.md · 3 sections · 33873 characters
workbench: Research Packages/Federal Science Operating System/FEDERAL_FUSION_DATE_TIME_PLACE_LEDGER_2020-2035.md
Canonical source SHA-256: b4845153a6a27f43e7c2a6e527d4fc1ea5e3bb0c20ca828f8655bd6e02833f68
Served copy SHA-256: b4845153a6a27f43e7c2a6e527d4fc1ea5e3bb0c20ca828f8655bd6e02833f68
Owner evidence cutoffs: {"federal-science-operating-system": "2026-10-12", "federal-fusion-commercialization": "2026-08-15", "genesis-mission": "2026-10-13"}
These are package-level cutoffs, not a claim that this source was rechecked on those dates. Use its own publication and capture dates.
Owners: federal-science-operating-system, federal-fusion-commercialization, genesis-mission
Section 1 of 3
# Federal fusion date, time and place ledger, 2020–2035
Evidence cutoff: 2026-08-15 17:34:07.266 UTC
Status: current Workbench research; factual clock register
Scope: material U.S. fusion-policy, scientific, regulatory, licensing, publication and forward-target clocks in the Federal Science / fusion bridge
Astrology boundary: this Research file contains factual clocks only. Chart conventions and readiness selections are maintained separately in Chronicle Astrology Files and have no evidence vote.
Only a few fusion objects presently support a genuinely timed chart. The strongest physical clock is NIF's first ignition shot at 1:03:50 a.m. local facility time on December 5, 2022. The strongest federal administrative clock is the fusion proposed rule's 8:45 a.m. Eastern public-inspection filing on February 25, 2026. DOE's August 15 campaign supplies an exact digital publication instant—1:34:04.501 p.m. EDT for the root post—but no source-attested physical posting place.
The June 9 roadmap release is date-only. Exact timestamps found in its webpage and PDF metadata describe page creation, later modification or file production; none is proven to be the public-release instant.
The project-registry extension adds a date-only physical clock for Realta's June 19, 2026 WHAM direct-energy-conversion experiment and exact publication clocks at 7:00 a.m. ET on June 30 for that result and 8:00 a.m. ET on July 15 for its Forge/Hammir site announcement. It also preserves exact Type One publication clocks while keeping their underlying contract, LOI and filing times unresolved. Tennessee's March 11 rule receipt is stamped 10:37 a.m., but the source omits the timezone and therefore does not support an exact-instant chart.
Source place or locus is factual metadata. An institutional headquarters,
press-release dateline, project site and online publication origin are not
interchangeable.The D.C.-cast chart convention and chart-readiness overlay are maintained
separately in Chronicle Astrology Files at
03 - Astrology/Astrology Files/Mundane Story Overlaps/Federal Fusion Chart Readiness 2020-2035.md.
They do not contribute factual evidence to this ledger.
datetime, date, month, year, conditional,
not_publicly_resolved.occurred, scheduled, conditional, postponed,
cancelled, not_occurred, not_publicly_resolved.exact_second, exact_minute, approximate_source,
bounded_source_window, daytime_no_clock, date_only_no_clock,
not_publicly_stated, not_applicable_partial_date.physical_event, legal_regulatory_locus,
publication_locus, distributed_operation, online_publication,
source_place_not_publicly_stated.All unknowns below are affirmative research findings: the source was checked
and did not establish the missing field. Derived means a transparent calendar
or civil-time conversion, not a source-printed value.
