Skip to content
Browse the whole research Library · Start page for AI agents ·

DEFENSE FY2027 MANDATORY OVERVIEW RECEIPT

.json · 1 sections · 8793 characters

Source, owner, and dates

workbench: _Working/federal-budget-2026-2027/goal/terra_institutions/defense/mandatory_funding_overview/DEFENSE_FY2027_MANDATORY_OVERVIEW_RECEIPT.json

Canonical source SHA-256: da7036801d6cb329669c0eb80c5b2dd3fd259577bb64240f04915ead52652e74

Served copy SHA-256: da7036801d6cb329669c0eb80c5b2dd3fd259577bb64240f04915ead52652e74

Owner evidence cutoffs: {"federal-budget-fy2026-fy2027": "2026-09-11T19:55:13-04:00"}

These are package-level cutoffs, not a claim that this source was rechecked on those dates. Use its own publication and capture dates.

Owners: federal-budget-fy2026-fy2027

complete text

Opening section

Section 1 of 1

{ "receipt_type":"staged_full_document_research", "source":{"title":"Department of War Fiscal Year 2027 Mandatory Budget Overview","url":"https://comptroller.war.gov/Portals/45/Documents/defbudget/FY2027/DoW_FY2027_Mandatory_Funding_Overview.pdf","pdf_pages":28,"pdf_page_labels":"P0-P27","document_date":"April 2026","generated_string":"2026Apr21 RefID: 1-449FB362; generator string is not independently verified publication/transmittal date","read_status":"full text read P0-P27, including three-page Appendix B attachment","accessed":"2026-09-11"}, "accounting_status":{"FY27_mandatory":"$350.0B request; document ends 'PB 27 Reconciliation Request', not enacted authority","FY27_total_topline":"$1.450T = $1.100T requested discretionary resources + $350.0B mandatory request","document_comparator_limit":"this document does not itself furnish an FY26 enacted comparison table; do not call its allocations enacted","accounting_unit":"main tables are $ millions; Appendix B underlying line items are $ thousands","rounding":"many tables say totals may not add due to rounding"}, "section_request_totals_millions":{"Defense Industrial Base":113105,"Homeland Defense and Golden Dome":17528,"Maritime Superiority":7654,"Munitions":47022,"Air Superiority":14430,"Space Superiority":11725,"Next Generation Technology and Autonomy":102500,"Warrior Ethos":36038,"Grand Total":350000}, "appropriation_allocation_millions":{"Army":37732.6,"Navy":38814.2,"Air Force":28210.4,"Defense-Wide":245242.8,"Grand Total":350000.0,"defense_wide_examples":{"COMP":3138.9,"O&M Defense-Wide":15977.5,"DPAP":29954.1,"Defense Strategic Capital Credit Program":20000,"Procurement Defense-Wide":39389.9,"Golden Dome Fund":17120.2,"RDT&E Defense-Wide":100507.2,"MILCON Defense-Wide":407,"National Defense Stockpile Transaction Fund":18000,"WCF Defense-Wide":748}}, "program_request_and_assumption_inventory": [ {"section":"DIB","pages":"3-6","request":"$113.105B","subtotals":"Critical Minerals $48.675B; DPAP $23.594B; IBAS $16.332B; OSC loan program $20B; Acquisition Modernization $1.919B; NSIF $1B; GRI $896M; JETO $500M; EDU $189M","assumptions_and_limits":"Critical Minerals footnote already includes IBAS $24.315B, DPAP $6.360B, and NDS $18B. Thus those nested component values must not be added again to the table-row total. Claims of shortfalls, 50+ commodities, unit-cost reduction, and demand need underlying analyses."}, {"section":"DIB","pages":"4-6","request":"OSC $20B credit subsidy against collective $200B lending authority provided by P.L.119-21; NSIF seed $1B","assumptions_and_limits":"NSIF expects future capitalization from asset monetization and investment returns and says no outyear appropriations needed; no valuation, cash-flow, eligibility, default, subsidy, or return model is disclosed. JETO says it will mature/validate advanced M&S; underlying models unavailable."}, {"section":"Homeland Defense/Golden Dome","pages":"7","request":"$17.528B total: GDA Fund $17.121B; Defense-Wide MILCON $217M early-detection radar; $190M unspecified minor construction","assumptions_and_limits":"implements EO14186 and is said aligned with 2026 NDS. Higher-classification details prevent complete public evidence audit; no cost/schedule/risk model supplied."}, {"section":"Maritime","pages":"8-9","request":"$7.654B","subtotals":"Advanced Shipbuilding/Future Ship Experimental $1.850B; LSM $1.698B; Surface Ship MIB $1.655B; SIB contract incentives $1.440B; T-AH(X) $650M; SIB $206M; Maritime Firepower $105M; MUSV $50M","assumptions_and_limits":"$1.850B includes studies of allied shipbuilders and separate future CruDes/frigate study/procurement efforts; no study publications. SCALE is a multi-year investment with future increments not quantified."