,,,,,,,North Carolina had not been selected on this carrier.,USPTO announced North Carolina as the state for an expanding community-engagement presence.,"The announcement does not establish an opened office, exact site, lease, staffing, budget obligation, or operating service date.",No exact pre-campaign match located.,time_novel,retain as completeness census only,none,2026-08-23 09:38:07 EDT W4-CI-OBJ-019,4,fg-125,Bureau of Industry and Security,Bureau of Industry and Security,Federal Register implementation notice,legal_regulatory_instruments,2026-15799,UK patented-pharmaceutical tariff reduction implemented by Proclamation 11020,https://www.federalregister.gov/d/2026-15799,,,,,,2026-08-04 date level,,,,,The UK pharmaceutical tariff implementation notice was already captured in the Aug. 4 whole-site research.,The identical notice remains on the official carrier.,Exact prior coverage bars re-promotion.,Research Packages/Federal Government Whole-Site Recertification 2026-08-01/ Aug. 4 industrial-surface receipt.,duplicate,hard duplicate reject,none,2026-08-23 09:38:07 EDT W4-CI-OBJ-018,4,fg-125,Bureau of Industry and Security,Bureau of Industry and Security,Federal Register request for comments,legal_regulatory_instruments,2026-15961,"Proposed Section 232 duties on additional aluminum, steel, and copper derivative articles",https://www.federalregister.gov/d/2026-15961,,,,,,2026-08-06 date level,,,,,The proposed derivative-article process was already captured in the Aug. 8 research.,The same comment notice remains on the official carrier.,Exact prior coverage and proposal status independently bar promotion.,Research Packages/Federal Government Weekly Delta 2026-08-08/ exact substantive coverage.,duplicate,hard duplicate reject,none,2026-08-23 09:38:07 EDT W4-CI-OBJ-016,4,fg-125,Bureau of Industry and Security,Bureau of Industry and Security,Federal Register temporary final rule,legal_regulatory_instruments,2026-16078,DPAS Directive Allocation Order and Additional Requirements for Recoverable Critical Minerals and Materials,https://www.federalregister.gov/d/2026-16078,,,,,,2026-08-06 date level,2026-08-27 date level,,2026-08-27 through 2027-08-27 stated rule period,,The critical-minerals allocation rule was already substantively captured in the Aug. 8 research.,The identical rule remains on the official carrier.,Exact prior coverage bars re-promotion even though the rule is highly relevant; this row is dedup proof only.,Research Packages/Federal Government Weekly Delta 2026-08-08/waves/WAVE_2_NATIONAL_COMMAND_FOREIGN_DEFENSE_INTELLIGENCE.md.,duplicate,hard duplicate reject,none,2026-08-23 09:38:07 EDT W4-CI-OBJ-017,4,fg-125,Bureau of Industry and Security,Bureau of Industry and Security,Federal Register final rule,legal_regulatory_instruments,2026-16628,Streamlining Export Controls for Drone Exports,https://www.federalregister.gov/d/2026-16628,,,,,,2026-08-14 date level,,,,,The drone-export rule was already captured in the Aug. 13 weekly research.,The same final rule was published on the official carrier.,Exact prior coverage controls novelty; no second event is created by fresh site retrieval.,Research Packages/Federal Government Weekly Delta 2026-08-13/ exact substantive coverage.,duplicate,hard duplicate reject,none,2026-08-23 09:38:07 EDT W4-CI-OBJ-020,4,fg-125,Bureau of Industry and Security,Bureau of Industry and Security,Federal Register final rule,legal_regulatory_instruments,2026-17230,Removal From the Entity List,https://www.federalregister.gov/d/2026-17230,,,,,2026-08-21 date level,2026-08-24 scheduled publication date,,,,,The public-inspection rule was already captured in the Aug. 21 weekly research.,The same singular rule is scheduled for Aug. 24 publication.,"The distinct document is preserved separately from 2026-17231, but exact prior coverage bars promotion.",Research Packages/Federal Government Weekly Delta 2026-08-21/ exact public-inspection coverage.,duplicate,hard duplicate reject,none,2026-08-23 09:38:07 EDT W4-CI-OBJ-021,4,fg-125,Bureau of Industry and Security,Bureau of Industry and Security,Federal Register final rule,legal_regulatory_instruments,2026-17231,Revisions to the Entity List,https://www.federalregister.gov/d/2026-17231,,,,,2026-08-21 date level,2026-08-24 scheduled publication date,,,,,The public-inspection rule was already captured in the Aug. 21 weekly research.,The same singular rule is scheduled for Aug. 24 publication.,"The distinct document is preserved separately from 2026-17230, but exact prior coverage bars promotion.",Research Packages/Federal Government Weekly Delta 2026-08-21/ exact public-inspection coverage.,duplicate,hard duplicate reject,none,2026-08-23 09:38:07 EDT W4-CI-OBJ-022,4,fg-125,Bureau of Industry and Security,Bureau of Industry and Security,administrative enforcement settlement,legal_regulatory_instruments;operations_organization_funding_data,BIS-E3053,"BIS administrative enforcement settlement with Plexon, Inc.",https://www.bis.gov/press-release/bis-reaches-administrative-enforcement-settlement-plexon-inc.,,2026-08-14 date level,2026-08-14 order date,,,,,,,,No Plexon settlement was listed on the current enforcement index.,BIS listed case E3053 with an Aug. 14 order date.,This row proves the case disposition only; it does not establish a broader export-control policy or material established-plotline change.,No exact pre-campaign match located.,time_novel,retain as completeness census only,none,2026-08-23 09:38:07 EDT W4-CI-OBJ-023,4,fg-126,International Trade Administration,International Trade Administration,Federal Register tariff-procedure notice,legal_regulatory_instruments;operations_organization_funding_data,2026-16859,Amended USMCA automobile U.S.-content submission procedures,https://www.federalregister.gov/d/2026-16859,,,,,,2026-08-19 date level,,2026-08-19 submissions may begin; 2026-09-30 documentation deadline,2026-12-01 through 2027-11-30 first ordinary one-year eligibility period,,"Automobile U.S.-content determinations followed the May 2025 six-month framework, distinct from the MHDV calendar.","Commerce conformed the automobile and MHDV submission cycles, opened submissions Aug. 19, required new documentation by Sept. 30 for imports from Dec. 1, and set ordinary one-year eligibility periods.",The notice changes submission and validity procedures only; it does not change the underlying 25 percent tariff rate or prove any model's approval.,"No exact pre-campaign document number, title, URL, or substantive procedure change found.",time_novel,admit to tightly bounded promotion review,new_event_review,2026-08-23 09:38:07 EDT W4-CI-OBJ-024,4,fg-126,International Trade Administration,International Trade Administration,Foreign-Trade Zones Board subzone approval,legal_regulatory_instruments;operations_organization_funding_data,2026-16907,"Approval of Subzone Status; Fermi, Inc.; Panhandle, Texas",https://www.federalregister.gov/d/2026-16907,,,2026-08-17 date level,,2026-08-18 08:45 EDT,2026-08-19 date level,,,,,Fermi's Subzone 252B application had been docketed but not approved.,"The FTZ Board Executive Secretary approved Subzone 252B, subject to the FTZ Act, regulations, and FTZ 252's 2,000-acre activation limit.","This proves subzone legal status only; it does not authorize, fund, construct, commission, or operate Fermi's proposed nuclear, gas, data-center, or AI infrastructure.","No exact pre-campaign approval document, title, or URL found.",time_novel,admit to tightly bounded promotion review,new_event_review,2026-08-23 09:38:07 EDT W4-CI-OBJ-025,4,fg-126,International Trade Administration,International Trade Administration,Federal Register trade-remedy order,legal_regulatory_instruments,2026-17049,Silicon Metal From Australia and Norway: Countervailing Duty Orders,https://www.federalregister.gov/d/2026-17049,,,,,,2026-08-21 date level,,,,,The countervailing-duty order was already captured from public inspection in the Aug. 21 weekly research.,The singular order was published Aug. 21.,"It remains distinct from antidumping document 2026-17050, but exact prior coverage bars promotion.",Research Packages/Federal Government Weekly Delta 2026-08-21/ exact narrative coverage.,duplicate,hard duplicate reject,none,2026-08-23 09:38:07 EDT W4-CI-OBJ-026,4,fg-126,International Trade Administration,International Trade Administration,Federal Register trade-remedy order,legal_regulatory_instruments,2026-17050,Silicon Metal From Australia and Norway: Antidumping Duty Orders,https://www.federalregister.gov/d/2026-17050,,,,,,2026-08-21 date level,,,,,The antidumping order was already captured from public inspection in the Aug. 21 weekly research.,The singular order was published Aug. 21.,"It remains distinct from countervailing document 2026-17049, but exact prior coverage bars promotion.",Research Packages/Federal Government Weekly Delta 2026-08-21/ exact narrative coverage.,duplicate,hard duplicate reject,none,2026-08-23 09:38:07 EDT W4-CI-OBJ-028,4,fg-126,International Trade Administration,International Trade Administration,Federal Register information-collection notice,legal_regulatory_instruments,2026-17155,Information collection for tariff adjustments tied to new U.S. steel or aluminum production,https://www.federalregister.gov/d/2026-17155,,,,,,2026-08-21 date level,,,,,The information-collection review was not on this fresh carrier.,ITA submitted the tariff-adjustment collection for OMB review and comment.,"The notice supports tariff-procedure monitoring but proves no individual adjustment, production completion, or final control change.",No exact pre-campaign match located.,time_novel,retain as plotline support only,none,2026-08-23 09:38:07 EDT W4-CI-OBJ-029,4,fg-126,International Trade Administration,International Trade Administration,grouped proposal enumeration,legal_regulatory_instruments;operations_organization_funding_data,FTZ-PROPOSALS-INDUSTRIAL-2026-08,Plotline-adjacent FTZ production-activity proposals — grouped support census,https://www.federalregister.gov/agencies/foreign-trade-zones-board,,,,,,2026-08-04 through 2026-08-21 date-level proposal enumeration window,,,,,The enumerated industrial production-activity proposals had not entered the current FTZ carrier.,"The carrier included proposals touching semiconductors, solar, storage, and related industrial equipment.","This grouped row proves only proposal-stage carrier presence; it does not prove authorization, activation, construction, production, or operation for any project.",Fresh carrier enumeration with no prior exact grouped receipt.,time_novel,retain as plotline support only; bar standalone proposal promotion,none,2026-08-23 09:38:07 EDT
Section 3 of 11
W4-CI-OBJ-030,4,fg-126,International Trade Administration,International Trade Administration,grouped Federal Register enumeration,legal_regulatory_instruments,FTZ-ROUTINE-ACTIONS-2026-08,"Other FTZ approvals, withdrawals, and administrative actions — grouped census",https://www.federalregister.gov/agencies/foreign-trade-zones-board,,,,,,2026-08-04 through 2026-08-24 scheduled publication enumeration window,,,,,The FTZ carrier contained ordinary project administration.,Nineteen post-floor FTZ records were enumerated and the Fermi approval separated.,The group is coverage proof only and makes no collapsed-object or materiality claim.,Fresh carrier enumeration; no standalone novelty asserted.,routine_reject,routine/local FTZ churn reject,none,2026-08-23 09:38:07 EDT W4-CI-OBJ-031,4,fg-126,International Trade Administration,International Trade Administration,media advisory,publications_libraries_foia_archives;publisher_root_feeds_sitemaps,ITA-G20-MEDIA-ADVISORY-2026-08-14,ITA G20 media advisory,https://www.trade.gov/press-releases,,,,,,2026-08-14 date level,,,,,The advisory had already been captured in the weekly research.,The same advisory remained on the official press carrier.,"An event advisory is not an outcome, and exact prior coverage independently bars re-promotion.",Research Packages/Federal Government Weekly Delta 2026-08-13/ exact carrier coverage.,duplicate,hard duplicate and routine advisory reject,none,2026-08-23 09:38:07 EDT W4-CI-OBJ-027,4,fg-126,International Trade Administration,International Trade Administration,grouped Federal Register enumeration,legal_regulatory_instruments,ITA-TRADE-REMEDY-CARRIER-2026-08-04_24,ITA antidumping and countervailing notices — grouped routine census,https://www.federalregister.gov/agencies/international-trade-administration,,,,,,2026-08-04 through 2026-08-24 scheduled publication enumeration window,,,,,The ITA trade-remedy docket carried continuous case administration.,Eighty post-floor ITA records were enumerated and singular exceptions separated.,"This synthetic group is census proof, not a collapsed legal object; individual IDs remain on the carrier and none is promoted through this group.",Fresh full-carrier enumeration; routine churn has no standalone novelty claim.,routine_reject,routine trade-case maintenance hard reject,none,2026-08-23 09:38:07 EDT W4-CI-OBJ-033,4,fg-127,Economic Development Administration,Economic Development Administration,Inspector General audit initiation,oversight_courts_congress;publications_libraries_foia_archives,DOC-OIG-2026-545,Audit of EDA's Pre-Award Processes for FY 2023 Disaster Relief Funds,https://www.oig.doc.gov/audit-of-edas-pre-award-processes-for-fy-2023-disaster-relief-funds-2026-545/,,2026-08-05 date issued,,,,,,,,,The audit had not been initiated on the public carrier.,Commerce OIG initiated an audit of EDA pre-award