| Clock ID | Object and clock role | Source date and time | Precision / timezone | Source place or locus | Status and fact established | Boundary / open retrieval | Primary source |
|---|---|---|---|---|---|---|---|
FUS-LAW-20201227 |
Energy Act of 2020 milestone-program authorization enacted within P.L. 116-260 | 2020-12-27; time not publicly stated | date; date_only_no_clock |
Signature place not established in the enrolled law | occurred; authorization created |
Not an appropriation, award or operating program milestone; exact signature time/site unresolved | P.L. 116-260 |
FUS-POL-20220317 |
White House fusion summit scheduled opening and event window | 2022-03-17, 10:00 a.m.–1:00 p.m. ET | datetime; opening exact_minute, event bounded_source_window; EDT / America/New_York |
Physical venue not stated in the official agenda | occurred as a scheduled federal policy event; 10:00 a.m. is the advertised opening |
Actual opening instant and venue require a recording or event record | OSTP/DOE agenda |
FUS-NIF-20221205 |
NIF first fusion-ignition shot; physical experiment | 2022-12-05, 1:03:50 a.m. local facility time | datetime; exact_second; timezone not printed, derived as PST / America/Los_Angeles; derived UTC 09:03:50Z |
National Ignition Facility, Lawrence Livermore National Laboratory, Livermore, California | occurred; physical ignition shot |
Preserve the derived-zone caveat; do not substitute the December 13 public announcement or treat target gain as facility/grid gain | LLNL exact clock |
FUS-MILESTONE-SELECT-20230531 |
DOE selects eight Milestone Program recipients | 2023-05-31; time not publicly stated | date; date_only_no_clock |
DOE selection/publication locus not established | occurred; funding cohort selected |
Selection is not an executed agreement, obligation, verification, payment or plant | DOE award list |
FUS-STRAT-20240606 |
DOE Fusion Energy Strategy 2024 published; strategy clock | 2024-06-06; time not publicly stated | date; date_only_no_clock |
DOE release has Washington, D.C. dateline and identifies a White House event; exact release/event locus and time unresolved | occurred; strategy and related funding opportunity announced |
Strategy publication, event, funding opportunity and later award are distinct clocks | DOE strategy release |
FUS-MILESTONE-TIA-PUB-20240606 |
DOE announces all eight Milestone TIAs signed June 3–5 | 2024-06-06; individual agreements dated within 2024-06-03–05; times not stated | announcement date; agreement window; date_only_no_clock / bounded_source_window |
DOE online publication; signature places unresolved | occurred; eight executed program agreements publicly established |
Announcement is not a milestone review or payment; signature window is not a single event instant | DOE strategy and agreement announcement |
FUS-LAW-20240709 |
ADVANCE Act section 205 enacted | 2024-07-09; time not publicly stated | date; date_only_no_clock |
Exact signature site not established in the enacted record | occurred; fusion definitions amended and NRC rulemaking deadline created |
Not a completed rule or project license | P.L. 118-67 |
FUS-REALTA-WHAM-20240715 |
WHAM first plasma; physical experiment | 2024-07-15; time not publicly stated | date; date_only_no_clock |
Physical Sciences Laboratory, Stoughton, Wisconsin | occurred; first plasma in the 17 T mirror machine |
Not scientific/engineering gain, electricity or a private power plant | UW–Madison |
FUS-CFS-LIC-20241024 |
CFS reports Massachusetts grant of SPARC broad-scope radioactive-materials license | 2024-10-24; issuance time not publicly stated in checked release | date; date_only_no_clock |
Massachusetts Agreement-State regulatory object; SPARC site Devens | occurred as company-reported license grant |
Exact agency issuance clock, operative terms, amendments, inspections and first-plasma authorization remain separate | CFS license announcement |
FUS-NIF-20250407 |
NIF record-yield shot; physical experiment | 2025-04-07, “shortly after 4 a.m.” local facility time | datetime; approximate_source; timezone not printed, derived as PDT / America/Los_Angeles |
NIF, LLNL, Livermore, California | occurred; 8.6 MJ yield and target gain 4.13 later reported |
No exact minute/second; do not normalize “shortly after” to 4:00 a.m.; target gain is not facility/grid gain | LLNL shot account |
FUS-ASSET-20250527 |
Secretary Wright visit used as later DOE card-photo provenance | 2025-05-27; time not publicly stated | date; date_only_no_clock |
