Skip to content
Browse the whole research Library · Start page for AI agents ·

Currency Watch — TRY Blind Card v1.2A Rerun 1

.md · 2 sections · 14553 characters

Source, owner, and dates

workbench: Research Packages/Currency Watch/Extension Cards 2026-07-20/CW_CARD_TRY_2026-07-20_V1_2A_R1.md

Canonical source SHA-256: 3008bcdad473c77a8f17c63fe577df4cc795ccbca39fbb8d6a8e43ee11b8e4ca

Served copy SHA-256: 3008bcdad473c77a8f17c63fe577df4cc795ccbca39fbb8d6a8e43ee11b8e4ca

Owner evidence cutoffs: {"currency-watch": "2026-07-31"}

These are package-level cutoffs, not a claim that this source was rechecked on those dates. Use its own publication and capture dates.

Owners: currency-watch

Currency Watch — TRY Blind Card v1.2A Rerun 1

Section 1 of 2

# Currency Watch — TRY Blind Card v1.2A Rerun 1

Card ID: CW-CARD-TRY-2026-07-20-V1_2A_R1
Rubric: CURRENCY_WATCH_PILOT_RUBRIC_FROZEN_V1.md
Execution controls: CURRENCY_WATCH_PILOT_EXECUTION_ANNEX_V1_1.md, CURRENCY_WATCH_EXTENSION_EXECUTION_ANNEX_V1_2.md, and CURRENCY_WATCH_WAVE_1_SEQUENTIAL_RERUN_CONTROL_V1_2A.md
L6 control: CURRENCY_WATCH_L6_ROLE_PERIMETER_REPAIR_V1_2.md
Source freeze: CURRENCY_WATCH_G20_EXTENSION_SOURCE_MANIFEST_2026-07-20.md, TRY row and shared BIS spine only, as supplemented by CURRENCY_WATCH_WAVE_1_RERUN_SOURCE_ADDENDUM_V1_2A_2026-07-20.md
Event freeze: CURRENCY_WATCH_WAVE_1_EVENT_MANIFEST_2026-07-20.md
Grade state: SEALED-V1_2A_R1

## A. Identity and authority

Field Entry
Currency object Turkish lira (TRY)
Linked IMF member record(s) Republic of Türkiye; IMF Country Report 26/43
Monetary-policy authority Central Bank of the Republic of Türkiye (CBRT)
FX/intervention authority CBRT; the Bank may conduct FX auctions or direct intervention when necessary
Trade/customs authority Republic of Türkiye Ministry of Trade
Shared-authority overlay NONE
Regime stress class de jure free floating / de facto crawl-like; reserve-quality and CFM stress
International role tags FX-hedge
Blind wave 1

## B. Controlling source clocks

Field Entry
Manifest row TRY
Article IV/common report or controlled stale state Türkiye IMF Country Report 26/43
Discussions end 2025-11-14
Staff cutoff NOT-STATED
Datum vintages GDP, inflation, reserve and current-account observations: 2025; bank CAR: 2025Q2; March lira-asset-sales observation: March 2025; BIS FX turnover: April 2019, April 2022 and April 2025; 2026 inflation value is a projection; preliminary external assessment concerns 2025
Post-cutoff statement NONE
Board date 2026-02-06
Publication date 2026-02-13
ESR vintage 2025 ESR is the last completed ESR and principally assesses 2024; the TRY-row 2025 assessment is preliminary
National-data cutoff NOT-STATED as a universal cutoff; decisive observations retain the vintages above

## C. Authority response

Field Entry
Response state PARTIAL
Exact proposition answered The Turkish authorities emphasize disinflation progress, reserve rebuilding, policy normalization and financial-system resilience; staff and Board concerns over reanchoring and reserve quality remain separately attributed.
Source/page/date Statement by Executive Director Yigit Korkmaz Yaşar and Advisor Murat Erinc Bayrakci on behalf of the Turkish authorities, IMF CR 26/43 PDF pp.110–115, especially pp.113–114 for monetary, exchange and reserve views; 2026-02-06
Attribution boundary Staff / Board / member authority kept separate