processes.,"An initiation memorandum states an objective; it supplies no finding, conclusion, causal proof, or completed corrective action.",No exact pre-campaign initiation match located.,time_novel,retain as oversight watch support only,update_watch,2026-08-23 09:38:07 EDT W4-CI-OBJ-032,4,fg-127,Economic Development Administration,Economic Development Administration,grouped grant announcement,operations_organization_funding_data;publications_libraries_foia_archives;publisher_root_feeds_sitemaps,EDA-DISASTER-AWARDS-BATCH-2026-08-18,EDA disaster supplemental awards to five states — grouped announcement,https://www.eda.gov/news/press-release/2026/08/18/us-department-commerce-invests-285-million-disaster-supplemental,,2026-08-18 date level,,,,,,,,,The five listed disaster-recovery awards had not been announced on this carrier.,"EDA announced five awards totaling $28.5 million for water, port, industrial-park, training, and sewer infrastructure.","This is one grouped source object; award amounts and local projects alone do not clear promotion, and the announcement does not prove completion or outcomes.",No exact pre-campaign batch title or URL found.,time_novel,retain as infrastructure support only,none,2026-08-23 09:38:07 EDT W4-CI-OBJ-034,4,fg-127,Economic Development Administration,Economic Development Administration,grouped official-news enumeration,operations_organization_funding_data;publications_libraries_foia_archives;publisher_root_feeds_sitemaps,EDA-LOCAL-GRANT-CARRIER-2026-08,Other EDA local grant and program notices — grouped census,https://www.eda.gov/news/,,,,,,2026-08 current index observation window,,,,,The current EDA news carrier required enumeration.,The remaining local grant and program notices were checked and grouped.,This group proves coverage only; it does not create standalone events from award amounts or local routine administration.,Fresh native index; no standalone novelty asserted.,routine_reject,routine/local grant churn reject,none,2026-08-23 09:38:07 EDT W4-CI-OBJ-036,4,fg-129,Minority Business Development Agency,Minority Business Development Agency,entity-state recertification,operations_organization_funding_data;publications_libraries_foia_archives;publisher_root_feeds_sitemaps,MBDA-CURRENT-STATUTORY-AND-PUBLISHER-STATE-2026-08-23,MBDA current statutory and public-publisher state recertification,https://www.mbda.gov/minority-business-development-act-2021,,,2021-11-15 statutory enactment date,,,,,,,2026-08-23 current publisher-state observation,The campaign topology marked MBDA as a transition-reconstruction entity requiring current-site verification.,"The statutory permanence page, live root, and operating program directory remained public and current.","Public site continuity does not resolve proposed closeout funding, litigation, staffing, appropriations, or actual service capacity.",Transition reconstruction from 2025-01-20; current state checked anew.,state_recertification,retain as entity census only,none,2026-08-23 09:38:07 EDT W4-CI-OBJ-035,4,fg-129,Minority Business Development Agency,Minority Business Development Agency,grouped information-collection enumeration,legal_regulatory_instruments,MBDA-ICR-CRM-2026-16790_16792,MBDA CRM performance-database information collections — grouped census,https://www.federalregister.gov/agencies/minority-business-development-agency,,,,,,2026-08-18 date level,,,,,The two recurring CRM collection notices were not on the current carrier.,MBDA published two OMB information-collection notices on Aug. 18.,The grouped row preserves both document identities in the coverage note but is not a singular legal object or a material agency-state change.,Fresh carrier; routine collection renewals have no standalone novelty claim.,routine_reject,routine information-collection reject,none,2026-08-23 09:38:07 EDT W4-CI-OBJ-037,4,fg-130,Department of Commerce,Department of Commerce,entity-state recertification and budget request,operations_organization_funding_data;oversight_courts_congress;publications_libraries_foia_archives;publisher_root_feeds_sitemaps,DOC-FY2027-DM-CJ-INVESTMENT-ACCELERATOR,U.S. Investment Accelerator current office and FY2027 proposed operating state,https://www.commerce.gov/sites/default/files/2026-04/FY2027-DM-CJ-Submission.pdf,,,,,,2026-04 date level,,FY2027 proposed operating period,,,The new office required transition reconstruction and had no dedicated publisher.,"Commerce's FY2027 submission described a proposed $100 million, 75-position operating request for the office; Commerce remains its publisher.","A President's Budget request is proposed, not enacted funding, obligation, hiring, or proof that every stated investment function is operating.",Transition reconstruction from 2025-01-20; current Commerce-hosted evidence checked anew.,state_recertification,retain as entity census only,none,2026-08-23 09:38:07 EDT W4-EL-OBJ-015,4,fg-132,U.S. Department of Energy Office of Nuclear Energy,Department of Energy,Defense Production Act voluntary-agreement plan of action,legal_regulatory_instruments,2026-16224,Plan of Action Under the Defense Production Act (Human Mobilization Committee),https://www.federalregister.gov/documents/2026/08/10/2026-16224/plan-of-action-under-the-defense-production-act-human-mobilization-committee,https://public-inspection.federalregister.gov/2026-16224.pdf,,2026-07-28 date level,,2026-08-07 08:45 EDT,2026-08-10 date level,,,,,The committee lacked this final Secretary-approved plan of action in the public Federal Register.,The final plan established a DOE-chaired supervised committee process and bounded antitrust-defense conditions.,"The plan is not an appropriation, permit, purchase, award, fuel output, reactor deployment or immunity beyond compliant supervised activity.",Exact Federal Register document number and plan were covered by the 2026-08-08 weekly delta.,duplicate,exact_duplicate_reject,pre-campaign Aug. 8 weekly ownership,2026-08-23 10:21:17.132404 EDT W4-EL-OBJ-016,4,fg-132,U.S. Department of Energy Office of Nuclear Energy,Department of Energy,Defense Production Act voluntary-agreement plan of action,legal_regulatory_instruments,2026-16225,Plan of Action Under the Defense Production Act (Market-Integrated Fuel Utilization Committee),https://www.federalregister.gov/documents/2026/08/10/2026-16225/plan-of-action-under-the-defense-production-act-market-integrated-fuel-utilization-committee,https://public-inspection.federalregister.gov/2026-16225.pdf,,2026-07-28 date level,,2026-08-07 08:45 EDT,2026-08-10 date level,,,,,The committee lacked this final Secretary-approved plan of action in the public Federal Register.,The final plan established a DOE-chaired supervised committee process and bounded antitrust-defense conditions.,"The plan is not an appropriation, permit, purchase, award, fuel output, reactor deployment or immunity beyond compliant supervised activity.",Exact Federal Register document number and plan were covered by the 2026-08-08 weekly delta.,duplicate,exact_duplicate_reject,pre-campaign Aug. 8 weekly ownership,2026-08-23 10:21:17.132404 EDT W4-EL-OBJ-017,4,fg-132,U.S. Department of Energy Office of Nuclear Energy,Department of Energy,Defense Production Act voluntary-agreement plan of action,legal_regulatory_instruments,2026-16226,Plan of Action Under the Defense Production Act (Material Sufficiency Committee),https://www.federalregister.gov/documents/2026/08/10/2026-16226/plan-of-action-under-the-defense-production-act-material-sufficiency-committee,https://public-inspection.federalregister.gov/2026-16226.pdf,,2026-07-28 date level,,2026-08-07 08:45 EDT,2026-08-10 date level,,,,,The committee lacked this final Secretary-approved plan of action in the public Federal Register.,The final plan established a DOE-chaired supervised committee process and bounded antitrust-defense conditions.,"The plan is not an appropriation, permit, purchase, award, fuel output, reactor deployment or immunity beyond compliant supervised activity.",Exact Federal Register document number and plan were covered by the 2026-08-08 weekly delta.,duplicate,exact_duplicate_reject,pre-campaign Aug. 8 weekly ownership,2026-08-23 10:21:17.132404 EDT
Section 4 of 11
W4-EL-OBJ-014,4,fg-132,"U.S. Department of Energy Office of Cybersecurity, Energy Security, and Emergency Response",Department of Energy,facility-groundbreaking announcement,operations_organization_funding_data,DOE-CESER-ETAC-ERB-GROUNDBREAKING-2026-08-20,U.S. Department of Energy Convenes Government and Industry Energy Leaders to a Strategy Summit and Groundbreaking Ceremony,https://www.energy.gov/ceser/articles/us-department-energy-convenes-government-and-industry-energy-leaders-strategy-summit,,2026-08-20 date level,,,,2026-08-20 date level,,2026-08-20 groundbreaking ceremony,,,The Energy Resilience Building remained pre-groundbreaking and ETAC lacked this announced future home.,CESER and NLR concluded the summit and held the Energy Resilience Building groundbreaking for ETAC's future home.,"Groundbreaking does not prove construction progress beyond the ceremony, completion, commissioning, occupancy, accepted capability or operating ETAC workloads.","Full-workspace exact title, stable-ID and URL dedup was run on 2026-08-23 against governed pre-campaign research, July 25 and Aug. 1 whole-site work, weekly deltas through Aug. 21 and topical packages; no exact prior object was found.",time_novel,retain_as_plotline_support_only,existing grid-resilience support; generic groundbreaking demoted by close gate,2026-08-23 10:21:17.132404 EDT W4-EL-OBJ-013,4,fg-132,U.S. Department of Energy,Department of Energy,award announcement,operations_organization_funding_data,DOE-CLEVELAND-CLIFFS-STEEL-AWARD-2026-08-21,Energy Department Announces $500 Million Award to Revitalize American Steelmaking,https://www.energy.gov/articles/energy-department-announces-500-million-award-revitalize-american-steelmaking,,2026-08-21 date level,,,,2026-08-21 date level,,Construction expected in the weeks after 2026-08-21; no exact start date stated,,,A prior industrial-demonstration project existed without the revised current award state.,DOE announced a $500 million award supporting a revised steelmaking project.,"The release alone does not prove a newly obligated amount, outlay, construction start, furnace completion, output or realized jobs.",The same DOE award action and state were already captured from DOE's official X publisher in the Aug. 21 vault event before this campaign; the later energy.gov URL is additional provenance.,duplicate,exact_duplicate_reject,pre-campaign Aug. 21 weekly ownership,2026-08-23 10:21:17.132404 EDT W4-EL-OBJ-011,4,fg-132,U.S. Department of Energy Office of Critical Minerals and Energy Innovation,Department of Energy,project-selection announcement,operations_organization_funding_data,DOE-CMEI-CRITICAL-MINERALS-9-SELECTIONS-2026-08-18,DOE's Office of Critical Minerals and Energy Innovation Announces $162 Million to Accelerate American Critical Minerals Processing,https://www.energy.gov/cmei/articles/does-office-critical-minerals-and-energy-innovation-announces-162-million-accelerate,,2026-08-18 date level,,,,2026-08-18 date level,,Award negotiations after 2026-08-18; no completion clock stated,,,The nine projects had not entered announced selection-for-negotiation state under this opportunity.,DOE selected nine projects for award negotiations.,"Selection is not an award, commitment, obligation, outlay, construction start, commissioned capacity or production; DOE may rescind or change amounts.","Full-workspace exact title, stable-ID and URL dedup was run on 2026-08-23 against governed pre-campaign research, July 25 and Aug. 1 whole-site work, weekly deltas through Aug. 21 and topical packages; no exact prior object was found.",time_novel,retain_as_plotline_support_only,existing Energy plotline support,2026-08-23 10:21:17.132404 EDT W4-EL-OBJ-019,4,fg-132,U.S. Department of Energy Office of Nuclear Energy,Department of Energy,Civil Nuclear Credit payment,operations_organization_funding_data;publications_libraries_foia_archives,DOE-CNC-DIABLO-CANYON-PAYMENT-1-2026-08-14,Department of Energy Awards First Civil Nuclear Credit Payment to California Power Plant,https://www.energy.gov/ne/articles/department-energy-awards-first-civil-nuclear-credit-payment-california-power-plant,https://www.energy.gov/ne/civil-nuclear-credit-award-cycle-1,2026-08-14 date level,,,,2026-08-14 date level,,,2026-08-14 initial Unit 1 credit issued,,PG&E had a finalized 2024 credit agreement but had not received the first public CNC payment for Diablo Canyon Unit 1.,DOE issued the initial $271 million credit after stated conditions and environmental review were met.,"The payment supports an already-operating plant; it does not prove future Unit 2 credits, individual expenditures, reliability outcomes or operation through the full license term.","Full-workspace exact title, stable-ID and URL dedup was run on 2026-08-23 against governed pre-campaign research, July 25 and Aug. 1 whole-site work, weekly deltas through Aug. 21 and topical packages; no exact prior object was found.",time_novel,hold_for_plotline_relevance_review,Services D queue review only,2026-08-23 10:21:17.132404 EDT W4-EL-OBJ-012,4,fg-132,U.S. Department of Energy,Department of Energy,project-selection announcement,operations_organization_funding_data,DOE-CRITICAL-MINERALS-BATTERY-7-SELECTIONS-2026-08-20,Energy Department Announces $500 Million to Secure America's Critical Mineral and Battery Supply