Skip to content
Browse the whole research Library · Start page for AI agents ·

DOE FY2027 NWD ACCESS AND NNSA OVERVIEW PARTIAL RECEIPT

.json · 1 sections · 5850 characters

Source, owner, and dates

workbench: _Working/federal-budget-2026-2027/goal/terra_process/doe/batch14/DOE_FY2027_NWD_ACCESS_AND_NNSA_OVERVIEW_PARTIAL_RECEIPT.json

Canonical source SHA-256: 0a8896d2e1fa661d74c3239f8afe3394a7c8b8faae39d17e28a9589329ae9579

Served copy SHA-256: 0a8896d2e1fa661d74c3239f8afe3394a7c8b8faae39d17e28a9589329ae9579

Owner evidence cutoffs: {"federal-budget-fy2026-fy2027": "2026-09-11T19:55:13-04:00"}

These are package-level cutoffs, not a claim that this source was rechecked on those dates. Use its own publication and capture dates.

Owners: federal-budget-fy2026-fy2027

complete text

Opening section

Section 1 of 1

{ "package":"DOE FY2027 Nuclear Waste Disposal access receipt and NNSA Overview bounded review", "created":"2026-09-11", "documents":[ {"source_id":"doe_fy27_nuclear_waste_disposal","title":"Nuclear Waste Disposal FY 2027 Congressional Justification","url":"https://www.energy.gov/documents/doe-fy-2027-volume-3-nwd","role":"remaining DOE component CJ","status":"official URL resolved but unavailable for reading in this batch","access_receipt":{"attempt_date":"2026-09-11","official_response":"503 Service Unavailable from the DOE document URL","pages_examined":0},"limits":"URL resolution is not content review. No budget, legal, or program claim is made from this unavailable source."}, {"source_id":"doe_fy27_nnsa_overview","title":"National Nuclear Security Administration Overview FY 2027 Congressional Justification","url":"https://www.energy.gov/documents/doe-fy-2027-volume-1-nnsa-overview","role":"NNSA-wide request/formation summary, projects, and contractor table","status":"substantive-content partial read; final pages unavailable in reader","page_coverage":"Official web PDF reports 79 pages. Sequential review covered cover and PDF pages 1-75; final pages 76-78 could not be rendered after a cache-miss. This is not a full-document receipt.","budget_basis":{"fy2025_enacted_millions":24135.0,"fy2026_enacted_millions":25404.0,"working_families_tax_cut_act_millions":3885.0,"fy2027_request_millions":32801.543,"fy2027_vs_fy2026_millions":7397.543},"formation_and_accounting_boundaries":[{"locator":"PDF p1","claim":"Overview says WFTC P.L. 119-21 provided $3.885b, most to be obligated in FY2026; FY2027 request is separately $32.801543b.","boundary":"WFTC amount is additional statutory funding, not a component of the FY2027 request comparison."},{"locator":"PDF p1,p4","claim":"Naval Reactor comparisons exclude mandated Advanced Test Reactor transfers ($92.8m FY2025; $96.7m FY2026).","boundary":"NR numbers must be compared on this adjusted basis; no transfer execution was validated."},{"locator":"PDF p3","claim":"$10m WFTCA spent-fuel-reprocessing evaluation appropriation is unallocated while DOE/NNSA determines execution method consistent with congressional intent.","boundary":"appropriation exists per CJ but no allocation or execution is established."},{"locator":"PDF p2-p5","claim":"Overview combines FSE, Weapons Activities, DNN, and NR appropriation presentations and repeats component-level requests.","boundary":"it is a summary/formation document, not replacement evidence for each component CJ."}],"named_inputs_and_references":[{"title":"Energy and Water Development; and Interior and Environment Appropriations Act, 2026","citation":"P.L. 119-074","issuer":"Congress","locator":"PDF p2","role":"listed authorization/appropriations context","status":"not separately read."},{"title":"Working Families Tax Cut Act","citation":"P.L. 119-21","issuer":"Congress","locator":"PDF p1-p2","role":"additional funding/legal context","status":"not separately read."},{"title":"Full-Year Continuing Appropriations and Extensions Act, 2025","citation":"P.L. 119-4","issuer":"Congress","locator":"PDF p2","role":"listed appropriation context","status":"not separately read."},{"title":"Annual assessment and report to President and Congress on stockpile reliability","issuer":"NNSA","locator":"PDF p7","role":"stated SRT&E assessment input/output","status":"no edition/URL supplied; report not read."},{"title":"Nuclear Weapons Council direction","issuer":"Nuclear Weapons Council","locator":"PDF p8","role":"stated direction for Rapid & Advanced Capabilities","status":"underlying directives not cited/read."},{"title":"Department of War requirements","issuer":"Department of War","locator":"PDF p7","role":"stated driver for production-modernization investment","status":"no requirements documents cited/read."},{"title":"NRC license application for DUECE pilot plant","issuer":"Nuclear Regulatory Commission","locator":"PDF p7","role":"planned license-application milestone","status":"planned action, not submitted/approved license; application not cited/read."},{"title":"Project TECs, schedules, percent-complete and contractor data","issuer":"NNSA","locator":"PDF p10-p75","role":"agency project/contractor accounting inputs","status":"tables were read through p75; underlying baselines, contracts, and cost-validation files were not reviewed."}],"limits":"Narrative and tables through p75 were examined, but final three pages were inaccessible. All FY2027 figures remain requests; project schedules/TECs and workforce/contractor statements are NNSA accounting/planning data, not independent validation or proof of construction/execution."} ], "updated_exact_39_coverage":{"initial_rows":39,"full_listed_targets":27,"partial_listed_targets":1,"access_unread_listed_targets":1,"unread_listed_targets":7,"parent_compilations_not_separately_read":3,"accounting":"27+1+1+7+3 = 39. Parent equivalence remains unverified."}, "remaining_component_queue":["Nuclear Waste Disposal — official URL 503 access gap","Weapons Activities — 375 pages","Power Marketing Administrations — 119 pages"], "remaining_summary_queue":["Summary Table by Appropriation (3 pages)","Summary Table by Organization (3 pages)","Statistical Table by Appropriation (18 pages)","Laboratory Tables (131 pages)","State Tables (94 pages)"], "separate_upstream_queue":["NNSA annual stockpile assessment/report","Nuclear Weapons Council/Department of War requirements","DUECE NRC license materials","NNSA project baselines, cost estimates, contracts, and WFTC execution records"], "limits":["No maintained package, ledger, vault, or application owner was edited.","The NWD access outcome must not be read as a claim about its contents.","Partial NNSA Overview coverage must not be upgraded to full without reviewing pages 76-78."] }