## D. Categorical legal card

Object Controlled state Source/page Confidence
Article IV general status CONSULTATION-COMPLETED IMF CR 26/43; completed 2026-01-26, Board 2026-02-06 HIGH
Manipulation status NOT-PUBLICLY-DETERMINABLE No frozen formal finding or two-part intent analysis HIGH
Article VIII §2 current-payment restrictions NONE-IDENTIFIED-EXCEPT-SECURITY-RESTRICTIONS IMF CR 26/43 PDF p.106 HIGH
Article VIII §3 MCP/discriminatory practice NONE-IDENTIFIED IMF CR 26/43 PDF p.106 HIGH
Article VIII §4 foreign-held balances NOT-PUBLICLY-DETERMINABLE Not resolved in the frozen TRY row HIGH
Article VIII §5 information duty NOT-PUBLICLY-DETERMINABLE Not resolved in the frozen TRY row HIGH
Article XIV NOT-APPLICABLE-ARTICLE-VIII-ACCEPTED IMF CR 26/43 PDF p.106 HIGH
Capital controls / CFMs SEPARATE-DESCRIPTIVE-OBJECT IMF CR 26/43 PDF pp.58, 106; itemized controls missing MEDIUM
Security restrictions SEPARATE-DESCRIPTIVE-OBJECT IMF CR 26/43 PDF p.106 HIGH
Tariff / sanction / export-control objects SEPARATE-EVENT-RECORDS Wave 1 event manifest HIGH

No categorical legal state is converted numerically.

## E. Linked event records

Every Wave 1 event-manifest row is accounted for below. A link is contextual and does not establish transmission.

Event ID Link state Legal/operating clock Proposed transmission Evidence state
TP-US-2026-SECTION122 LINKED Operative for covered entries at the 2026-07-20 freeze; scheduled 2026-07-24 clock and court appeal separate No observed TRY-lane transmission frozen UNRESOLVED
TP-US-SECTION232-PRODUCT-SET LINKED PRODUCT-SPECIFIC; operative schedules and stacking require instrument-level retrieval No observed TRY-lane transmission frozen UNRESOLVED
TP-TR-EU-CUSTOMS-UNION LINKED FRAMEWORK-EXISTS; product coverage and operative schedule unresolved No monetary-performance transmission frozen UNRESOLVED
TP-EU-2026-CBAM LINKED Effective in 2026; product and compliance incidence separate No observed trade, price, FX or external transmission frozen UNRESOLVED
TP-US-TR-PRODUCT-SET LINKED CLOCK-UNRESOLVED No rate, scope or grade inference UNRESOLVED
TP-BR-MERCOSUR-TRADE-SET NOT-LINKED-IN-FROZEN-CURRENCY-ROW INSTRUMENT-SPECIFIC NOT-LINKED-IN-FROZEN-CURRENCY-ROW UNRESOLVED
TP-BR-TRADE-REMEDY-SET NOT-LINKED-IN-FROZEN-CURRENCY-ROW CLOCK-UNRESOLVED NOT-LINKED-IN-FROZEN-CURRENCY-ROW UNRESOLVED
SAN-RU-MULTIJURISDICTION-SET NOT-LINKED-IN-FROZEN-CURRENCY-ROW INSTRUMENT-AND-JURISDICTION-SPECIFIC; clocks unresolved NOT-LINKED-IN-FROZEN-CURRENCY-ROW UNRESOLVED
CFM-RU-NATIONAL-CONTROL-SET NOT-LINKED-IN-FROZEN-CURRENCY-ROW INSTRUMENT-SPECIFIC; clocks unresolved NOT-LINKED-IN-FROZEN-CURRENCY-ROW UNRESOLVED
EC-RU-EXPORT-LICENSE-SET NOT-LINKED-IN-FROZEN-CURRENCY-ROW INSTRUMENT-AND-JURISDICTION-SPECIFIC; clocks unresolved NOT-LINKED-IN-FROZEN-CURRENCY-ROW UNRESOLVED
PAY-RU-PAYMENT-RESTRICTION-SET NOT-LINKED-IN-FROZEN-CURRENCY-ROW TRANSACTION-LEVEL-EVIDENCE-MISSING NOT-LINKED-IN-FROZEN-CURRENCY-ROW UNRESOLVED
CM-RU-COUNTERMEASURE-SET NOT-LINKED-IN-FROZEN-CURRENCY-ROW INSTRUMENT-SPECIFIC; clocks unresolved NOT-LINKED-IN-FROZEN-CURRENCY-ROW UNRESOLVED