Matter in Extreme Conditions instrument, SLAC National Accelerator Laboratory, Menlo Park, California | occurred; identifies the earlier source image |
Not an August 15 facility event or a fusion-state change | SLAC photo record |
FUS-CFS-GOOGLE-20250630 |
CFS/Google 200 MW PPA publicly announced | 2025-06-30; signature and publication times not publicly stated | date; date_only_no_clock |
ARC project is proposed in Chesterfield County, Virginia; agreement-signature locus unresolved | occurred; company-reported commercial offtake object |
Not construction, generation, interconnection or delivery | CFS announcement |
FUS-TYPEONE-PSS-PUB-20250722 |
Type One/TVA Power Service Shops contracts release; publication clock | 2025-07-22, 4:13:40 p.m. EDT; UTC 20:13:40Z |
datetime; exact_second; America/New_York |
Online publication; Knoxville dateline is not proof of publication origin | occurred; limited fabrication/welding contracts publicly announced |
Underlying execution times unresolved; not Infinity Two construction | Type One release |
FUS-TYPEONE-LOI-PUB-20250919 |
Type One/TVA letter-of-intent release; publication clock | 2025-09-19, 8:36:27 p.m. EDT; UTC 2025-09-20T00:36:27Z |
datetime; exact_second; America/New_York |
Online publication; Oak Ridge dateline is not proof of publication origin | occurred; conditional deployment interest publicly announced |
LOI signature/issuance time unresolved; not a PPA, TVA Board authorization or plant approval | Type One release |
FUS-CFS-MAGNET-20250930 |
CFS reports DOE validation of full-scale SPARC TF magnet milestone and $8M payment | 2025-09-30; validation and payment times not stated | date; date_only_no_clock |
CFS/DOE administrative and technical loci unresolved; SPARC at Devens | occurred as company-reported DOE verification/payment |
Not SPARC first plasma, gain or ARC plant performance | CFS announcement |
Section 2 of 3
| FUS-RMAP1-20251016 | Fusion S&T Roadmap Part I public unveiling | 2025-10-16; time not publicly stated | date; date_only_no_clock | DOE release associates the week's Fusion Enterprise events with Washington, D.C.; exact release/event locus unresolved | occurred; first roadmap part published | Not Roadmap Part II, an award or construction authorization | DOE Part I release |
| GEN-EO-20251124 | EO 14363 signed/dated; Genesis establishment clock | 2025-11-24; signature time not publicly stated | date; date_only_no_clock | Official text carries “THE WHITE HOUSE”; physical signing location not independently established | occurred; Genesis Mission chartered | Signature, OFR filing and Federal Register publication are separate | Official EO text |
| GEN-OFR-20251126 | EO 14363 filed for public inspection | 2025-11-26, 11:15 a.m. ET | datetime; exact_minute; EST / America/New_York; UTC 16:15Z | Office of the Federal Register, Washington, D.C. administrative locus | occurred; public-inspection filing clock | Not the President's signature or the November 28 publication | Official EO notice |
| GEN-FR-20251128 | EO 14363 Federal Register publication | 2025-11-28; publication day, no distinct release instant stated | date; date_only_no_clock | Federal Register publication / Washington, D.C. legal locus | occurred; official publication | Not the November 24 establishment/signature clock | Federal Register |
| FUS-THEA-DESIGN-20260113 | Thea reports DOE certification/approval of Helios preconceptual design | 2026-01-13; DOE decision and publication times not publicly stated | date; date_only_no_clock | Company online publication; underlying DOE review locus unresolved | occurred as company-reported DOE design milestone | Not an operating Eos/Helios machine, license, site, electricity or standalone DOE action record | Thea release |
| FUS-APPROP-20260123 | FY2026 Fusion Energy Sciences appropriation enacted within P.L. 119-74 | 2026-01-23; time not publicly stated | date; date_only_no_clock | Exact signature site not established in the enacted record | occurred; FES account funding enacted | House passage Jan. 8, Senate passage Jan. 15, presentation Jan. 22 and enactment Jan. 23 are separate; FY label is not enactment | P.L. 119-74 |
| FUS-LIC-20260129 | Type One / Bull Run initial byproduct-material application reported submitted | 2026-01-29; filing time not public | date; date_only_no_clock | Filing locus unresolved; Nashville is the release dateline; Bull Run near Clinton, Tennessee is the project site | occurred as company-reported initial submission | No TDEC receipt timestamp, completeness finding, disposition, license or operation | Type One release |
