.md · 1 sections · 1794 characters
workbench: _Working/federal-budget-2026-2027/goal/terra_institutions/material_drivers/batch4/REPORT.md
Canonical source SHA-256: d01fd480fbb966554a69e2f929414785e80962dddfe039ca0b7d3dada777e660
Served copy SHA-256: d01fd480fbb966554a69e2f929414785e80962dddfe039ca0b7d3dada777e660
Owner evidence cutoffs: {"federal-budget-fy2026-fy2027": "2026-09-11T19:55:13-04:00"}
These are package-level cutoffs, not a claim that this source was rechecked on those dates. Use its own publication and capture dates.
Owners: federal-budget-fy2026-fy2027
Section 1 of 1
# NASA FY2027 material-driver screen
NASA’s official request index dates the FY2027 summary and fact sheet to April 3, 2026, and the 384-page full request to April 22, 2026. The full request’s BUD-1 budget-authority table uses FY2026 enacted as its comparator and reports NASA total funding declining from $24.4383B to a $18.8291B request, a $5.6092B decrease. This is a request, not an enactment. Its Working Families Tax Cut tables separately show mandatory funding planned for obligation, so those obligations are not folded into the annual budget-authority deltas.
The three largest absolute account movements are Science (-$3.3561B), Space Operations (-$1.1278B), and Safety, Security, and Mission Services (-$1.0014B). NASA gives a genuine portfolio narrative for Science, but it does not allocate the reduction to particular decadal surveys, policies, or model outputs. For Space Operations, it identifies an HRP transfer and separately preserves $250M in WFTC planned obligations in both years, but neither item reconciles the whole annual BA decrease. SSMS is particularly unresolved: the account page says there are no major changes despite the $1.0014B reduction; only a following IT subprogram page describes restructuring and cost optimization without a quantified account-level link.
Exploration is fourth by absolute movement but is included as a near-cut because it is the only major increase (+$730.9M). NASA links it to Artemis, commercial transportation, lunar-base/Mars capabilities, and previously appropriated WFTC resources. That rationale should not be read as proof that the separately tabulated mandatory obligations caused or equal the annual BA increase. The staged receipt identifies the next decision/crosswalk sources needed to account for each remaining gap.