Chains,https://www.energy.gov/articles/energy-department-announces-500-million-secure-americas-critical-mineral-and-battery,,2026-08-20 date level,,,,2026-08-20 date level,,Award negotiations after 2026-08-20; no completion clock stated,,,The seven projects had not entered announced selection-for-negotiation state under this opportunity.,DOE selected seven projects for award negotiations.,"Selection is not an award, commitment, obligation, outlay, construction start, commissioned capacity or production; DOE may rescind or change amounts.","Full-workspace exact title, stable-ID and URL dedup was run on 2026-08-23 against governed pre-campaign research, July 25 and Aug. 1 whole-site work, weekly deltas through Aug. 21 and topical packages; no exact prior object was found.",time_novel,retain_as_plotline_support_only,existing Energy plotline support,2026-08-23 10:21:17.132404 EDT W4-EL-OBJ-007,4,fg-132,U.S. Department of Energy Office of Energy Dominance Financing,Department of Energy,loan-close announcement,operations_organization_funding_data,DOE-EDF-AMANECER-PR-LOAN-CLOSE-2026-08-05,DOE's Office of Energy Dominance Financing closes loan to strengthen Puerto Rico's grid,https://www.energy.gov/edf/articles/does-office-energy-dominance-financing-closes-loan-strengthen-puerto-ricos-grid,,2026-08-05 date level,,,,2026-08-05 date level,,,,,The Amanecer Puerto Rico financing was not publicly in closed-loan state.,DOE reported closing a $489.4 million loan for a planned 220 MW battery-storage program and possible future gas generation.,"The release does not prove disbursement, obligation timing, construction, installation, commissioning, operating capacity or future gas generation.",Exact source URL and financing state were covered by the 2026-08-08 weekly delta.,duplicate,exact_duplicate_reject,pre-campaign weekly-delta ownership,2026-08-23 10:21:17.132404 EDT W4-EL-OBJ-021,4,fg-132,U.S. Department of Energy Office of Nuclear Energy,Department of Energy,supplemental environmental impact statement,legal_regulatory_instruments;publications_libraries_foia_archives,DOE-EIS-0555-S1,DOE/EIS-0555-S1: Supplemental Environmental Impact Statement,https://www.energy.gov/nepa/articles/doeeis-0555-s1-supplemental-environmental-impact-statement-august-2026,https://www.federalregister.gov/documents/2026/08/14/2026-16629/environmental-impact-statements-notice-of-availability,,,,2026-08-13 date level,2026-08-14 date level,,,,,The supplemental environmental review for the amended Diablo Canyon credit decision was not public in final form.,DOE published the supplemental EIS and EPA published the Aug. 14 notice of availability.,"The SEIS is analysis and legal provenance, not a payment, operating result or independent project approval.","Full-workspace exact title, stable-ID and URL dedup was run on 2026-08-23 against governed pre-campaign research, July 25 and Aug. 1 whole-site work, weekly deltas through Aug. 21 and topical packages; no exact prior object was found.",time_novel,retain_as_plotline_support_only,supporting evidence for existing Energy/nuclear plotline,2026-08-23 10:21:17.132404 EDT W4-EL-OBJ-020,4,fg-132,U.S. Department of Energy Office of Nuclear Energy,Department of Energy,amended NEPA record of decision,legal_regulatory_instruments;publications_libraries_foia_archives,DOE-EIS-0555-S1-AMENDED-ROD,DOE/EIS-0555-S1: Amended Record of Decision,https://www.energy.gov/nepa/articles/doeeis-0555-s1-amended-record-decision-july-2026,,,,,,2026-08-14 date level,2026-08-14 date level,,,,The existing Diablo Canyon credit decision had not incorporated the supplemental environmental record for the extended-license state.,DOE issued an amended record of decision supporting the Civil Nuclear Credit action.,"The ROD is a legal decision record; it does not itself transfer funds, operate the plant, establish Unit 2 audit completion or prove future performance.","Full-workspace exact title, stable-ID and URL dedup was run on 2026-08-23 against governed pre-campaign research, July 25 and Aug. 1 whole-site work, weekly deltas through Aug. 21 and topical packages; no exact prior object was found.",time_novel,retain_as_plotline_support_only,supporting legal provenance within the Diablo Canyon payment unit,2026-08-23 10:21:17.132404 EDT W4-EL-OBJ-010,4,fg-132,U.S. Department of Energy,Department of Energy,laboratory operating-directive announcement,operations_organization_funding_data,DOE-LAB-OPERATING-DIRECTIVES-2026-08-13,Energy Department Modernizes National Laboratory Operations to Strengthen America's Scientific Enterprise,https://www.energy.gov/articles/energy-department-modernizes-national-laboratory-operations-strengthen-americas-scientific,,2026-08-13 date level,,,,2026-08-13 date level,,,,,"DOE's prior laboratory directives governed daily laboratory, plant and site operations.","DOE announced updated operating directives, but the release did not enumerate exact directive IDs or versions.","The announcement is not sufficient to claim the content, effective scope, contractor adoption or operating consequence of any unnamed directive.","Full-workspace exact title, stable-ID and URL dedup was run on 2026-08-23 against governed pre-campaign research, July 25 and Aug. 1 whole-site work, weekly deltas through Aug. 21 and topical packages; no exact prior object was found.",time_novel,retain_as_plotline_support_only,existing Federal Science Operating System support,2026-08-23 10:21:17.132404 EDT W4-EL-OBJ-008,4,fg-132,U.S. Department of Energy Office of Nuclear Energy,Department of Energy,reactor criticality announcement,operations_organization_funding_data;publications_libraries_foia_archives,DOE-NE-GROVES-CRITICALITY-2026-08-05,Office of Nuclear Energy Celebrates Fifth Advanced Reactor Criticality,https://www.energy.gov/ne/articles/office-nuclear-energy-celebrates-fifth-advanced-reactor-criticality,,2026-08-06 date level,,,,2026-08-06 date level,,,"2026-08-05 night, as reported by DOE on 2026-08-06",,Oklo's Groves isotope test reactor had not reached the reported criticality milestone.,DOE reported that the company-operated test reactor achieved criticality under the DOE Reactor Pilot Program.,"Criticality does not prove sustained operation, electricity or isotope production, NRC commercial licensing, product delivery or a commercial follow-on.",Exact source URL and criticality state were covered by the 2026-08-08 weekly delta.,duplicate,exact_duplicate_reject,pre-campaign weekly-delta ownership,2026-08-23 10:21:17.132404 EDT
Section 5 of 11
W4-EL-OBJ-009,4,fg-132,U.S. Department of Energy,Department of Energy,transmission-corridor designation decision,legal_regulatory_instruments;operations_organization_funding_data,DOE-NIETC-CANCELLATION-2026-08-12,Energy Secretary Announces Cancellation of Three Proposed National Interest Electric Transmission Corridors,https://www.energy.gov/articles/energy-secretary-announces-cancellation-three-proposed-national-interest-electric,,2026-08-12 date level,2026-08-12 date level,,,2026-08-12 date level,,,,,Three proposed NIETCs selected in December 2024 remained under federal designation review.,DOE ended that process with no corridor designated while leaving future designations legally possible.,"The decision does not cancel transmission projects, permits, rights-of-way or any future corridor process.","Full-workspace exact title, stable-ID and URL dedup was run on 2026-08-23 against governed pre-campaign research, July 25 and Aug. 1 whole-site work, weekly deltas through Aug. 21 and topical packages; no exact prior object was found.",time_novel,hold_for_plotline_relevance_review,Services D queue review only,2026-08-23 10:21:17.132404 EDT W4-EL-OBJ-018,4,fg-132,U.S. Department of Energy Office of Inspector General,Department of Energy,audit report,oversight_courts_congress,DOE-OIG-26-44,The Department of Energy's Payment Integrity Reporting in the Fiscal Year 2025 Agency Financial Report,https://www.energy.gov/ig/articles/department-energys-payment-integrity-reporting-fiscal-year-2025-agency-financial-report,,,2026-08-05 date level,,,2026-08-11 date level,,,FY2025 reporting period,,DOE's FY2025 payment-integrity compliance and control findings were not in the governed reservoir.,"OIG reported compliance, a 0.08 percent improper/unknown-payment rate and four internal-control deficiencies with recommendations.","The report does not prove fraud, recovery, completed remediation or current-year recurrence; amounts do not create promotion relevance.","Full-workspace exact title, stable-ID and URL dedup was run on 2026-08-23 against governed pre-campaign research, July 25 and Aug. 1 whole-site work, weekly deltas through Aug. 21 and topical packages; no exact prior object was found.",time_novel,retain_as_plotline_support_only,existing watchdog subplot support,2026-08-23 10:21:17.132404 EDT W4-EL-OBJ-001,4,fg-132,U.S. Department of Energy,Department of Energy,Federal Power Act section 202(c) emergency order,legal_regulatory_instruments;operations_organization_funding_data,DOE-ORDER-202-25-1E,Puerto Rico Electric Power Authority Order No. 202-25-1E Regarding Specified Generation Resources,https://www.energy.gov/documents/doe-order-no-202-25-1e,https://www.energy.gov/ceser/federal-power-act-section-202c-puerto-rico-electric-power-authority-prepa,,2026-08-07 date level,,,2026-08-07 date level,2026-08-10 through 2026-11-07,Biweekly Wednesday reporting during the 2026-08-10 through 2026-11-07 order period,,,"Order 202-25-1D authority was scheduled to end on August 9, 2026.",DOE renewed bounded emergency authority requiring listed generation resources to operate only as needed for reliability.,"The order proves authority and reporting duties, not actual unit dispatch, generation, avoided outages, repairs or environmental relief use.","Full-workspace exact title, stable-ID and URL dedup was run on 2026-08-23 against governed pre-campaign research, July 25 and Aug. 1 whole-site work, weekly deltas through Aug. 21 and topical packages; no exact prior object was found.",time_novel,hold_for_plotline_relevance_review,Services D queue review only,2026-08-23 10:21:17.132404 EDT W4-EL-OBJ-002,4,fg-132,U.S. Department of Energy,Department of Energy,Federal Power Act section 202(c) emergency order,legal_regulatory_instruments;operations_organization_funding_data,DOE-ORDER-202-25-2E,Puerto Rico Electric Power Authority Order No. 202-25-2E Regarding Transmission and Distribution Facilities,https://www.energy.gov/documents/doe-order-no-202-25-2e,https://www.energy.gov/ceser/federal-power-act-section-202c-puerto-rico-electric-power-authority-prepa,,2026-08-07 date level,,,2026-08-07 date level,2026-08-10 through 2026-11-07,Additional 400-mile work requirement through 2026-11-07 with biweekly reporting,,,Prior vegetation-management and asset-availability authority was approaching its August 9 end while prior directives remained incomplete.,DOE renewed the order for 90 days and directed another 400 miles of vegetation management plus asset-management and biweekly reporting duties.,"The order does not prove any post-order mile was cleared, a facility was repaired, line ratings improved or customer interruptions fell.","Full-workspace exact title, stable-ID and URL dedup was run on 2026-08-23 against governed pre-campaign research, July 25 and Aug. 1 whole-site work, weekly deltas through Aug. 21 and topical packages; no exact prior object was found.",time_novel,hold_for_plotline_relevance_review,Services D queue review only,2026-08-23 10:21:17.132404 EDT W4-EL-OBJ-004,4,fg-132,U.S. Department of Energy,Department of Energy,Federal Power Act section 202(c) emergency order,legal_regulatory_instruments;operations_organization_funding_data,DOE-ORDER-202-26-25A,Wagner Unit 4 continued-availability order,https://www.energy.gov/articles/energy-secretary-acts-protect-mid-atlantic-grid,https://www.energy.gov/ceser/federal-power-act-section-202c-pjm-interconnection-llc-pjm-order-no-202-26-25,2026-08-19 date level,2026-08-19 date level,,,2026-08-19 date level,2026-08-20 through 2026-11-17,,,,The prior Wagner emergency period was approaching its end.,DOE extended bounded emergency availability for another 90-day period.,"The order does not establish continuous operation, dispatch, generation, avoided outages, cost allocation or emissions outcome.",Exact source URL and order were already normalized in the 2026-08-20 weekly delta before this campaign.,duplicate,exact_duplicate_reject,pre-campaign weekly-delta ownership,2026-08-23 10:21:17.132404 EDT W4-EL-OBJ-006,4,fg-132,U.S. Department of Energy,Department of Energy,Federal Power Act section 202(c) emergency order,legal_regulatory_instruments;operations_organization_funding_data,DOE-ORDER-202-26-38,Guam Power Authority Order No. 202-26-38,https://www.energy.gov/documents/doe-order-no-202-26-38,https://www.energy.gov/ceser/federal-power-act-section-202c-guam-power-authority-gpa-order-no-202-26-38,,2026-08-05 date level,,,2026-08-05 date level,2026-08-05 20:00 EDT / 2026-08-06 10:00 ChST through 2026-11-04 23:59 ChST,,,,Guam Power Authority lacked the August emergency dispatch authority for the specified Ukudu resources.,DOE placed reliability-limited dispatch authority and daily reporting into effect through November 4 Guam time.,"The order does not prove dispatch, generation, repair completion, emissions relief use or an avoided blackout.",Exact order and controlling registry page were covered by the 2026-08-08 weekly delta.,duplicate,exact_duplicate_reject,pre-campaign weekly-delta