| FUS-TYPEONE-APP-PUB-20260129 | Type One initial-application announcement; publication clock | 2026-01-29, 9:36 a.m. EST; UTC 14:36Z | datetime; exact_minute; America/New_York | Online publication; Nashville dateline is not proof of publication origin | occurred; exact communications clock for the company-reported submission | Not the filing/receipt instant, completeness, disposition or license | Type One release |
| GEN-CHALLENGES-20260212 | DOE publicly announces 26 Genesis challenges | 2026-02-12; publication time not publicly stated | date; date_only_no_clock | Online DOE publication; physical publication origin not established | occurred; challenge set publicly announced | Does not reveal internal submission/review timestamps or prove IOC | DOE announcement |
| FUS-NRC-DOC-20260223 | NRC proposed-rule document dated | 2026-02-23; time not applicable/not stated | date; date_only_no_clock | NRC document locus; no physical act established by the document date alone | occurred as the agency document date | Not public inspection, publication, finalization or effectiveness | Official notice text |
| FUS-NRC-OFR-20260225 | NRC proposal filed for public inspection | 2026-02-25, 8:45 a.m. ET | datetime; exact_minute; EST / America/New_York; UTC 13:45Z | Office of the Federal Register, Washington, D.C. administrative locus | occurred; exact public-inspection filing | Not NRC adoption, February 26 publication, a final rule or effective rule | GovInfo notice · NARA filing procedure |
| FUS-NRC-PUB-20260226 | NRC fusion-machine proposed rule published | 2026-02-26; no distinct publication time stated | date; date_only_no_clock | Federal Register / Washington, D.C. legal-publication locus | occurred; proposed framework opened for comment | Proposal is not final or effective and does not issue a project license | GovInfo notice |
| FUS-TN-RULE-FILE-20260311 | Tennessee fusion-rule filing received by Secretary of State | 2026-03-11, 10:37 a.m.; source timezone not stated | datetime; exact_minute text with unresolved zone | Filing form names Division of Publications, Nashville; physical/electronic receipt mode unresolved | occurred; Sequence 03-11-26, Rule IDs 10543–10549 received | No defensible UTC conversion; not the June 9 effective clock or a project license | Tennessee filing |
| FUS-CFS-PJM-20260428 | CFS announces ARC/Fall Line PJM interconnection application | 2026-04-28; application/announcement time not publicly stated | date; date_only_no_clock | Proposed plant Chesterfield County, Virginia; PJM receipt locus/time unresolved | occurred; company application publicly established and PJM confirmed fusion among Cycle 1 applicants next day | Not queue validation, study, interconnection agreement, synchronization or export | CFS announcement · PJM confirmation |
| FUS-ZAP-DESIGN-20260519 | Zap reports DOE approval of about-50-MWe-net-per-module preconceptual design | 2026-05-19; DOE decision and publication times not publicly stated | date; date_only_no_clock | Company online publication; DOE review locus unresolved | occurred as company-reported DOE design milestone | Not a built module, selected site, license, gain or generated electricity | Zap release |
| FUS-NRC-CLOSE-20260527 | NRC proposal comment period closes | 2026-05-27; no universal deadline hour stated | date; date_only_no_clock | Distributed submission routes; 4:15 p.m. Rockville cutoff applies only to hand delivery | occurred; comment-period calendar date reached | Never infer 11:59 p.m.; submission-mode-specific cutoffs must remain separate | GovInfo notice |
| FUS-TN-ANN-20260601 | Tennessee announces its June 9 fusion regulations | 2026-06-01, page displays 9:00 a.m.; timezone not stated | datetime; exact_minute text with unresolved zone | TDEC online publication; physical origin not established | occurred; announcement published | Do not assume Central Time or turn Nashville into the online-publication locus | TDEC release |
| FUS-XCIMER-PHOENIX-20260603 | Xcimer announces start of Phoenix laser-prototype operations | 2026-06-03; operating-start and publication times not publicly stated | date; date_only_no_clock | Phoenix laser bay, Denver, Colorado | occurred; integrated excimer amplification/compression platform operating above 1 kJ | Not a fusion shot, ignition, gain, heat or electricity | Xcimer release |
