Program and Project Registry

.md · 1 sections · 3837 characters

Source, owner, and dates

workbench: Research Packages/FORTRESS America and Military Installation Energy Independence 2026-09-30/PROGRAM_AND_PROJECT_REGISTRY.md

Canonical source SHA-256: c4c6055e095f5e36612cf044079b338b0a373d463836658aeab9b8022194cd74

Served copy SHA-256: c4c6055e095f5e36612cf044079b338b0a373d463836658aeab9b8022194cd74

Owner evidence cutoffs: {"fortress-america-installation-energy-independence": "2026-09-30T23:59:59-04:00"}

These are package-level cutoffs, not a claim that this source was rechecked on those dates. Use its own publication and capture dates.

Owners: fortress-america-installation-energy-independence

Program and Project Registry

Section 1 of 1

# Program and Project Registry

Status: current bounded registry; not an exhaustive site census Cutoff: 2026-09-30 ET

Program/project Owner/operator model Public state Load/duration boundary Next decisive receipt
FORTRESS America central Department program; office directed under USW(A&S) established every major installation; “independent power” undefined office, charter, site list, technical standard and budget
10 U.S.C. §2920 implementation Department/services/agencies statutory_requirement each installation's critical-mission energy; 99.9% minimum availability by FY2030 issued standards, site baselines and compliance evidence
Installation Energy Plans services/installations planning_system installation-specific mission/load/risk current plan tied to financed projects and tests
ERCIP OSD/services; appropriated Defense-wide MILCON operating_funding_program project-specific mission assurance project list, award, completion and test
Army SCI energy private developer on Army land; emergency priority by agreement six_conditional_selections solicitation says island within qualifying outage and support installation ≥14 days executed EUL/PPA, financing close, interconnection and test
Army Janus contractor-owned/operated reactors five_vendor_site_pairings_selected site requirements not equal to full-base load by announcement alone design/authorization, construction, criticality and power delivery
NWS Crane MMR planned commercial owner/operator; Navy host with Army Janus and department partners deployment_announced_for_2028 critical operations; announcement does not establish full-installation load executed agreement, authorization, design, construction, criticality and accepted delivery
Eielson microreactor proposed private vendor under long-term service arrangement notice_of_intent_negotiation up to 5 MW to critical infrastructure final award, NRC licence, construction and operation
Project Pele government prototype/test at INL prototype_demonstration_path technology demonstration, not base service fueled criticality, output and published test result
MCAS Yuma microgrid utility partnership operational_publicly_described backup capacity for 100% current/projected base requirements current exercise and readiness result
MCAS Miramar microgrid mixed sources and third-party/system partners operational_and_exercised design description up to 21 days; observed exercise covered mission-critical operations current endurance/recovery exercise report
SUBASE New London microgrid Navy plant plus first-right access to utility/private fuel-cell park operational essential functions; 10.75 MW CHP plus 7.4 MW fuel cells current black-start/endurance result
Fort McCoy Main Gate microgrid Army/Xcel partnership operational_scope_limited gate and nearby mission-essential facilities; stated ≥14 days observed 14-day or recurring exercise result
DLA Distribution Sigonella DLA/NAVFAC tenant-facility system activated_scope_limited DLA facilities; stated up to 14 days on one fuel load observed endurance and recovery result
Next Great American Base future model-base initiative announced_design_objective completely off commercial grid by announcement site, authority, plan, budget, construction and operation

## Portfolio finding

The current estate already contains full-load, critical-load, campus, gate and tenant-facility microgrids plus emerging nuclear and private-generation models. FORTRESS cannot use a single project count as its readiness denominator. The portfolio needs common load, duration and test fields before unlike projects can be compared.