Skip to content
Browse the whole research Library · Start page for AI agents ·

DOE BASELOAD AIQ FORMATION LEGAL ACCOUNTING RECEIPT

.json · 1 sections · 9783 characters

Source, owner, and dates

workbench: _Working/federal-budget-2026-2027/goal/terra_human/material_completion_audit/doe_baseload_aiq_formation_batch1/DOE_BASELOAD_AIQ_FORMATION_LEGAL_ACCOUNTING_RECEIPT.json

Canonical source SHA-256: f9d01d461d222e938bd40fb7f16e76fcf435d762728b8d304d94c8205835286e

Served copy SHA-256: f9d01d461d222e938bd40fb7f16e76fcf435d762728b8d304d94c8205835286e

Owner evidence cutoffs: {"federal-budget-fy2026-fy2027": "2026-09-11T19:55:13-04:00"}

These are package-level cutoffs, not a claim that this source was rechecked on those dates. Use its own publication and capture dates.

Owners: federal-budget-fy2026-fy2027

complete text

Opening section

Section 1 of 1

{ "receipt_id": "terra_human_doe_baseload_aiq_formation_batch1", "date": "2026-09-12", "scope": "Bounded material bridge for DOE Baseload Power (doe_ae3c5d65ed60) and Office of Artificial Intelligence and Quantum (doe_5c42103cdd0a): request formation, proposed account/transfer language, current legal-stage boundary, and public-private-cost distinction. No cost-model reconstruction, project selection review, or canonical edit.", "maintained_legal_cutoff": "2026-09-11T19:55:13-04:00", "sources_used": [ { "source": "FY2027 Budget Appendix, Department of Energy", "url": "https://www.whitehouse.gov/wp-content/uploads/2026/04/doe_fy2027.pdf", "new_targeted_scope": "PDF physical pp. 6-7 (AIQ proposed appropriations language and program/financing); pp. 10-11 (Baseload proposed appropriations language and program/financing); pp. 46-48 (DOE proposed general provisions, especially §308 cancellation list).", "status": "Official request document; proposed language, not enrolled or enacted law." }, { "source": "DOE FY2027 Budget in Brief", "url": "https://www.energy.gov/documents/doe-fy-2027-budget-brief", "scope": "Official text read in the current web record: PDF physical pp. 3-5 / printed pp. 1-3, including the $3.5B Baseload presentation, $1.2B AIQ/Genesis presentation, and $15.2B proposed IIJA cancellation statement.", "status": "Official request presentation; no cost-allocation proof." }, { "source": "DOE FY2027 Baseload Power justification", "url": "https://www.energy.gov/documents/doe-fy-2027-volume-3-bp", "scope": "Prior parent-reviewed all six physical pages; reused, not newly credited. The existing source chain records reliability rationale, activity split, undesignated site detail, and no dollar-formula result.", "status": "FY2027 request justification." }, { "source": "DOE FY2027 AIQ justification", "url": "https://www.energy.gov/documents/doe-fy-2027-volume-4-aiq", "scope": "Prior parent-reviewed all four physical pages; reused, not newly credited.", "status": "FY2027 request justification." }, { "source": "FY2027 continuing resolution, P.L. 119-103", "url": "https://www.govinfo.gov/content/pkg/BILLS-119hr6500enr/html/BILLS-119hr6500enr.htm", "scope": "Maintained parent review: Division A §§101-111; live BUDGET_DATA and REFERENCE_COVERAGE record continuation of FY2026 rates/conditions and restrictive new-start defaults, with specified unrelated NNSA/WIPP exceptions.", "status": "Enacted legal framework through the maintained cutoff; this receipt does not claim a full exception census." }, { "source": "DOE Lux and Discovery partnership announcement", "url": "https://www.energy.gov/articles/energy-department-announces-new-public-private-partnership-model-two-supercomputers", "scope": "Prior parent-reviewed substantive announcement; reused only for partner/federal-cost distinction.", "status": "Announcement, not procurement or funding schedule." } ], "formed_request_bridge": { "Baseload": { "reference_id": "doe_ae3c5d65ed60", "request": "$3.500 billion, available until expended.", "proposed_account": "Baseload Power, identification code 089-2310-0-1-270; Appendix physical p.10 shows $3.500B FY2027 budget authority and p.11 shows $1.750B FY2027 estimated outlays.", "proposed_source_and_authority_text": "Appendix physical p.10 says the amount would be derived by transfer from unobligated Office of Clean Energy Demonstrations Regional Clean Hydrogen Hubs balances, cited to P.L.117-58 title III division J and Energy Policy Act §813 (42 USC 16151 et seq.).", "activity_and_delivery_direction": "The request identifies plant/equipment, transmission capacity, infrastructure upgrades and grid reliability; Appendix p.11 names coal/gas upgrades, grid upgrades, nuclear/hydropower uprates and geothermal. The full CJ further identifies proposed channels/partners and a five-part activity split, but leaves all site detail undesignated.", "evidence_role": "The July 2025 grid-reliability report is demonstrated rationale for the reliability problem, not a demonstrated calculation of $3.5B or selection model for activities.", "current_claim_disposition": "sufficient_for_Baseload_reliability_rationale_not_amount" }, "AIQ": { "reference_id": "doe_5c42103cdd0a", "request": "$1.200 billion, available until