| GEN-JP-20260604 | U.S.–Japan Genesis partnership publicly announced | 2026-06-04; time not publicly stated | date; date_only_no_clock | DOE online publication; physical release/signing locus not established | occurred; planned five-year partnership announced, subject to appropriations | Not an appropriation, executed project award or operating capability | DOE announcement |
| FUS-THEA-TWIN-20260608 | Thea announces Helios digital-twin and AI-surrogate collaboration | 2026-06-08; publication time not publicly stated | date; date_only_no_clock | Distributed company, NVIDIA, Synopsys, Argonne and PPPL design/model work | occurred; named fusion AI/model collaboration established | Not Genesis IOC, DCP operating proof or plant performance | Thea release |
| FUS-RMAP2-20260609 | Finalized Fusion S&T Roadmap / Part II publicly released | 2026-06-09; release time not publicly stated | date; date_only_no_clock | DOE body dateline WASHINGTON—; Washington, D.C. is an institutional/dateline anchor, not a proven CMS-device location | occurred; finalized strategy published | No exact public-release time; webpage and PDF metadata clocks below are different objects | DOE release · Roadmap |
| FUS-TN-EFF-20260609 | Tennessee Chapter 0400-20-14 becomes effective | 2026-06-09; exact effective time not stated | date; date_only_no_clock | Statewide Tennessee legal effect; no single physical event location | occurred; Agreement State fusion-machine framework effective | Never infer midnight as historical effect; not an issued Bull Run license | TDEC release |
| FUS-XCIMER-DESIGN-20260610 | Xcimer reports DOE approval of Athena preconceptual design and roadmap | 2026-06-10; DOE decision and publication times not publicly stated | date; date_only_no_clock | Company online publication; DOE review locus unresolved | occurred as company-reported DOE design milestone | Not Phoenix fusion operation, Vulcan engineering breakeven, a site/license or 400 MWe generation | Xcimer release |
| FUS-REALTA-DEC-20260619 | WHAM direct-energy-conversion experiment; physical event | 2026-06-19; experiment time not publicly stated | date; date_only_no_clock | WHAM, Physical Sciences Laboratory, Stoughton, Wisconsin | occurred; multiple amps at about 100 volts converted from plasma kinetic energy | Mostly recovered supplied input power; expressly not net electricity or large-scale conversion of fusion-born power | Realta technical account |
| FUS-NIF-20260620 | NIF eleventh ignition; physical experiment | 2026-06-20; shot time not publicly stated | date; date_only_no_clock | NIF, LLNL, Livermore, California | occurred; 7.9 ± 0.4 MJ and target gain about 3.8 reported | Shot ID, time and zone unresolved; target gain is not facility/grid gain | NIF ignition record |
| FUS-REALTA-DEC-PUB-20260630 | Realta DEC press-release publication | 2026-06-30, 7:00 a.m. ET; UTC 11:00Z | datetime; exact_minute; EDT / America/New_York | Online publication; physical publication origin not stated | occurred; exact communications clock for the June 19 result | Not the physical experiment time | PRNewswire release |
| FUS-REALTA-FORGE-PUB-20260715 | Realta Forge/Hammir site and incentives announcement | 2026-07-15, 8:00 a.m. ET; UTC 12:00Z | datetime; exact_minute; EDT / America/New_York | Project site OM Station, Madison, Wisconsin; online publication origin not stated | occurred; site/incentive plan publicly announced | Not groundbreaking, construction, commissioning or a power-plant site | PRNewswire release · WEDC |
| GEN-FUSION-SELECT-20260722 | Genesis project selections include named fusion/DCP work | 2026-07-22; publication time not publicly stated | date; date_only_no_clock | Distributed project portfolio; no single operating locus | occurred; selection for award negotiations | Not an executed OTA/FWP, obligation, platform access, workflow or physical result | DOE release · project list |
| FUS-X-20260815 | DOE Energy Without Limits root post; online publication | 2026-08-15, 1:34:04.501 p.m. EDT; UTC 17:34:04.501Z | datetime; exact_second plus milliseconds deterministically derived from X Snowflake ID; America/New_York is display conversion | Online publication; no geo, place or coordinates; physical origin unknown | occurred; official communications activation | Not a new experiment, roadmap, award, facility, license or electricity event; Washington is only the wheel convention, not posting provenance | DOE root post · X Snowflake documentation |