ownership,2026-08-23 10:21:17.132404 EDT W4-EL-OBJ-005,4,fg-132,U.S. Department of Energy,Department of Energy,Federal Power Act section 202(c) emergency order,legal_regulatory_instruments;operations_organization_funding_data,DOE-ORDER-202-26-39,J.H. Campbell Unit 3 continued-availability order,https://www.energy.gov/documents/doe-order-no-202-26-39,https://www.energy.gov/ceser/2026-doe-202c-orders,2026-08-14 date level,2026-08-14 date level,,,2026-08-14 date level,2026-08-17 through 2026-11-14,,,,The preceding Campbell emergency period was approaching its end.,DOE extended bounded emergency availability for another 90-day period.,"The order does not establish continuous operation, dispatch, generation, avoided outages, cost allocation or emissions outcome.",Exact source URL and order were already normalized in the 2026-08-20 weekly delta before this campaign.,duplicate,exact_duplicate_reject,pre-campaign weekly-delta ownership,2026-08-23 10:21:17.132404 EDT W4-EL-OBJ-003,4,fg-132,U.S. Department of Energy,Department of Energy,Federal Power Act section 202(c) emergency order,legal_regulatory_instruments;operations_organization_funding_data,DOE-ORDER-202-26-40,PJM Interconnection Order No. 202-26-40 regarding Eddystone Units 3 and 4,https://www.energy.gov/documents/doe-order-no-202-26-40,https://www.energy.gov/ceser/federal-power-act-section-202c-pjm-interconnection-llc-pjm-order-no-202-26-40,2026-08-21 date level,2026-08-21 date level,,,2026-08-21 date level,2026-08-23 through 2026-11-20,Measures report due 2026-09-08; daily notices during the order period,,,Eddystone Units 3 and 4 lacked this successor federal emergency-availability order.,DOE ordered the units kept available for PJM reliability and imposed notices plus a September measures report.,"Availability and economic-dispatch authority do not prove either unit ran, produced MWh, prevented a shortfall or obtained capacity-resource status.","Full-workspace exact title, stable-ID and URL dedup was run on 2026-08-23 against governed pre-campaign research, July 25 and Aug. 1 whole-site work, weekly deltas through Aug. 21 and topical packages; no exact prior object was found.",time_novel,hold_for_plotline_relevance_review,Services D queue review only,2026-08-23 10:21:17.132404 EDT W4-EL-OBJ-023,4,fg-133,U.S. Government Accountability Office,Department of Energy / National Nuclear Security Administration,oversight report,oversight_courts_congress,GAO-26-107385,Nuclear Weapons: NNSA Should Improve Its Cost Estimates and Consider the Affordability of Enriched Uranium Plans,https://www.gao.gov/products/gao-26-107385,,,,,,2026-08-20 date level,,,,,NNSA's enriched-uranium affordability and estimate deficiencies had not been published in this GAO report.,"GAO published its cost estimate, affordability and missing-analysis findings with five open recommendations.",The long-range estimate is not an obligation or outlay; open recommendations are not completed corrective action.,Exact GAO report number and URL were captured in the 2026-08-21 weekly package.,duplicate,exact_duplicate_reject,pre-campaign Aug. 21 weekly ownership,2026-08-23 10:21:17.132404 EDT W4-EL-OBJ-022,4,fg-133,National Nuclear Security Administration,Department of Energy / National Nuclear Security Administration,M&O contract option announcement,operations_organization_funding_data,NNSA-SRNS-MO-OPTION-THROUGH-2027-09-30,"NNSA exercises option with Savannah River Nuclear Solutions, LLC for management and operation",https://www.energy.gov/nnsa/articles/nnsa-exercises-option-savannah-river-nuclear-solutions-llc-management-and-operation,,2026-08-10 date level,,,,2026-08-10 date level,,,Performance period through 2027-09-30,,The remaining Savannah River Nuclear Solutions option had not been exercised while NNSA evaluated replacement-contract proposals.,"NNSA exercised the option, preserving performance through September 30, 2027, with an estimated $2.3 billion value.","This is continuity under an option, not a successor award, obligation schedule, new facility, output result or proof of contractor performance.","Full-workspace exact title, stable-ID and URL dedup was run on 2026-08-23 against governed pre-campaign research, July 25 and Aug. 1 whole-site work, weekly deltas through Aug. 21 and topical packages; no exact prior object was found.",time_novel,retain_as_plotline_support_only,existing NNSA operating-watch support,2026-08-23 10:21:17.132404 EDT
Section 6 of 11
W4-EL-OBJ-025,4,fg-135,U.S. Department of Energy Office of Inspector General,Sandia National Labs,incurred-cost audit report,oversight_courts_congress,DOE-OIG-26-45,"National Technology & Engineering Solutions of Sandia, LLC's Statement of Costs Incurred and Claimed",https://www.energy.gov/ig/articles/national-technology-engineering-solutions-sandia-llcs-statement-costs-incurred-and,,,,,,2026-08-11 date level,,,FY2019 through FY2020 audit period,2022 resolution of the report's material noncompliance,Sandia's FY2019-FY2020 incurred-cost and control findings had not been published in this report.,"OIG reported no material unallowable costs, one earlier-resolved material noncompliance, control deficiencies and three recommendations.","The report does not prove current misconduct, current loss, repeat noncompliance or completed implementation of every recommendation.","Full-workspace exact title, stable-ID and URL dedup was run on 2026-08-23 against governed pre-campaign research, July 25 and Aug. 1 whole-site work, weekly deltas through Aug. 21 and topical packages; no exact prior object was found.",time_novel,retain_as_plotline_support_only,existing watchdog subplot support,2026-08-23 10:21:17.132404 EDT W4-EL-OBJ-024,4,fg-135,Sandia National Laboratories,Sandia National Labs,secure-transporter test retrospective,publications_libraries_foia_archives,SANDIA-MOBILE-GUARDIAN-CRASH-SERIES-2025,New Mobile Guardian Transporter undergoes final crash test,https://newsreleases.sandia.gov/secure-transportation/,,,,,,2026-08-17 date level,,,Fall 2025 second and final full-scale crash test,,The full-scale Mobile Guardian Transporter crash series had not completed.,Sandia reported that the second and final full-scale crash test occurred in fall 2025 and the results now inform qualification and final design.,"The Aug. 17 publication is current, but the test is historical; the page does not prove qualification, production, fielding, acceptance or transport operations.","Full-workspace exact title, stable-ID and URL dedup was run on 2026-08-23 against governed pre-campaign research, July 25 and Aug. 1 whole-site work, weekly deltas through Aug. 21 and topical packages; no exact prior object was found.",reservoir_new_historical,retain_as_plotline_support_only,existing Military/defense-tech support,2026-08-23 10:21:17.132404 EDT W4-EL-OBJ-026,4,fg-139,Fermi National Accelerator Laboratory,Fermilab,research-selection feature,operations_organization_funding_data;publications_libraries_foia_archives,FERMILAB-GENESIS-RESONANCE-CONTROL-FEATURE-2026-08-20,DOE selects Fermilab-led AI initiative to advance particle accelerator performance,https://news.fnal.gov/2026/08/doe-selects-fermilab-led-ai-initiative-to-advance-particle-accelerator-performance/,,,,,,2026-08-20 15:00 UTC,,,,,DOE had already selected the underlying Fermilab Genesis project in July; this native lab feature was not yet public.,Fermilab published a detailed restatement of the existing selection and future AI resonance-control research aims.,"The current publisher page is not a new DOE selection, award, obligation, deployed AI controller, power saving or operating result.",The underlying DOE Genesis selection was public on 2026-07-22; this later lab feature adds no new selection or operating state.,time_novel,routine_or_duplicate_reject,current restatement; no standalone review,2026-08-23 10:21:17.132404 EDT W4-EL-OBJ-027,4,fg-140,Pacific Northwest National Laboratory,Pacific Northwest National Lab,institutional capability launch,operations_organization_funding_data;publications_libraries_foia_archives,PNNL-CENTER-ROBOTICS-AUTONOMY-2026,Inside PNNL's Lab-Wide Push for Trustworthy Autonomous Science,https://www.pnnl.gov/news-media/inside-pnnls-lab-wide-push-trustworthy-autonomous-science,,,,,,2026-08-05 date level,,,Center launched by 2026-08-05 publication,,PNNL lacked the announced lab-wide Center for Robotics and Autonomy and integrated ARCADIA autonomy infrastructure.,"PNNL launched the Center, described active partner infrastructure and reported more than $5 million in annual internal investment.","This is a PNNL operating-capability claim, not a DOE rule, external award, universally autonomous lab, independently validated system or guaranteed five-year outcome.","Full-workspace exact title, stable-ID and URL dedup was run on 2026-08-23 against governed pre-campaign research, July 25 and Aug. 1 whole-site work, weekly deltas through Aug. 21 and topical packages; no exact prior object was found.",time_novel,retain_as_plotline_support_only,existing AI build-out support; internal lab launch demoted by close gate,2026-08-23 10:21:17.132404 EDT W4-EL-OBJ-031,4,fg-144,Oak Ridge National Laboratory / Kairos Power,Oak Ridge National Lab,memorandum-of-understanding announcement,operations_organization_funding_data;publications_libraries_foia_archives,KAIROS-ORNL-NUCAMP-MOU-2026-08-21,"Kairos Power announces new collaboration to advance nuclear manufacturing, construction and workforce development in East Tennessee",https://www.ornl.gov/news/kairos-power-announces-new-collaboration-advance-nuclear-manufacturing-construction-and,,,2026-08-21 date level,,,2026-08-21 date level,,Initial 12-month exploration phase beginning in 2026-08,,,NuCAMP lacked the signed multi-party exploration framework.,"Kairos and partners signed an MOU for a 12-month exploration phase on nuclear manufacturing, construction and workforce methods.","The exploratory MOU is not a DOE award, procurement, code qualification, manufacturing line, construction project or deployed reactor capability.","Full-workspace exact title, stable-ID and URL dedup was run on 2026-08-23 against governed pre-campaign research, July 25 and Aug. 1 whole-site work, weekly deltas through Aug. 21 and topical packages; no exact prior object was found.",time_novel,retain_as_plotline_support_only,existing Energy/nuclear support,2026-08-23 10:21:17.132404 EDT W4-EL-OBJ-030,4,fg-144,Oak Ridge National Laboratory,Oak Ridge National Lab,interlaboratory research agreement announcement,operations_organization_funding_data;publications_libraries_foia_archives,ORNL-INL-WIRE-ARC-NUCLEAR-QUALIFICATION-2026-08-19,National laboratory research collaboration focuses on accelerated qualification of critical nuclear components,https://www.ornl.gov/news/national-laboratory-research-collaboration-focuses-accelerated-qualification-critical-nuclear,,2026-08-19 date level,,,,2026-08-21 date level,,,Small research vessel printed in 2026-07,,ORNL and INL lacked this announced collaboration for wire-arc additive qualification of nuclear pressure-vessel components.,The laboratories announced the agreement; ORNL also reported a small vessel printed in July as research evidence.,"The agreement and July research article do not prove code qualification, a commercial pressure vessel, regulator acceptance, deployment or operating reactor use.","Full-workspace exact title, stable-ID and URL dedup was run on 2026-08-23 against governed pre-campaign research, July 25 and Aug. 1 whole-site work, weekly deltas through Aug. 21 and topical packages; no exact prior object was found.",time_novel,retain_as_plotline_support_only,existing Energy/nuclear support,2026-08-23 10:21:17.132404 EDT W4-EL-OBJ-029,4,fg-144,Oak Ridge National Laboratory,Oak Ridge National Lab,planned fusion test-facility announcement,operations_organization_funding_data;publications_libraries_foia_archives,ORNL-KYOTO-UNITY-3-2026-08-11,"ORNL, Kyoto Fusioneering to develop fusion technology test facility in East Tennessee",https://www.ornl.gov/news/ornl-kyoto-fusioneering-develop-fusion-technology-test-facility-east-tennessee,,,,,,2026-08-11 date level,,Facility build and headquarters relocation planned after 2026-08-11; no exact completion clock stated,,,UNITY-3 lacked the announced East Tennessee ORNL/Kyoto Fusioneering facility-development state.,ORNL reported a DOE funding commitment and partner plans to help build and operate UNITY-3 and relocate a U.S. headquarters.,"The ORNL page is not the underlying award instrument and does not prove obligation, site construction, commissioning, operation or completed relocation.","Full-workspace exact title, stable-ID and URL dedup was run on 2026-08-23 against governed pre-campaign research, July 25 and Aug. 1 whole-site work, weekly deltas through Aug. 21 and topical packages; no exact prior object was found.",time_novel,retain_as_plotline_support_only,existing Energy/nuclear support,2026-08-23 10:21:17.132404 EDT W4-EL-OBJ-028,4,fg-144,Oak Ridge National Laboratory,Oak Ridge National Lab,technology-license announcement,operations_organization_funding_data;publications_libraries_foia_archives,ORNL-TYPE-ONE-FUSION-PELLET-LICENSE-2026-08-05,"ORNL, Type One Energy advance fusion fuel cycle with innovative new technologies",https://www.ornl.gov/news/ornl-type-one-energy-advance-fusion-fuel-cycle-innovative-new-technologies,,,2026-08-05 date level,,,2026-08-05 date level,,,,,Type One Energy lacked a signed license to four ORNL cryogenic pellet-fueling inventions.,ORNL