## F. Binding lane-readiness gate

This gate is completed before grading. Under v1.2A, FAIL maps to NR; only PASS may receive A–F.

Lane Readiness result Frozen reason
L1 Domestic anchor FAIL Target/framework, core inflation and expectations, stance and persistence evidence are incomplete.
L2 Underlying order FAIL Local-currency use, arrears, liquidity/asset quality and persistence evidence are incomplete.
L3 Exchange order FAIL Accessible exchange path, volatility/premium and intervention series are incomplete.
L4 External adjustment FAIL Current-account components, NIIP/debt, saving-investment drivers and persistence evidence are incomplete.
L5 Current-payment usability FAIL Operating FX access, delay, arrears and transfer evidence are incomplete.
L6 International systemic service PASS Frozen BIS current use, persistence, market operation and foreign-dealer boundary satisfy all four v1.2 gates.

## G. L6 eligibility gate

Required gate Evidence + vintage Result
Current official quantitative international use BIS 2025 Triennial Survey: TRY average daily OTC FX turnover $50bn, 0.5% share, April 2025 PASS
Comparable persistence observation BIS: $71bn/1.1% in April 2019; $27bn/0.4% in April 2022; $50bn/0.5% in April 2025 PASS
Operating reliability/liquidity/access evidence BIS global reporting-dealer turnover supplies market-activity and liquidity evidence; the role remained active in 2025 after the 2022 trough PASS
Named foreign users, markets or jurisdictions Global reporting dealers in the international OTC FX market PASS
Qualifying role FX-hedge PASS
Eligibility result All four gates pass GRADEABLE