expended.", "proposed_account": "Artificial Intelligence and Quantum, identification code 089-2309-0-1-251; Appendix physical pp.6-7 shows $1.200B FY2027 budget authority, $240M FY2027 estimated outlays, and $1.200B obligations.", "proposed_source_and_authority_text": "Appendix physical pp.6-7 uses the same proposed source: transfer from unobligated Office of Clean Energy Demonstrations Regional Clean Hydrogen Hubs balances, citing P.L.117-58 title III division J and Energy Policy Act §813 (42 USC 16151 et seq.).", "activity_and_delivery_direction": "The proposed statutory text encompasses equipment, infrastructure upgrades and activities supporting public-private partnerships at national laboratories. The program text describes AIQ as DOE coordinator for AI/QIS and Genesis; the four-page CJ identifies supercomputing, shared infrastructure, workforce and performance tracking but does not allocate named laboratory amounts.", "evidence_role": "The request and Executive Order/Genesis context identify institutional direction. No reviewed empirical study, cost estimate, benchmark, or allocation model derives $1.2B.", "current_claim_disposition": "sufficient_for_AIQ_new_account_request_description" } }, "accounting_and_legal_state": { "combined_proposed_transfer": "$4.700B ($3.500B Baseload plus $1.200B AIQ) would be drawn from the same stated Regional Clean Hydrogen Hubs source under the proposed account language.", "separate_proposed_cancellation": "The same Appendix's DOE proposed general provision §308, physical p.47, separately lists permanent cancellation of $3,080,175,143 from unobligated Regional Clean Hydrogen Hubs balances. The bounded sources do not provide a balance ledger, sequence, or crosswalk reconciling that cancellation with the two proposed transfers. This is a material accounting limit, not evidence that any proposal could not occur.", "what_is_established_at_cutoff": "Both figures are April FY2027 request proposals with concrete proposed account and transfer text. P.L.119-103 generally continues FY2026 rates/conditions through the stated endpoint; the maintained review says its default new-start rules and identified exceptions do not themselves establish Baseload or AIQ authority.", "what_is_not_established_at_cutoff": [ "Enactment of the two proposed account/transfer provisions.", "Legal availability or actual unobligated balance in the cited source account on a transaction basis.", "An executed transfer, obligation, award, project selection, or outlay.", "Whether §308's listed cancellation and the two transfers were later altered, reconciled, or implemented." ], "legal_boundary": "Do not call the Appendix's §813 citation a stand-alone, preexisting transfer authority for either FY2027 account. The reviewed evidence establishes proposed appropriations language that cites §813; it does not independently construe §813 or prove an enacted transfer." }, "partner_vs_federal_cost": { "AIQ_federal_request": "The $1.200B is the proposed federal account amount, sourced in the request from an intra-DOE transfer; it is not a combined public-private investment total.", "AIQ_partner_context": "The proposed language permits activities supporting partnerships, but identifies no partner contribution or allocation. The separately parent-reviewed Lux/Discovery announcement reports more than $1B combined public-private investment without splitting federal share or annual amounts; Lux and Discovery use different arrangements. It cannot be used to validate, fund, or supplement the $1.2B account claim.", "Baseload_nonfederal_services": "Appendix physical p.11's object classification includes $1B in 'other services from non-Federal sources.' That is an object-class forecast inside the federal request, not evidence of $1B private co-investment, a recipient match, or an independent partner-cost total.", "interpretive_result": "AIQ/Genesis changes the proposed coordinating and delivery architecture across DOE, laboratories and outside partners even without a dollar model. It does not establish private decision rights, a private share of federal cost, a transfer of legal responsibility, or completed delivery. Baseload changes proposed reliability priorities and delivery channels; it does not establish project selection or cost-effectiveness." }, "material_disposition": { "Baseload": "Material request-stage priority and proposed resource reallocation are sufficiently described. Retain the reliability-rationale-to-amount limit and the proposed-transfer/legal-status boundary; no repeated hunt for a dollar model is needed to recognize the strategy direction.", "AIQ": "Material request-stage new account and coordination redesign are sufficiently described. Retain the proposal/transfer/legal-status and partner-cost limits; no study-to-dollar calculation is needed to recognize the intended strategy and institutional change.", "reopen_only_if": "A current claim needs to state that a transfer was enacted/executed, a balance was legally available, a named project was selected, or that a dollar share came from a partner." }, "no_canonical_edits": true }