announced the signed license for future commercialization and fusion-fuel-cycle development.,"A lab technology license is not a DOE award, deployed fuel system, reactor completion, regulatory approval or commercial operation.","Full-workspace exact title, stable-ID and URL dedup was run on 2026-08-23 against governed pre-campaign research, July 25 and Aug. 1 whole-site work, weekly deltas through Aug. 21 and topical packages; no exact prior object was found.",time_novel,retain_as_plotline_support_only,existing Energy/nuclear support,2026-08-23 10:21:17.132404 EDT W4-EL-OBJ-032,4,fg-144,Oak Ridge National Laboratory,Oak Ridge National Lab,isotope-production resumption announcement,operations_organization_funding_data;publications_libraries_foia_archives,ORNL-W188-RE188-GENERATOR-RESUMPTION-2026,ORNL's revived rhenium isotope generators answer call for cancer therapies,https://www.ornl.gov/news/ornls-revived-rhenium-isotope-generators-answer-call-cancer-therapies,,,,,,2026-08-10 date level,,,Production resumed and one generator delivered by 2026-08-10 publication,,ORNL had not produced W-188/Re-188 generators since 2011.,"ORNL reported resumed production and delivery of an improved generator to Vanderbilt, with broader distribution still future.","One delivered research generator does not prove broad distribution, clinical use, treatment outcomes, sustained production volume or FDA status.","Full-workspace exact title, stable-ID and URL dedup was run on 2026-08-23 against governed pre-campaign research, July 25 and Aug. 1 whole-site work, weekly deltas through Aug. 21 and topical packages; no exact prior object was found.",time_novel,retain_as_plotline_support_only,existing Health/Energy support,2026-08-23 10:21:17.132404 EDT W4-EL-OBJ-034,4,fg-145,Federal Energy Regulatory Commission,Federal Energy Regulatory Commission,section 206 proceeding notice,legal_regulatory_instruments,2026-16418,NorthWestern Corporation; Notice of Institution of Section 206 Proceeding and Refund Effective Date,https://www.federalregister.gov/documents/2026/08/12/2026-16418/northwestern-corporation-notice-of-institution-of-section-206-proceeding-and-refund-effective-date,https://public-inspection.federalregister.gov/2026-16418.pdf,,,,2026-08-11 08:45 EDT,2026-08-12 date level,,,,,NorthWestern's rate schedule had not entered this section 206 proceeding/refund-date notice state.,FERC instituted the proceeding and established the stated refund effective date.,"The notice does not adjudicate the rate, quantify refunds, order payment or prove customer recovery.",Exact Federal Register document was covered by the 2026-08-13 weekly delta.,duplicate,exact_duplicate_reject,pre-campaign Aug. 13 weekly ownership,2026-08-23 10:21:17.132404 EDT
Section 7 of 11
W4-EL-OBJ-033,4,fg-145,Federal Energy Regulatory Commission,Federal Energy Regulatory Commission,Federal Register notice,legal_regulatory_instruments,2026-16522,PJM Governance and Stakeholder Reforms; Notice Regarding Dispute Resolution Procedures,https://www.federalregister.gov/documents/2026/08/13/2026-16522/pjm-governance-and-stakeholder-reforms-notice-regarding-dispute-resolution-procedures,https://public-inspection.federalregister.gov/2026-16522.pdf,,,,2026-08-12 08:45 EDT,2026-08-13 date level,,,,,The PJM governance proceeding lacked the current dispute-resolution notice.,FERC published the notice in Docket AD26-7-000.,"The notice is procedural and does not prove a governance rule, tariff change, final dispute outcome or implementation.",No governed pre-campaign exact-object match was found; the procedural notice still fails the materiality gate.,time_novel,routine_or_duplicate_reject,procedural routine notice; no independent material state change,2026-08-23 10:21:17.132404 EDT W4-EL-OBJ-036,4,fg-145,Federal Energy Regulatory Commission,Federal Energy Regulatory Commission,environmental-scoping notice,legal_regulatory_instruments,2026-16739,Venture Global CP2 LNG expansion environmental scoping notice,https://www.federalregister.gov/documents/2026/08/17/2026-16739/venture-global-cp2-lng-llc-venture-global-cp-express-llc-notice-of-scoping-period-requesting,https://public-inspection.federalregister.gov/2026-16739.pdf,,,,2026-08-14 08:45 EDT,2026-08-17 date level,,,,,The CP2 expansion proposal lacked this federal environmental-scoping period and public-session notice.,FERC opened the scoping/comment process for the proposed expansion.,"Scoping is not approval, a final environmental determination, construction authorization, financing or operation.","Full-workspace exact title, stable-ID and URL dedup was run on 2026-08-23 against governed pre-campaign research, July 25 and Aug. 1 whole-site work, weekly deltas through Aug. 21 and topical packages; no exact prior object was found.",time_novel,retain_as_plotline_support_only,existing Energy legal-watch support,2026-08-23 10:21:17.132404 EDT W4-EL-OBJ-035,4,fg-145,Federal Energy Regulatory Commission,Federal Energy Regulatory Commission,environmental-review schedule notice,legal_regulatory_instruments,2026-16922,Rio Grande LNG Capacity Amendment environmental assessment schedule,https://www.federalregister.gov/documents/2026/08/19/2026-16922/rio-grande-lng-llc-rio-grande-lng-train-4-llc-rio-grande-lng-train-5-llc-notice-of-schedule-for-the,https://public-inspection.federalregister.gov/2026-16922.pdf,,,,2026-08-18 08:45 EDT,2026-08-19 date level,,,,,The capacity-amendment docket lacked this environmental-assessment schedule.,FERC published a schedule for preparation of an environmental assessment.,"A schedule is not an authorization, environmental conclusion, construction approval, completed train or operating capacity.","Full-workspace exact title, stable-ID and URL dedup was run on 2026-08-23 against governed pre-campaign research, July 25 and Aug. 1 whole-site work, weekly deltas through Aug. 21 and topical packages; no exact prior object was found.",time_novel,retain_as_plotline_support_only,existing Energy legal-watch support,2026-08-23 10:21:17.132404 EDT W4-EL-OBJ-037,4,fg-147,Bonneville Power Administration,Bonneville · WAPA · SEPA · SWPA,quarterly financial forecast,operations_organization_funding_data;publications_libraries_foia_archives,BPA-FY2026-Q3-OFFICIAL-FINANCIAL-FORECAST,BPA releases its third official financial forecast for fiscal year 2026,https://www.bpa.gov/about/newsroom/news-articles/20260813-bpa-releases-its-third-official-financial-forecast-for-fiscal-year-2026,,,,,,2026-08-13 date level,,,FY2026 third-quarter forecast,,BPA's Q2 forecast was $15 million below its $509 million net-revenue target.,BPA's Q3 forecast moved to $49 million below target and described transmission deferrals plus a 65-to-97-day cash range and surcharge risk.,"This is a forecast, not final FY2026 performance, an imposed surcharge, a final rate, default, construction cancellation or realized liquidity event.","Full-workspace exact title, stable-ID and URL dedup was run on 2026-08-23 against governed pre-campaign research, July 25 and Aug. 1 whole-site work, weekly deltas through Aug. 21 and topical packages; no exact prior object was found.",time_novel,retain_as_plotline_support_only,existing Energy/economy watch support,2026-08-23 10:21:17.132404 EDT W4-EL-OBJ-038,4,fg-147,Southeastern Power Administration,Bonneville · WAPA · SEPA · SWPA,proposed rate adjustment state,legal_regulatory_instruments;operations_organization_funding_data,SEPA-JIM-WOODRUFF-PROPOSED-RATE-FY2027-2031,Jim Woodruff Proposed Rate Adjustment,https://www.energy.gov/sepa/jim-woodruff-proposed-rate-adjustment,,,,Comments due 2026-08-27,,,Proposed period 2026-10-01 through 2031-09-30,,,,The Jim Woodruff project remained under its prior rate framework.,"SEPA's current page records a proposed five-year rate period, an administrative revision after the forum and an extended August 27 comment deadline.","The proposal is not effective, approved or billed; the page exposes no exact public clock for the administrative revision.","Full-workspace exact title, stable-ID and URL dedup was run on 2026-08-23 against governed pre-campaign research, July 25 and Aug. 1 whole-site work, weekly deltas through Aug. 21 and topical packages; no exact prior object was found.",state_recertification,retain_as_plotline_support_only,existing Energy rate-watch support,2026-08-23 10:21:17.132404 EDT W4-AG-OBJ-001,4,fg-149,U.S. Department of Agriculture; Department of Homeland Security,U.S. Department of Agriculture,interagency memorandum of understanding,operations_organization_funding_data,USDA-DHS-NWS-MOU-2026-08-10,USDA-DHS memorandum for New World screwworm border biosurveillance using UAS and AI,https://usda.azureedge.us/about-usda/news/press-releases/2026/08/11/secretary-rollins-visits-moore-air-base-announce-new-memorandum-understanding-between-usda-and-dhs,,2026-08-11 date-level USDA release,2026-08-10 date-level; release says the MOU was signed yesterday,,,,,2026-08-10 onward under the signed MOU,,,"USDA and DHS were cooperating on New World screwworm response, but this sweep had no exact signed instrument assigning the newly described joint UAS, AI, biosurveillance, information-sharing, training, and response roles.","USDA announced a signed USDA-DHS MOU formalizing joint UAS and AI screening, real-time biosurveillance and information sharing, joint response roles, training, and research against New World screwworm and other high-consequence animal and plant threats.","The official carrier summarizes the MOU; no signed full-text instrument was linked, so exact clauses, procurement, deployment locations, system selection, and observed interdiction effects remain unproved.",The Observatory already tracks New World screwworm detections and border-port response; no exact pre-campaign MOU match was found.,time_novel,promotion_review,Wave 4 agriculture review unit W4-AG-UNIT-001,2026-08-23 09:56:28.783092 EDT W4-AG-OBJ-012,4,fg-150,U.S. Forest Service,U.S. Department of Agriculture,proposed rule,legal_regulatory_instruments,2026-16965,Special Areas; Roadless Area Conservation; National Forest System Lands — proposed rescission,https://www.federalregister.gov/documents/2026/08/20/2026-16965/special-areas-roadless-area-conservation-national-forest-system-lands,,2026-08-18 Forest Service announcement,,2026-09-21 comment deadline,2026-08-19 date-level public-inspection carrier,2026-08-20,,,,,The 2001 Roadless Area Conservation Rule remains in effect for covered National Forest System lands.,The Forest Service proposed rescission and opened comments; existing land designations and restrictions remain until any final action.,"Proposal only: no final, effective, implementation, route, timber, mining, road, or land-management change is established.",No exact pre-campaign notice match was found.,time_novel,support_existing_plotline,C-only proposal/watch support,2026-08-23 09:56:28.783092 EDT W4-AG-OBJ-013,4,fg-150,U.S. Forest Service,U.S. Department of Agriculture,notice of intent / public-inspection carrier,legal_regulatory_instruments,2026-17211,Forest Service notice of intent to revise the Travel Management Rule,https://public-inspection.federalregister.gov/2026-17211.pdf,,2026-08-21 Forest Service announcement,,,2026-08-21 public inspection,2026-08-24 scheduled publication after lane cutoff,,,,,Existing travel-management designations and motor-vehicle-use maps remain in effect.,The Forest Service announced intent and exposed a public-inspection notice for a future Travel Management Rule revision; existing designations remain pending local or final action.,"At cutoff this was public-inspection/NOI state with August 24 scheduled publication; it is not a proposed text, final rule, effective change, local route change, or implementation.",No exact pre-campaign notice match was found; campaign snapshot provenance does not change novelty.,time_novel,support_existing_plotline,C-only proposal/watch support,2026-08-23 09:56:28.783092 EDT W4-AG-OBJ-002,4,fg-150,U.S. Forest Service,U.S. Forest Service,national delegation of authority,operations_organization_funding_data,FS-FIRE-AVIATION-DELEGATION-2026-08-11,Forest Service reassigns all fire and aviation authorities to the Deputy Chief,https://www.fs.usda.gov/inside-fs/leadership/delegation-fire-and-aviation-authorities,,2026-08-11 09:48:00 EDT publisher metadata,2026-08-11 date-level,,,,2026-08-11 effective immediately,2026-08-11 until rescinded or modified,2026-08-11 onward,,Fire and aviation authorities under Forest Service Manual 1230 and 5100 remained distributed under the prior Forest Service delegation structure.,"All Forest Service fire and aviation authorities were reassigned to the Deputy Chief for Fire and Aviation Management, Safety and Employee Wellbeing, including emergency declarations, expenditures, resources, communications, and supervision of Geographic Area Fire Directors; the authority is to transfer to a Chief Fire and Safety Officer during reorganization.",The Forest Service says this delegation does not itself change field structure or current-season posture; no separate implementation outcome is inferred.,The Observatory already tracks wildfire governance and administrative-state reorganization; no exact pre-campaign delegation match was found.,time_novel,promotion_review,Wave 4 agriculture review unit W4-AG-UNIT-002,2026-08-23 09:56:28.783092 EDT W4-AG-OBJ-003,4,fg-150,U.S. Forest Service,U.S. Forest Service,executed study contract,operations_organization_funding_data,FS-RTI-WILDFIRE-CONSOLIDATION-STUDY-2026,Forest Service awards RTI contract for federal wildland-fire consolidation feasibility study,https://www.fs.usda.gov/about-agency/newsroom/releases/us-forest-service-awards-fire-feasibility-study-contract-wildfire,,2026-08-04 16:00:00 EDT,2026-08-04 date-level award announcement,,,,,2026-08-04 contract award and study commissioning,,,Federal wildfire consolidation or separation remained a policy possibility without this commissioned feasibility-study award.,"The Forest Service awarded Research Triangle Institute a $1.156 million contract to study separating Forest Service wildland fire from land management or consolidating federal wildland-fire functions, with a final report expected February 15, 2027.","This is an executed study award, not a decision to separate or consolidate agencies; obligation, payment, report conclusions, adoption, and operating effects are not established.",The Observatory already contains wildfire-governance and consolidation authority context; no exact pre-campaign contract match was found.,time_novel,promotion_review,Wave 4 agriculture review unit W4-AG-UNIT-003,2026-08-23 09:56:28.783092 EDT