## H. Six-lane worksheet

Lane Proposed grade One-sentence reason Primary evidence + vintage Persistence evidence Shock evidence Competing explanation Confidence Legal/event link Data gap
L1 Domestic anchor NR The domestic-anchor job cannot be graded because the binding frozen packet lacks complete target/framework, core/expectations, stance and persistence evidence. v1.2A TRY readiness gate: FAIL; 2025 average/end inflation 34.9%/30.9%, 2025 GDP +4.1% and 2026 end-inflation projection 23% are context only. MISSING NOT-APPLICABLE Falling inflation and positive growth could indicate progress, but fragments cannot replace the missing minimum evidence. HIGH NONE; legal and trade objects do not set this grade. Target/framework, core inflation, expectations, stance and comparable persistence series.
L2 Underlying order NR The underlying-order job cannot be graded because local-currency use, arrears, liquidity/asset-quality and persistence evidence are incomplete. v1.2A TRY readiness gate: FAIL; bank CAR 18% at 2025Q2 is context only. MISSING NOT-APPLICABLE The reported CAR and authority claim of resilient banks may indicate functioning, but they do not cover the lane minimum. HIGH NONE; CFMs and payment usability remain separate objects. Local-currency use, arrears, generalized liquidity, asset quality and comparable persistence.
L3 Exchange order NR The exchange-order job cannot be graded because the accessible exchange path, volatility or premium, and intervention series are incomplete. v1.2A TRY readiness gate: FAIL; gross reserves $184bn/79.5% ARA with quality and short-liability concerns are context only. MISSING March 2025 lira-asset sales of about $18bn are general shock context only; no frozen FX/intervention mechanism is supplied. Gross reserves and CBRT's intervention capacity could support order, while reserve-quality concerns could imply strain; neither resolves the missing operating series. HIGH TP-US-2026-SECTION122, TP-US-SECTION232-PRODUCT-SET, TP-TR-EU-CUSTOMS-UNION, TP-EU-2026-CBAM, TP-US-TR-PRODUCT-SET: no observed L3 transmission. Accessible exchange-rate path, volatility/premium, net/usable reserves and intervention persistence.
L4 External adjustment NR The external-adjustment job cannot be graded because current-account components, NIIP/debt, saving-investment drivers and persistence evidence are incomplete. v1.2A TRY readiness gate: FAIL; preliminary 2025 assessment WEAKER, CA -1.4%, gap -2.2% and REER overvaluation +8.7% are context only. MISSING NOT-APPLICABLE The modest current-account deficit may look bounded, but the preliminary weaker assessment and high financing needs point the other way; the missing structure prevents a call. HIGH TRY-linked trade objects are context only; no observed L4 transmission. Current-account components, NIIP/external debt, saving-investment drivers, final ESR and persistence series.
L5 Current-payment usability NR The current-payment-usability job cannot be graded because operating FX access, delays, arrears and transfer evidence are incomplete. v1.2A TRY readiness gate: FAIL; the affirmative Article VIII restriction/MCP record is categorical only. MISSING NOT-APPLICABLE The clean treaty statement could be consistent with usability, but formal status cannot substitute for operating transaction evidence. HIGH Article VIII §2/§3 record; security restrictions and CFMs remain separate; no trade-event grade transmission. Operating FX access, transaction delays, arrears and transfer evidence.
L6 International systemic service C TRY continues to perform a documented international OTC FX and hedging role, but its 2025 turnover share remained materially below 2019 after a sharp 2022 contraction, a persistent scale impairment despite partial recovery. BIS 2025 Triennial Survey: $50bn/day and 0.5% of global OTC FX turnover in April 2025 among global reporting dealers. BIS: $71bn/1.1% in 2019, $27bn/0.4% in 2022, $50bn/0.5% in 2025. NOT-APPLICABLE The strong rebound from 2022 and continuing liquidity could support B; the still-more-than-halved share versus 2019 supports a material-persistent-deviation call. MEDIUM NONE; no frozen event transmission to international FX service. Instrument-level liquidity/access and settlement-continuity metrics, user composition, and evidence explaining the 2019–2025 scale loss would sharpen the call.

I. Primary-lane collision check

Section 2 of 2

## I. Primary-lane collision check

Fact/source Primary lane Context links Separate second mechanism evidenced?
2025 inflation and GDP observations L1 Authority-response progress claim NO
2025Q2 bank CAR L2 Authority-response resilience claim NO
Gross reserves, ARA ratio, reserve-quality concerns and March lira-asset-sales observation L3 L4 financing context only NO
Preliminary external assessment, current account, gap and REER L4 L3 context only NO
Article VIII restriction/MCP statement L5 categorical legal context Security restrictions and CFMs separate NO
BIS 2019/2022/2025 global reporting-dealer turnover L6 No other lane NO
Wave 1 tariff/customs/product events Event ledger only L3/L4 context without transmission NO

## J. Seal

Field Entry
Grader TRY-RERUN-ISOLATED-GRADER
Blind wave 1
Started 2026-07-20T23:01:22-0400
Sealed 2026-07-20T23:01:29-0400
Other provisional cards visible? NO
Source substitutions made? NO
Composite calculated? NO
Card state SEALED-V1_2A_R1

## Post-seal wording clarification

Logged: 2026-07-20 ET
Grade effect: NONE

The L5 primary-evidence phrase “affirmative Article VIII restriction/MCP record” means an affirmative official status record: no ordinary current-payment restriction or MCP was identified, apart from separately routed security restrictions. It does not mean that an affirmative restriction or MCP finding exists. No lane grade changes.

After sealing, corrections append; they do not overwrite this card.