| GEN-IOC-20260821 | Genesis IOC-seeking calendar target derived from 270 days after EO date | 2026-08-21; no hour or ceremony stated | conditional; date_only_no_clock; derived calendar date | DOE/national platform; operating locus to be identified by any completion record | scheduled; source directs DOE to seek to demonstrate IOC, subject to appropriations | Not an occurred event or proof that fusion is the selected challenge | EO 14363 |
| SCI-PLAN-20261019 | Qualifying-agency implementation plans due; 90-day derived date | 2026-10-19; no hour stated | conditional; date_only_no_clock; derived calendar date | Submission/receiving locus unresolved | scheduled; implementation-plan clock | Verify OMB interpretation, extensions and actual receipt before marking delinquent or complete | NSTM-5 / M-26-16 |
| GEN-REPORT-20261124 | First Genesis annual report due | 2026-11-24; no hour stated | conditional; date_only_no_clock; one-year deadline | DOE/White House reporting locus unresolved | scheduled; annual reporting clock | Public release is not guaranteed and would be a separate publication clock | EO 14363 |
| FUS-NRC-DEADLINE-20271231 | ADVANCE Act NRC technology-inclusive rulemaking deadline | 2027-12-31; no hour stated | conditional; date_only_no_clock | NRC federal rulemaking / Washington, D.C. legal locus | scheduled; statutory completion deadline | Final-rule adoption, publication and effective date remain separate; Agreement State clocks continue independently | P.L. 118-67 |
| FUS-PILOT-2031-2035 | DOE pilot-plants-delivering-electrons target window | 2031–2035; no day/time | conditional; year window; not_applicable_partial_date | Named project/site not yet identified | scheduled target window, not an occurred event | No point chart; wait for a named award, site, build, commissioning, synchronization or metered-delivery event | DOE roadmap |
Section 3 of 3
The three posts are one atomic communications event anchored to the root post. The reply clocks are preserved for sequence reconstruction, not promoted as three separate campaign launches.
| Order / cards | X status ID | UTC creation | Washington display | Relationship |
|---|---|---|---|---|
| Root / cards 1–2 | 2088680637729316925 |
2026-08-15T17:34:04.501Z |
2026-08-15 1:34:04.501 p.m. EDT |
Thread root and canonical event clock |
| Cards 3–4 | 2088680640149426639 |
2026-08-15T17:34:05.078Z |
2026-08-15 1:34:05.078 p.m. EDT |
Reply to root; +0.577 seconds |
| Card 5 | 2088680649326485551 |
2026-08-15T17:34:07.266Z |
2026-08-15 1:34:07.266 p.m. EDT |
Reply to post 2; complete chain +2.765 seconds |
X's direct syndication created_at fields are whole-second values. The
millisecond values above are deterministically decoded from the official 64-bit
Snowflake IDs using X's documented epoch. All three official payloads omit
geo, place and coordinates.
## Roadmap webpage and file metadata — not the release clock
These exact timestamps are retained because they may help future provenance
work. None should replace FUS-RMAP2-20260609 as the public-release record.
| Metadata object | UTC | Washington display | Ruling |
|---|---|---|---|
DOE HTML datePublished / CMS node creation |
2026-06-04T20:19:25Z |
2026-06-04 4:19:25 p.m. EDT | Page preparation/CMS creation; conflicts with visible June 9 release date and is not a defensible release clock |
DOE HTML dateModified |
2026-06-10T01:44:14Z |
2026-06-09 9:44:14 p.m. EDT | Exact page-modification clock; may be charted only if explicitly labeled as webpage modification |
| Current roadmap PDF XMP creation | 2026-06-11T15:59:13Z |
2026-06-11 11:59:13 a.m. EDT | Later file-production clock; not release |
| Current roadmap PDF XMP modification | 2026-06-15T19:11:27Z |
2026-06-15 3:11:27 p.m. EDT | Later file-revision clock; not release |
Current PDF HTTP Last-Modified |
2026-06-15T20:19:17Z |
2026-06-15 4:19:17 p.m. EDT | Server/file metadata; not release |
The former chart-readiness overlay is preserved in Chronicle Astrology Files at
03 - Astrology/Astrology Files/Mundane Story Overlaps/Federal Fusion Chart Readiness 2020-2035.md.
This Research copy retains only factual clocks, source precision, places,
unknowns and retrieval questions.
9:00 a.m. display.## Promotion and interpretation firewall
clock_id; it does not
silently rewrite an approximate or date-only source into an exact event.