Section 8 of 11
W4-AG-OBJ-010,4,fg-151,Farm Service Agency,U.S. Department of Agriculture,ERP 2022 notice,legal_regulatory_instruments,2026-16661,Emergency Relief Program 2022 de minimis uninsured and NAP-loss retention notice,https://www.federalregister.gov/documents/2026/08/14/2026-16661/emergency-relief-program-2022,,,,2026-08-13 public inspection,2026-08-13,2026-08-14,,2026-08-14 implementation; certification due within 60 days where applicable,,,Certain ERP 2022 producers faced repayment under the prior uninsured/NAP linkage.,FSA allowed described producers with no more than a ten-percent de minimis uninsured or NAP-covered loss to retain ERP 2022 payments subject to certification.,Exact duplicate of governed Weekly Delta 2026-08-13; retained only for legal-census and dedup proof.,Exact pre-campaign match: Research Packages/Federal Government Weekly Delta 2026-08-13/waves/WAVE_4_PHYSICAL_PRODUCTION.md.,duplicate,reject_duplicate,none,2026-08-23 09:56:28.783092 EDT W4-AG-OBJ-004,4,fg-151,Farm Service Agency,U.S. Department of Agriculture,program deadline and documentation flexibility,operations_organization_funding_data,FSA-SDRP-2026-08-10,FSA extends Supplemental Disaster Relief Program deadline and accepts added quality-loss documentation,https://www.fsa.usda.gov/news-events/news/08-10-2026/usda-extends-supplemental-disaster-relief-program-application-deadline,,2026-08-10 date-level,,2026-09-30 application and missing-production-record deadline,,,,2026-08-10 documentation-flexibility implementation,,,SDRP Stages 1 and 2 had the prior application/documentation deadline and narrower described quality-loss proof path.,FSA extended the SDRP Stage 1 and 2 deadline to September 30 and described verifiable or reliable documentation and secondary-use or salvage-value treatment for quality losses.,"This changes program administration only; it does not prove applicant selection, award, obligation, payment, delivery, or loss recovery.",The Observatory tracks extreme-weather disaster relief generally; no exact pre-campaign release match was found.,time_novel,support_existing_plotline,C-only disaster-program administration support,2026-08-23 09:56:28.783092 EDT W4-AG-OBJ-016,4,fg-151,Farm Service Agency,U.S. Department of Agriculture; Commodity Credit Corporation,funding availability,operations_organization_funding_data,FSA-SPUR-2026,Strengthening Processing Options for U.S. Ranchers program opens,https://www.fsa.usda.gov/news-events/news/08-07-2026/usda-opens-strengthening-processing-us-ranchers-program-500-million,,2026-08-07 date-level,,2026-09-11 application deadline,,,,,2026-08-10 application intake opened,,SPUR applications were not open.,FSA opened applications for up to $500 million in CCC-funded SPUR assistance.,"Availability only: no applicant selection, award, obligation, payment, facility expansion, processing capacity, delivery, or market effect is established. The object is owned once by FSA; CCC coverage references it without cloning.",No exact pre-campaign SPUR match was found.,time_novel,support_existing_plotline,C-only funding-availability support,2026-08-23 09:56:28.783092 EDT W4-AG-OBJ-011,4,fg-152,USDA Rural Development,U.S. Department of Agriculture,funding notice,legal_regulatory_instruments,2026-15795,Powering Affordable Clean Energy Rural Alaska Village Grant Program availability,https://www.federalregister.gov/documents/2026/08/04/2026-15795/notice-of-funding-availability-for-the-powering-affordable-clean-energy-rural-alaska-village-grant,,,,,,2026-08-04,,2026-08-04 funding availability,,,PART Energy funding availability had not yet opened under the cited notice.,Rural Development published the PART Energy funding-availability notice.,"Exact pre-campaign August 4 full-surface match; availability is not selection, award, obligation, payment, construction, delivery, or effect.",Exact pre-campaign match: Physical Production Systems Full-Surface Wave 2026-08-04.,duplicate,reject_duplicate,none,2026-08-23 09:56:28.783092 EDT W4-AG-OBJ-014,4,fg-152,Rural Housing Service; Rural Business-Cooperative Service; Rural Utilities Service,U.S. Department of Agriculture,proposed rule,legal_regulatory_instruments,2026-16914,Rural Development proposed rescission of construction and repair regulations,https://www.federalregister.gov/documents/2026/08/19/2026-16914/rural-development-construction-and-repair,,,,2026-10-19 comment deadline,2026-08-18 date-level public inspection,2026-08-19,,,,,7 CFR part 1924 construction and repair requirements remain effective.,Rural Development proposed rescission and opened comments through October 19.,"Proposal only: no final, effective, loan-underwriting, energy-standard, construction, award, payment, delivery, or observed-effect change is established.",No exact pre-campaign notice match was found.,time_novel,support_existing_plotline,C-only proposal support,2026-08-23 09:56:28.783092 EDT W4-AG-OBJ-005,4,fg-152,USDA Rural Development,USDA Rural Development,senior-official oath,operations_organization_funding_data,RD-GLEN-SMITH-OATH-2026-08-21,Glen Smith sworn in as Under Secretary for Rural Development,https://www.rd.usda.gov/newsroom/news-release/glen-smith-sworn-under-secretary-rural-development,,2026-08-21 date-level; release says oath occurred that afternoon,,,,,,,2026-08-21 onward,,Glen Smith had been confirmed but had not yet assumed the Under Secretary role by oath in the governed reservoir.,USDA Rural Development announced Glen Smith took the oath and assumed the Under Secretary role.,"The oath establishes office assumption only; it does not prove a new policy, delegation, funding decision, reorganization, or operating effect.","The broader administrative-state plotline exists, but no exact pre-campaign oath match was found.",time_novel,support_existing_plotline,C-only leadership-state support,2026-08-23 09:56:28.783092 EDT W4-AG-OBJ-017,4,fg-153,Food and Nutrition Administration,U.S. Department of Agriculture,grant availability,operations_organization_funding_data,FNA-COLD-CHAIN-GRANTS-2026,FNA cold-chain infrastructure grant opportunity,https://www.fna.usda.gov/newsroom/usda-0109.26,,2026-08-17 date-level,,2026-10-01 application deadline,,,,,,,The described $7.5 million cold-chain opportunity was not open.,FNA announced application availability for cold-chain infrastructure grants.,"Availability only: no selection, award, obligation, payment, installation, delivery, or food-system effect is established.",No exact pre-campaign release match was found.,time_novel,support_existing_plotline,C-only funding-availability support,2026-08-23 09:56:28.783092 EDT W4-AG-OBJ-006,4,fg-153,Food and Nutrition Administration,U.S. Department of Agriculture,agency-wide reorganization and publisher-identity change,operations_organization_funding_data;publisher_root_feeds_sitemaps,FNA-REORGANIZATION-2026,Food and Nutrition Service becomes Food and Nutrition Administration and begins hub realignment,https://www.fna.usda.gov/reorganization,,2026-04-30 congressional notification; 2026-05-30 review period ended,,,,2026-07-30 publisher labels Page updated,,2026-08-31 headquarters-vacate deadline; full implementation stated for summer 2027,,,"The chart and pre-campaign research used Food and Nutrition Service/Food, Nutrition, and Consumer Services identity and the prior Alexandria-centered organization.","The official publisher identifies the mission area as Food and Nutrition Administration, says the Administrator reports directly to the Secretary, realigns programs and retailer-compliance offices into five regional hubs, requires Northern Virginia headquarters space to be vacated by August 31, and targets full implementation by summer 2027.","This is a reservoir-new historical repair, not an August 23 event. The July 30 label is a native page-revision clock, not a manufactured effective date. USDA says no layoffs are planned and bargaining is ongoing; final staffing, relocations, collective-bargaining outcomes, and summer-2027 completion remain unproved.",No exact governed pre-campaign reorganization-page or FNA-identity match was found; the chart still carries the historical Food & Nutrition Service label.,reservoir_new_historical,promote_historical_review,Wave 4 agriculture historical review unit W4-AG-UNIT-004,2026-08-23 09:56:28.783092 EDT W4-AG-OBJ-009,4,fg-154,Animal and Plant Health Inspection Service,U.S. Department of Agriculture,final nonregulated-status determination,legal_regulatory_instruments,2026-15876,APHIS determination for MON 87429 corn,https://www.federalregister.gov/documents/2026/08/05/2026-15876/mon-87429-corn-determination-of-nonregulated-status,,2026-08-05 Federal Register publication,2026-07-30 APHIS determination,,,2026-08-05,2026-07-30 determination date,,,,MON 87429 corn remained under the prior petition review state.,APHIS determined MON 87429 corn is unlikely to pose a plant-pest risk and is not subject to regulation under 7 CFR part 340.,Exact duplicate of governed Weekly Delta 2026-08-08; retained only to prove the complete legal census and dedup result.,Exact pre-campaign match: Research Packages/Federal Government Weekly Delta 2026-08-08/waves/WAVE_4_PHYSICAL_PRODUCTION.md.,duplicate,reject_duplicate,none,2026-08-23 09:56:28.783092 EDT W4-AG-OBJ-015,4,fg-154,Animal and Plant Health Inspection Service,U.S. Department of Agriculture,petition and draft plant-pest risk assessment,legal_regulatory_instruments,2026-16809,Pioneer COR-23134-4 soybean petition and draft plant-pest risk assessment,https://www.federalregister.gov/documents/2026/08/18/2026-16809/pioneer-hi-bred-international-inc-availability-of-a-petition-for-the-determination-of-nonregulated,,2026-08-17 APHIS latest-update carrier,,2026-10-19 comment deadline,,2026-08-18,,,,,The soybean remains under APHIS petition review.,APHIS made Pioneer petition 26-121-01p and a draft plant-pest risk assessment available for comment.,"Petition/draft only: no final determination, deregulation, planting, sale, shipment, adoption, or observed agronomic effect is established.",No exact pre-campaign petition match was found.,time_novel,support_existing_plotline,C-only proposal support,2026-08-23 09:56:28.783092 EDT W4-AG-OBJ-019,4,fg-154,Animal and Plant Health Inspection Service,U.S. Department of Agriculture,electronic-payment implementation,operations_organization_funding_data,APHIS-AQI-ELECTRONIC-PAYMENTS-2026-08-01,APHIS moves Agricultural Quarantine and Inspection fee payments to electronic-only methods,https://www.aphis.usda.gov/aqi/fees,,,,,,,2026-08-01,2026-08-01 electronic-only payment state,,,APHIS accepted the prior set of AQI fee payment methods.,APHIS states AQI fee payments are electronic-only under Executive Order 14247 implementation.,"Historical implementation repair/state support only; page modification metadata is not an object clock, and no payment transaction or revenue effect is inferred.",No exact governed pre-campaign implementation match was found.,reservoir_new_historical,support_existing_plotline,C-only monetary-rail implementation support,2026-08-23 09:56:28.783092 EDT
Section 9 of 11
