Skip to content
Browse the whole research Library · Start page for AI agents ·

batch5 — FY2027 C-1: physical PDF pages 300–374

.md · 1 sections · 1532 characters

Source, owner, and dates

workbench: _Working/federal-budget-2026-2027/goal/terra_institutions/defense/c1/batch5/REPORT.md

Canonical source SHA-256: 1cb479ae3b00f70eab0ef89ae80048fae65e8f011ee31022fb401505ce8be87a

Served copy SHA-256: 1cb479ae3b00f70eab0ef89ae80048fae65e8f011ee31022fb401505ce8be87a

Owner evidence cutoffs: {"federal-budget-fy2026-fy2027": "2026-09-11T19:55:13-04:00"}

These are package-level cutoffs, not a claim that this source was rechecked on those dates. Use its own publication and capture dates.

Owners: federal-budget-fy2026-fy2027

complete text

FY2027 C-1: physical PDF pages 300–374

Section 1 of 1

# FY2027 C-1: physical PDF pages 300–374

This receipt fully reads one-based physical PDF pp. 300–374 of the 450-page official FY2027 Military Construction and Family Housing C-1 (pypdf indices 299–373). Physical p. 365 is intentionally blank. Pages 375–450 remain unread.

The range moves through FY2026 facility-type/project tables explicitly labeled as Enacted, FY2027 facility-type summaries, FY2027 project listings explicitly labeled as Requested, and a FY2026 reconciliation summary. The headers matter: some FY2027 summary pages only say “For 2027,” while the following project tables say “as Requested.” The receipt does not convert either into evidence of enactment.

The FY2027 total construction-program table prints $38.184 billion authorization, $31.338 billion authorization for appropriations, and $31.250 billion each for appropriation amount and TOA. The facility categories and named projects explain the exhibit’s allocations, not their supporting requirements or cost methods. No separately named upstream study, audit, strategy, model, estimate, statute, or decision record appears in this scope.

FY2026 reconciliation tables report a $4.896 billion reconciliation total, but do not identify the underlying authority or methodology. That support, individual project records, and C-1 pp. 375–450 remain queued. Exact locators are in DEFENSE_FY2027_C1_P300_P374_RECEIPT.json.