}, {"section":"Munitions","pages":"10-13","request":"$47.022B","assumptions_and_limits":"MAC identifies 12 legacy munitions and two emerging capabilities. Department says framework agreements lock pricing and private-capital mechanisms lower unit costs; agreements, price baselines, production assumptions, contract terms, and independent cost estimates are absent. Several details are higher classified. CPS/LRHW cites technical analysis, threat mitigation, modeling/analysis, cyber design and survivability work but names no model/report."}, {"section":"Air","pages":"14-16","request":"$14.430B","key_claim":"$759M F-35 full funding is tied to annual cost-estimate 2025 cost position; $324M accelerates 200 Block-4 kits one year (2031 to 2030)","assumptions_and_limits":"named 2025 cost position is not identified/published. F/A-XX details classified; cost/schedule estimates are not supplied."}, {"section":"Space","pages":"17","request":"$11.725B","assumptions_and_limits":"SB-AMTI, Space Data Network, vendor on-ramping, and low-band development detail mostly higher classified; no public threat model, vendor assessment, or cost estimate supplied. Table label says 'Total Air Superiority' but section and components are Space Superiority; retained as apparent document labeling error."}, {"section":"Next Generation Technology/Autonomy","pages":"18-19","request":"$102.500B: Drone Dominance $53.6B; Sovereign AI $46B; AI-enabled deterrence $2.4B; AI pace-setting $500M","assumptions_and_limits":"Drone nested requirements total $53.6B. Sovereign-AI rationale asserts fragmented GPU clusters are inefficient/unsustainable; no utilization/cost model. AI-enabled deterrence details classified; PSP outcomes are prospective."}, {"section":"Warrior Ethos","pages":"20-21","request":"$36.038B: poor/failing facilities $29.939B; barracks funding reform $5.229B; school-choice vouchers $870M","assumptions_and_limits":"claims it will mitigate all poor/failing barracks and fund 100% sustainment requirement. Barracks reform invokes existing and proposed authorities without identifying them. Voucher estimate assumes $15,500/student and about 11,000 dependents; no eligibility, uptake, or cost model disclosed."}, {"section":"Appendices","pages":"22-27","content":"Appendix A apportions request by military department and appropriation; Appendix B provides unclassified line items, account/BLI/quantity where shown, and ends with Grand Total PB27 Reconciliation Request $350B.","assumptions_and_limits":"line-item display is a request/crosswalk, not enacted execution data or a supporting cost model."} ], "individually_named_upstream_sources": [ {"source":"P.L. 119-21","pages":"4","role":"collective $200B OSC lending authority","status":"not read; document does not identify which provisions govern $20B credit subsidy"}, {"source":"Executive Order 14196, A Plan for Establishing a United States Sovereign Wealth Fund","pages":"5","role":"stated NSIF implementation policy","status":"not read"}, {"source":"Executive Order 14186, The Iron Dome for America","pages":"7","role":"directs Golden Dome capabilities described","status":"not read"}, {"source":"2026 National Defense Strategy","pages":"7","role":"Golden Dome alignment","status":"not read"}, {"source":"President’s Restoring America’s Maritime Dominance Executive Order","pages":"8","role":"stated maritime policy alignment","status":"EO number/date omitted; not independently identifiable from document"}, {"source":"Executive Order 14191, Expanding Educational Freedom and Opportunity for Families","pages":"21","role":"stated voucher-policy consistency","status":"not read"}, {"source":"annual cost estimate 2025 cost position","pages":"15","role":"F-35 full-funding quantity basis","status":"unidentified source/document; not read"} ], "named_mechanisms_or_unnamed_source_families_not_promoted_to_documents": [ {"name":"MAC priority determination and vendor framework agreements","pages":"4,10-13","reason":"decision/contract family; individual priorities/contracts absent"}, {"name":"SCALE, JETO M&S, tests/evaluations, AI architecture and PSPs","pages":"5,9,13,18-19","reason":"program/process/model families without individual study/model identifiers"}, {"name":"critical-material risks, active shortfalls, 50+ commodities, poor/failing barracks inventory, 100% requirement","pages":"3,20","reason":"assertions/unnamed datasets; no source publication cited"}, {"name":"higher-classification details","pages":"7,12,15,17,19","reason":"access limitation, not evidence of an available unclassified source"} ], "next_queue":["If directed, identify and read the exact laws/EOs and P.L.119-21 spend-plan/OSC authority before assessing legal availability.","Obtain published cost estimates, production agreements, threat/requirements analyses, facility-condition inventory, and subsidy/return modeling before evaluating claimed savings, capacity, completion, or affordability."] }