W4-AG-OBJ-020,4,fg-154,Animal and Plant Health Inspection Service,U.S. Department of Agriculture,program operating-state update,operations_organization_funding_data,APHIS-NWS-PORT-STATE-2026-08-20,New World screwworm livestock-port state through August 20,https://www.aphis.usda.gov/animal-health/livestock-poultry-disease/cattle-ticks-and-screwworm/screwworm/current-status,,,,,,,,"2026-08-24 conditional planned Douglas reopening, not observed",,,The governed August 4 watch already recorded southern-port closure and a conditional Douglas reopening plan.,"APHIS continued to state all southern livestock ports closed and retained August 24 as the conditional Douglas reopening date, with later ports still to be determined.","State recertification only. Page-revision metadata is not a manufactured publication or port-operating clock; no August detection, actual reopening, later-port schedule, shipment, interdiction, or disease effect is established.",The August 4 whole-site package already covered the port-closure/reopening watch.,state_recertification,watch_update_only,C-only existing NWS watch update,2026-08-23 09:56:28.783092 EDT W4-AG-OBJ-018,4,fg-154,Animal and Plant Health Inspection Service,U.S. Department of Agriculture,final import Federal order,legal_regulatory_instruments,DA-2026-28,APHIS potato-wart import safeguards for Prince Edward Island potatoes,https://www.aphis.usda.gov/news/program-update/aphis-strengthens-import-safeguards-protect-united-states-potato-wart,,2026-08-21 date-level,2026-08-21 final Import Federal Order DA-2026-28,,,,2026-10-05,"2026-10-05 compliance-agreement, waste-use, traceability, and certification requirements",,,"The prior Prince Edward Island potato import safeguards did not contain the newly described facility, waste-feed, and traceability terms.","APHIS issued final Import Federal Order DA-2026-28, effective October 5, adding compliance-agreement, cull/waste, traceability, and certification safeguards.","The final order changes import safeguards but no exact established Observatory potato-wart storyline join was proved; imports, violations, enforcement, disease detection, or observed effect are not inferred.",No exact pre-campaign order match was found.,time_novel,support_existing_plotline,C-only legal-state support,2026-08-23 09:56:28.783092 EDT W4-AG-OBJ-022,4,fg-157,Federal Crop Insurance Corporation Board of Directors,Risk Management Agency,scheduled board meeting without posted outcome,oversight_courts_congress,FCIC-BOARD-2026-08-20,FCIC August 20 board meeting — outcome documents not posted at cutoff,https://www.rma.usda.gov/about-rma/fcic/fcic-board-meetings,,2026-08-20 scheduled meeting date on public notice and agenda,,,,,,,,,The FCIC page exposed a public notice and agenda for the August 20 meeting.,"At the August 23 close, the page still labeled August 20 as upcoming and exposed no minutes, manager report, action record, or outcome document.","Access/content hold: the schedule does not prove the meeting occurred or any approval, rejection, legal act, program change, or implementation.",No exact governed pre-campaign outcome object exists because no outcome document was proved.,access_hold,hold_access,none,2026-08-23 09:56:28.783092 EDT W4-AG-OBJ-021,4,fg-157,Risk Management Agency,Federal Crop Insurance Corporation,manager bulletin amendment,operations_organization_funding_data,MGR-26-006.3,RMA expands apple-freeze emergency procedures to eleven additional or covered states,https://www.rma.usda.gov/policy-procedure/bulletins-memos/managers-bulletin/mgr-26-006.3-emergency-procedures-2026-crop-year-apples-affected-april-freeze,,2026-08-17 date-level,2026-08-17 MGR-26-006.3,,,,2026-08-17,2026-08-17 onward for 2026 crop-year apple loss adjustment,,,The April-freeze emergency procedures covered the earlier named state set.,"MGR-26-006.3 expanded the procedures to Connecticut, Delaware, Illinois, Indiana, Maine, Massachusetts, New Hampshire, New Jersey, Ohio, Rhode Island, and Vermont.","Crop/state extension only; no indemnity, payment, orchard recovery, delivery, or observed economic effect is established.",No exact pre-campaign bulletin-amendment match was found.,time_novel,support_existing_plotline,C-only crop-insurance watch support,2026-08-23 09:56:28.783092 EDT W4-AG-OBJ-007,4,fg-157,Risk Management Agency,Federal Crop Insurance Corporation,manager bulletin,operations_organization_funding_data,MGR-26-009,RMA defers premium interest charges and authorizes up to 60 additional payment days,https://www.rma.usda.gov/policy-procedure/bulletins-memos/managers-bulletin/mgr-26-009-deferral-interest-charges,,2026-08-05 date-level,2026-08-05 MGR-26-009,,,,,2026-08 monthly accounting reports through 2026-12-31 expiration,,,Standard premium and administrative-fee due dates and interest collection applied.,MGR-26-009 allows approved insurance providers to grant up to 60 additional days and directs RMA to defer collection and waive associated interest for the stated period.,"This is ordinary program payment flexibility; it does not prove producer use, insurer approval, Treasury payment, indemnity, delivery, or crop outcome.",The Observatory tracks farm and disaster economics broadly; no exact pre-campaign bulletin match was found.,time_novel,support_existing_plotline,C-only crop-insurance administration support,2026-08-23 09:56:28.783092 EDT W4-AG-OBJ-008,4,fg-157,Risk Management Agency,Federal Crop Insurance Corporation,crop-insurance option reinstatement,operations_organization_funding_data,RMA-PREVENTED-PLANTING-PLUS5-2026,RMA reinstates additional five-percent prevented-planting coverage option,https://www.rma.usda.gov/news-events/news/2026/washington-dc/usda-announces-new-crop-insurance-payment-flexibilities,,2026-08-05 date-level,2026-08-05 date-level,,,,,2026-08-31 and later sales-closing dates for 2027 crop year,,,The additional five-percent prevented-planting option was unavailable under the immediately prior program state.,RMA announced reinstatement of the option to buy an additional five percent of prevented-planting coverage beginning with the described 2027-crop filing cycle.,"This is program-option administration, not a purchase, award, obligation, payment, prevented-planting event, or observed farm effect.",The Observatory tracks crop and disaster economics broadly; no exact pre-campaign reinstatement match was found.,time_novel,support_existing_plotline,C-only crop-insurance program support,2026-08-23 09:56:28.783092 EDT W4-TT-OBJ-001,4,fg-172,Department of Transportation,Department of Transportation,departmental strategy,operations_organization_funding_data;publications_libraries_foia_archives,DOT-NRSS-2026-08-05,National Roadway Safety Strategy issued,https://www.transportation.gov/briefing-room/trumps-transportation-department-releases-new-strategy-deliver-safer-roads-american,,2026-08-05 date level,,,,,,2026-08-05 strategy-issuance state,,,The prior safety strategy/control posture remained the latest governed state,"DOT issued a new interdepartmental strategy organized around safer people, roads and vehicles","A strategy is not a rule, appropriation, obligation, award, construction start or measured safety outcome.","Federal Government Weekly Delta 2026-08-08, Wave 5 Infrastructure and Industrial Enablement",duplicate,retain_pre_campaign_reference,no standalone promotion; pre-campaign reservoir owns the object,2026-08-23 09:54:27.551157 EDT W4-TT-OBJ-020,4,fg-172,Department of Transportation Office of Inspector General,Department of Transportation Office of Inspector General,payment-integrity compliance audit,oversight_courts_congress;publications_libraries_foia_archives,DOT-OIG-LIBRARY-47325,DOT FY2025 Payment Integrity Information Act compliance review,https://services.oig.dot.gov/library-item/47325,,2026-08-05 date level,,,,2026-08-05 date level,,,,FY 2025 payment-integrity reporting period,The FY2024 review reported lower estimated improper-payment rates for the two susceptible DOT programs,"OIG found DOT compliant for FY2025; DOT reported 2.39 billion dollars, 3.86 percent, for FHWA Highway Planning and Construction and 8.36 million dollars, 0.16 percent, for FTA TIG COVID Relief, with one minor reporting discrepancy and no recommendations","These are DOT-reported improper-and-unknown-payment estimates reviewed for statutory compliance, not newly adjudicated theft, confirmed monetary loss for every dollar, trust-fund balances, recoveries or causal findings.","No exact pre-campaign title, report ID, URL or amount/rate combination found",time_novel,retain_for_plotline_review,Wave 4 Government Fraud and watchdog promotion review,2026-08-23 09:54:27.551157 EDT W4-TT-OBJ-002,4,fg-172,Office of the Secretary of Transportation; Build America Bureau,Department of Transportation,request for information,legal_regulatory_instruments;operations_organization_funding_data,FR-2026-16776,America's Great Corridors of Commerce request for information,https://www.federalregister.gov/documents/2026/08/18/2026-16776/americas-great-corridors-of-commerce-request-for-information,https://www.govinfo.gov/content/pkg/FR-2026-08-18/pdf/2026-16776.pdf,2026-08-18 date level,,,,2026-08-18 date level,,2026-09-12 comment deadline,,,No operating Great Corridors designation or private Corridor Manager concession program was proved,DOT requested comment on a voluntary 30-to-50-year shared-corridor concession architecture,"The RFI is not a designation, task force, procurement, concession, financing commitment, permit, utility lease, construction or operation.","Federal Government Weekly Delta 2026-08-20, Wave 3 Human and Physical Infrastructure",duplicate,retain_pre_campaign_reference,no standalone promotion; pre-campaign reservoir owns the object,2026-08-23 09:54:27.551157 EDT W4-TT-OBJ-004,4,fg-173,Federal Aviation Administration,Federal Aviation Administration,air-traffic-control facility opening,operations_organization_funding_data,FAA-AVL-ATCT-OPEN-2026-08-07,New Asheville air traffic control tower opened,https://www.faa.gov/newsroom/faa-opens-new-asheville-air-traffic-control-tower-support-record-growth-western-north,,2026-08-07 date level,,,,,,,2026-08-07 tower-opening state,,Asheville controllers operated from a tower dating to 1961,FAA opened a new 121-foot tower built with 31.7 million dollars in IIJA funding; separate equipment upgrades remain due by the end of 2028,"Opening proves the facility state, not completion of the future radar, voice-switch or Surface Awareness upgrades, or a measured capacity or safety effect.","No exact pre-campaign title, URL or stable-object match found",time_novel,retain_support_only,existing infrastructure plotline support; no standalone review,2026-08-23 09:54:27.551157 EDT W4-TT-OBJ-008,4,fg-173,Federal Aviation Administration,Federal Aviation Administration,surface-radar installation,operations_organization_funding_data,FAA-DCA-SMR4-INSTALL-2026-08-14,Surface Movement Radar Model 4 installed at Reagan National,https://www.faa.gov/newsroom/trumps-transportation-secretary-sean-p-duffy-installs-brand-new-surface-movement-radar,,2026-08-14 date level,,,,,,2026-08-14 installation-announcement state,,,DCA modernization was underway without this SMR-4 installation state,"FAA announced installation of an SMR-4 at DCA, the fifth airport to receive the model",Installation is not a measured safety outcome; three-year investment language and equipment due by end-2028 are future states.,"No exact pre-campaign title, URL or stable-object match found",time_novel,retain_support_only,existing airspace-technology watch support; no standalone review,2026-08-23 09:54:27.551157 EDT
Section 10 of 11
W4-TT-OBJ-009,4,fg-173,Federal Aviation Administration; Electra; Pennsylvania Department of Transportation; New Jersey Department of Transportation,Federal Aviation Administration,hybrid-electric demonstration flights,operations_organization_funding_data,FAA-EIPP-PA-NJ-HYBRID-FLIGHTS-2026-08-18,Hybrid-electric eIPP flights connected small airports with Philadelphia,https://www.faa.gov/newsroom/faa-announces-key-demonstrations-hybrid-electric-flights-connecting-small-airports-major,,2026-08-18 date level,,,,,,,2026-08-18 demonstration-flight announcement state,,"Pennsylvania was an eIPP participant, but the multistate route demonstrations had not been observed in the governed reservoir","Electra, PennDOT and NJDOT conducted demonstration flights between Manassas and Philadelphia with stops at New Jersey and Pennsylvania airports","The flights are tests and data collection, not certification, commercial route authority, scheduled passenger service, fleet deployment or safety/economic outcome.","No exact pre-campaign title, URL or stable-object match found",time_novel,retain_for_plotline_review,Wave 4 advanced-air-mobility promotion review,2026-08-23 09:54:27.551157 EDT W4-TT-OBJ-003,4,fg-173,Federal Aviation Administration; Ampaire Inc.; Utah Department of Transportation,Federal Aviation Administration,hybrid-electric demonstration flight,operations_organization_funding_data,FAA-EIPP-UTAH-HYBRID-FLIGHT-2026-08-06,Hybrid-electric eIPP demonstration flight along Utah's I-15 corridor,https://www.faa.gov/newsroom/faa-marks-major-milestone-hybrid-electric-flight-test-utah,,2026-08-06 date level,,,,,,,2026-08-06 demonstration-flight state,,"Utah was an eIPP participant, but this corridor flight had not been observed in the governed reservoir",Ampaire and Utah DOT conducted a hybrid-electric demonstration flight between Salt Lake City and Cedar City to test future cargo service,"The completed test flight is not certification, scheduled cargo service, route approval, fleet deployment, commercial operation or safety outcome; later flights remain planned.","No exact pre-campaign title, URL or stable-object match found in governed vault or Workbench packages",time_novel,retain_for_plotline_review,Wave 4 advanced-air-mobility promotion review,2026-08-23 09:54:27.551157 EDT W4-TT-OBJ-006,4,fg-173,Federal Aviation Administration,Federal Aviation Administration,surface-radar installation,operations_organization_funding_data,FAA-EWR-SMR4-INSTALL-2026-08-11,Surface Movement Radar Model 4 installed at Newark Liberty,https://www.faa.gov/newsroom/trumps-transportation-secretary-sean-p-duffy-unveils-brand-new-radar-latest-improvement,,2026-08-11 date level,,,,,,2026-08-11 installation-announcement state,,,Newark's surface-surveillance modernization sequence remained incomplete,FAA announced installation of a new SMR-4 at Newark Liberty International Airport,"Installation is not a measured reduction in incursions, a national deployment completion or proof of every associated modernization element.","No exact pre-campaign title, URL or stable-object match found",time_novel,retain_support_only,existing airspace-technology watch support; no standalone