.md · 2 sections · 13654 characters
workbench: Research Packages/International Monetary Transition/13 - International Crypto Map 2026/INTERNATIONAL_CRYPTO_MAP_RESEARCH_DESIGN.md
Canonical source SHA-256: ac5c2892545b586b4e3a1bfde008867bb62b94447170a9444e500566a5ae7cd9
Served copy SHA-256: ac5c2892545b586b4e3a1bfde008867bb62b94447170a9444e500566a5ae7cd9
Owner evidence cutoffs: {"international-monetary-transition": "2026-09-28T10:16:00+09:00"}
These are package-level cutoffs, not a claim that this source was rechecked on those dates. Use its own publication and capture dates.
Owners: international-monetary-transition, international-crypto-map
Section 1 of 2
# International Crypto Map — Research Design and Wave Plan
For every mapped jurisdiction, establish the exact legal, institutional and operating route from a proposed crypto activity to a usable and remediable financial result:
activity -> competent authority -> legal object -> eligible actor -> licensed or
registered entity -> customer or institutional access -> claim and debtor ->
authoritative record -> clearing or technical state -> final settlement ->
correction, insolvency and loss allocation
The design must support comparison without collapsing unlike things. A country may permit exchange activity while restricting direct redemption, run a wholesale tokenization pilot without authorizing retail stablecoins, or have high crypto use without a domestic licensed settlement rail.
## 2. What one country record must answer
Each country record will carry these separate dimensions:
## 3. Clocks that may never be merged
The hub may show these on one timeline, but must not present a later-looking clock as proof that an earlier legal or operational gate was satisfied.
## 4. Evidence and inference states
Every material map statement will carry one state:
primary_fact — established by the controlling primary object;official_actor_claim — the institution's own report, not independently
verified operation or outcome;bounded_inference — reasoned from named facts with an explicit limit;open_question — not established on reviewed evidence;conflict — primary objects appear inconsistent and remain unresolved.Coverage state is different from policy state. A lightly researched country must look incomplete, not hostile or inactive. Polygon color should default to research coverage, while filters reveal legal or operating states one dimension at a time. There will be no composite crypto-friendliness or adoption score.
## 5. Globe and hub interaction grammar
The Chronicle Astro Map proves the reusable neutral substrate: offline globe, country polygons and labels, drag/zoom, country inspection, responsive layout, local pinned Globe.GL and Natural Earth geography. The international crypto hub will give that substrate a new factual data owner.
Proposed rooms:
### Wave 0 — orientation and contract
### Wave 1 — normalize the existing core
This wave creates comparable summaries from existing owners. It does not re-research every underlying source or weaken the richer national constitutions.
### Wave 2 — Oceania and Singapore
Singapore receives a full country pass despite existing MAS, Tazapay, Partior, HSBC and testnet references. Australia and New Zealand start from thin holdings and require clean primary-source baselines.
### Wave 5 — missing global control cases
### Wave 6 — cross-border reconciliation and build
### Wave 7 — verification and optional shipment
Wave 7's verification work closed the first eighteen-jurisdiction build. Katie then opened a second governed research program with four additional waves:
### Wave 8 — missing endpoint closure
Completed 15 September 2026: all four jurisdictions are normalized. Each review now carries both sides where a second-side source exists; none crossed the route-promotion gate.
Each endpoint receives the same thirteen-dimension record. A second-country source may strengthen, narrow or contradict a saved route review; it does not promote an arc automatically.
### Wave 9 — issuer operating evidence
Status: complete at the 15 September 2026 cutoff. The comparison owner carries thirteen issuer/product records and is projected into the hub as an Issuer evidence view. It preserves a licensed service entity separately from the applicable token issuer and does not treat reported use as product approval. The 1 October recertification adds OUSD as a fourteenth record without changing the original Wave 9 acceptance rule.
### Wave 10 — failure, correction and recovery
Status: complete at the 15 September 2026 cutoff. Ten normalized cases compare property-trust return, civil rehabilitation, Chapter 11, liquidation, prosecution, issuer restoration, restitution and direct police recovery. A French orderly-exit record is explicitly retained as a non-failure comparator. The hub exposes the records as Failure paths without equating an order, frozen asset, estate recovery and customer receipt.
### Wave 11 — settlement-control synthesis and rebuild
Status: complete at the 15 September 2026 cutoff. Eight normalized control models now distinguish the holder claim, controlling legal person, authoritative record, final-money anchor, correction authority and terminal loss bearer. The settlement-control synthesis and hub Control stack preserve chain, platform, title and final-money finality as separate states. The route gate was reapplied to all nine reviews; no arc was promoted. Shared Catalog, Chronicle, Research Desk, app shipment and Git actions remain unauthorized.
Section 2 of 2
## 7. Country-wave research procedure
For every wave:
A country can appear as researched only when:
The global hub is not complete merely because every country has a marker.
A country pair, shared participant, technical integration, licence passport, first transaction, real-value pilot or program membership is not enough to draw an arc. Promotion requires normalized endpoints and direction; payer and beneficiary actors; legal object or claim; funding and FX; transfer and authoritative records; final money and legal finality; correction and terminal loss; and dated recurring-production evidence. Claims that do not clear this gate remain inspectable route reviews rather than disappearing or becoming visual implications.