review,2026-08-23 09:54:27.551157 EDT W4-TT-OBJ-019,4,fg-173,Federal Aviation Administration,Department of Transportation,draft environmental assessment notice,legal_regulatory_instruments,FR-2026-16803,Draft environmental assessment for Reditus ENOS Gulf reentry operations,https://www.federalregister.gov/d/2026-16803,https://www.govinfo.gov/content/pkg/FR-2026-08-18/pdf/2026-16803.pdf,,,,,2026-08-18 date level,,,,,The Reditus ENOS Gulf reentry proposal lacked this public draft-EA comment state,FAA noticed availability of a draft environmental assessment for proposed ENOS reentry operations,"A draft EA is not a final environmental finding, reentry license, mission authorization, reentry operation or observed effect.","No exact pre-campaign title, URL or stable-object match found",time_novel,retain_support_only,existing commercial-space plotline watch support,2026-08-23 09:54:27.551157 EDT W4-TT-OBJ-013,4,fg-173,Federal Aviation Administration,Department of Transportation,comment-period extension,legal_regulatory_instruments,FR-2026-17111,Draft Airport Improvement Program Handbook comment period extended,https://www.federalregister.gov/d/2026-17111,https://www.govinfo.gov/content/pkg/FR-2026-08-21/pdf/2026-17111.pdf,,2026-08-19 issuance date,2026-08-20 date level,,2026-08-21 date level,,2026-08-31 comment deadline,,,Comments on draft FAA Order 5100.38E were due August 17,FAA extended the draft-handbook comment period by 14 days to August 31,"The extension changes only the proposal/comment clock; it does not issue the final handbook or change an award, obligation or airport project.","No exact pre-campaign title, URL or stable-object match found",time_novel,retain_census_only,complete legal-family census; no standalone admission,2026-08-23 09:54:27.551157 EDT W4-TT-OBJ-012,4,fg-173,Federal Aviation Administration,Department of Transportation,categorical-exclusion adoption,legal_regulatory_instruments,FR-2026-17212,FAA adoption of Air Force categorical exclusion for specified supersonic-flight reviews,https://www.federalregister.gov/documents/2026/08/24/2026-17212/adoption-of-categorical-exclusion-under-the-national-environmental-policy-act,https://public-inspection.federalregister.gov/2026-17212.pdf,,2026-08-19 issuance date,2026-08-21 08:45:00 EDT,2026-08-21 08:45:00 EDT,2026-08-24 scheduled publication,2026-08-24 immediately upon publication,,,,FAA environmental review for the covered Special Flight Authorization actions lacked this adopted DAF categorical-exclusion pathway,"FAA adopted DAF CATEX A116-34 for qualifying supersonic Special Flight Authorization reviews, subject to extraordinary-circumstances review and documentation","The pathway is not an SFA, corridor/route approval, environmental approval for every flight, aircraft certification, test flight or commercial operation.","No exact pre-campaign title, URL or stable-object match found; discovered on the August 21 public-inspection docket after the weekly cutoff",time_novel,retain_for_plotline_review,Wave 4 advanced-airspace legal-state promotion review,2026-08-23 09:54:27.551157 EDT W4-TT-OBJ-014,4,fg-173,Government Accountability Office,Government Accountability Office,oversight report,oversight_courts_congress;publications_libraries_foia_archives,GAO-26-108578,"Airports: online fuel-price information widely available, required-fee information less available",https://www.gao.gov/products/gao-26-108578,,2026-08-11 public release,,,,2026-08-11 date level,,,,,Congress required GAO to assess general-aviation fuel-price and fee transparency,GAO reported that fuel prices were generally available online while required-service-fee information was sometimes missing; no recommendation was made,"The descriptive sample is not a rule, formal complaint, enforcement decision, universal airport condition or proof of deceptive conduct.","No exact pre-campaign title, URL or report-number match found",time_novel,retain_census_only,oversight-family census; no standalone admission,2026-08-23 09:54:27.551157 EDT W4-TT-OBJ-021,4,fg-175,Department of Transportation Office of Inspector General,Department of Transportation Office of Inspector General,audit initiation,oversight_courts_congress,DOT-OIG-26F3015F000,Audit initiated of FRA grant performance periods and inactive funds,https://www.oig.dot.gov/library-item/47329,,2026-08-12 date level,2026-08-12 audit-initiation state,,,,,,,,OIG had prior findings on unused funds but no current audit of FRA's grant performance periods and inactive-fund oversight,OIG opened project 26F3015F000 to assess FRA oversight of grant performance periods and inactive funds,"The initiation creates an audit scope and clock, not findings, questioned costs, improper payments, deobligation, recovery, enforcement or program change.","No exact pre-campaign project-ID, title or URL match found",time_novel,retain_support_only,existing watchdog and missing-money plotline support,2026-08-23 09:54:27.551157 EDT W4-TT-OBJ-010,4,fg-176,National Highway Traffic Safety Administration,Department of Transportation,request for comment,legal_regulatory_instruments,FR-2026-16735,New Car Assessment Program request for comment,https://www.federalregister.gov/d/2026-16735,https://www.govinfo.gov/content/pkg/FR-2026-08-17/pdf/2026-16735.pdf,,,,,2026-08-17 date level,,2026-10-16 comment deadline,,,NCAP included the existing Fishhook rollover and side-air-bag out-of-position tests,NHTSA requested comment on removing those tests and updating the ten-year NCAP roadmap,"This is a request for comment, not a final test-policy change, vehicle rating, compliance standard, implementation or observed safety result.","No exact pre-campaign title, URL or stable-object match found",time_novel,retain_census_only,complete legal-family census; no plotline admission,2026-08-23 09:54:27.551157 EDT W4-TT-OBJ-011,4,fg-177,Federal Transit Administration,Department of Transportation,supplemental proposed waiver,legal_regulatory_instruments,FR-2026-16812,Supplemental proposed partial Buy America waiver for minibuses,https://www.federalregister.gov/d/2026-16812,https://www.govinfo.gov/content/pkg/FR-2026-08-18/pdf/2026-16812.pdf,,,,,2026-08-18 date level,,2026-09-02 comment deadline,,,FTA's December 2024 proposed battery-electric-minibus waiver remained unfinalized,"FTA requested additional comment, including whether to remove the battery-electric propulsion condition","The supplemental proposal is not a final waiver, procurement, award, domestic-content determination or vehicle delivery.","No exact pre-campaign title, URL or stable-object match found",time_novel,retain_census_only,complete legal-family census; no plotline admission,2026-08-23 09:54:27.551157 EDT W4-TT-OBJ-005,4,fg-177,Federal Transit Administration,Federal Transit Administration,capital-project phase transition,operations_organization_funding_data,FTA-FRONTRUNNER-2X-ENGINEERING-2026-08-07,FrontRunner 2X entered FTA Engineering,https://www.transit.dot.gov/about/news/trumps-transportation-department-announces-milestone-utahs-frontrunner-2x-commuter-rail,,2026-08-07 date level,,,,,,2026-08-07 Engineering-entry state,,,FrontRunner 2X was in the Capital Investment Grants project-development pipeline,FTA announced entry into Engineering and a 1.28-billion-dollar federal commitment posture permitting specified non-construction expenditures,"Engineering entry and pledge language do not prove a full-funding grant agreement, obligation, outlay, construction, completed double track, increased frequency or 2030 revenue service.","No exact pre-campaign title, URL or stable-object match found",time_novel,retain_support_only,existing infrastructure plotline support; no standalone review,2026-08-23 09:54:27.551157 EDT
Section 11 of 11
W4-TT-OBJ-007,4,fg-178,Maritime Administration,Department of Transportation,grant-selection package,operations_organization_funding_data,MARAD-SMALL-SHIPYARD-GRANTS-2026,Small Shipyard grant selections for 45 shipyards,https://www.transportation.gov/briefing-room/trumps-transportation-secretary-sean-p-duffy-invests-351-million-small-shipyards,,2026-08-13 date level,2026-08-13 selection-announcement state,,,,,,,,The July 25 governed research explicitly awaited the 2026 Small Shipyard selection,MARAD announced a 35.1-million-dollar selection package for infrastructure and workforce projects at 45 shipyards in 24 states and the U.S. Virgin Islands,"The aggregate selection package is one primary object and is not proof of 45 executed agreements, obligations, payments, installed assets, trained workers, production growth or maritime-dominance outcome.",Prior July research contained the unresolved selection watch but no selected 2026 slate,time_novel,retain_for_plotline_review,Wave 4 maritime-industrial infrastructure promotion review,2026-08-23 09:54:27.551157 EDT W4-TT-OBJ-015,4,fg-179,Great Lakes St. Lawrence Seaway Development Corporation,Department of Transportation,categorical-exclusion adoption,legal_regulatory_instruments,FR-2026-15649,Seaway adoption of TVA building-and-infrastructure categorical exclusion,https://www.federalregister.gov/documents/2026/08/03/2026-15649/notice-of-adoption-of-tennessee-valley-authority-categorical-exclusion-under-the-national,https://www.govinfo.gov/content/pkg/FR-2026-08-03/pdf/2026-15649.pdf,,,,,2026-08-03 date level,2026-08-03 upon publication,,,,GLS lacked this adopted review pathway for qualifying building and associated-infrastructure actions,GLS adopted the TVA categorical exclusion subject to extraordinary-circumstances review,"Adoption is not project approval, funding, construction, completion or operation.","Federal Government Whole-Site Recertification 2026-08-01, Infrastructure and Industrial Enablement Full-Surface Wave 2026-08-04",duplicate,retain_pre_campaign_reference,no standalone promotion; pre-campaign reservoir owns the object,2026-08-23 09:54:27.551157 EDT W4-TT-OBJ-016,4,fg-180,Federal Highway Administration; Bureau of the Fiscal Service,Federal Highway Administration; Treasury,trust-fund monthly status recertification,operations_organization_funding_data;publications_libraries_foia_archives,HTF-FY2026-THROUGH-JUNE,Highway Trust Fund FY2026 actual status through June,https://www.fhwa.dot.gov/highwaytrustfund/,,,,,,,,FY 2026 through June 2026 reporting period,,,The campaign had not recertified the latest populated FY2026 month on the native fund page,"For June, the Highway Account shows a 49,135,636,417.40-dollar opening balance, 3,684,956,312.00 dollars in total receipts, a 400,000,000-dollar transfer to Mass Transit, 4,208,289 dollars from Mass Transit, 5,351,004,492 dollars in outlays, 5,357,408,871.45 dollars in total outlays and a 47,070,709,015.52-dollar closing balance; July through September remain blank","The June reporting period is not a posting timestamp; transfers, obligations, outlays, awards, construction and operation remain distinct, and no later month is inferred.",No exact current-state recertification in the pre-campaign reservoir; historical HTF mechanics were already known,state_recertification,retain_support_only,existing infrastructure/accounting watch support,2026-08-23 09:54:27.551157 EDT W4-TT-OBJ-017,4,fg-181,Federal Aviation Administration; Bureau of the Fiscal Service,Federal Aviation Administration; Treasury,trust-fund public-reporting access hold,operations_organization_funding_data;publications_libraries_foia_archives,AATF-PUBLIC-MONTHLY-REPORTING-HOLD-2026-08-23,Airport and Airway Trust Fund current public monthly balance unresolved,https://www.faa.gov/about/budget/aatf,,,,,,,,FY 2025 closing-balance period; FY 2026 forecast period,,,FAA's page reports an FY2025 closing cash balance while the legacy public monthly-report route ends with FY2024 material,"Fresh recertification confirmed the FY2025 21.8-billion-dollar closing cash-balance statement and Treasury's FY2026 excise-tax-revenue forecast of 21.3 billion dollars, but no public FY2026 monthly balance; newer monthly reports require authenticated federal-agency access","The access hold is not evidence that reports, receipts, transfers, obligations or outlays do not exist; the FY2026 revenue forecast is not observed revenue.",Current public-state recertification; no lawful current-month public report found,access_hold,retain_access_hold,completeness hold; no plotline admission,2026-08-23 09:54:27.551157 EDT W4-TT-OBJ-018,4,fg-182,U.S. Army Corps of Engineers; Department of the Treasury,U.S. Army Corps of Engineers; Treasury,trust-fund budget/work-plan recertification,operations_organization_funding_data;publications_libraries_foia_archives,HMTF-FY2026-FY2027-BUDGET-STATE,Harbor Maintenance Trust Fund FY2026 and FY2027 budget-document state,https://www.usace.army.mil/Missions/Civil-Works/Budget/,,,,,,,,FY 2026 work-plan period; FY 2027 budget-request period,,,The campaign had not recertified the current USACE HMTF budget-document shelf,"USACE exposes FY2027 HMTF budget crosswalk and justification plus FY2026 justification/work-plan material; the FY2027 pressbook lists a 1,392,561,000-dollar HMTF appropriation account and 1,700,000,000 dollars as an HMTF source of appropriations","Budget requests, estimated sources, appropriations, work plans, obligations, outlays, dredging/construction and operational results are separate; no trust-fund cash balance is inferred.",No exact current-state recertification found in the pre-campaign reservoir,state_recertification,retain_support_only,existing infrastructure/accounting watch support,2026-08-23 09:54:27.551157 EDT