Wave 2C — direct sites: operations, industry, security, science, and delivery

.md · 2 sections · 18622 characters

Source, owner, and dates

workbench: Research Packages/Federal Government Weekly Delta 2026-09-11/waves/WAVE_2C_DIRECT_SITES_OPERATIONS_SECURITY.md

Canonical source SHA-256: 855ad2d7cf9a5531dd532fd7d1e8a85b4c42bc08da749dc139efc7655c567148

Served copy SHA-256: 855ad2d7cf9a5531dd532fd7d1e8a85b4c42bc08da749dc139efc7655c567148

Owner evidence cutoffs: {"federal-government-weekly-delta-2026-09-11": "2026-09-11T16:01:37-04:00"}

These are package-level cutoffs, not a claim that this source was rechecked on those dates. Use its own publication and capture dates.

Owners: federal-government-weekly-delta-2026-09-11

Wave 2C — direct sites: operations, industry, security, science, and delivery

Section 1 of 2

# Wave 2C — direct sites: operations, industry, security, science, and delivery

Window: exclusive after 2026-09-03 20:09:34 EDT through frozen cutoff 2026-09-11 16:01:37 EDT
Inclusive replay: 2026-09-03 date-only publishers, then dedupe against Weekly Delta 2026-09-03
Discovery rule: official operational, technical, program, award, procurement, and library pages. Federal Register is not discovery. FR objects live in WAVE_1C_OPERATIONS_INDUSTRY_DELIVERY.md.
Not in this wave: full military/service census (Wave 2D). War/DOE industrial objects that landed on civilian sites may be noted.
Do not recensus: Genesis through 2026-09-09 15:40 EDT; OPM RIF-appeals already operational as of Sep 2.

Award ≠ obligation ≠ payment ≠ delivery ≠ operation. 403 ≠ missing.

## Promotion-review objects (direct-site primary)

### 1. DOE EDF financially closed Duane Arnold restart loan (up to $1.9 billion)

Actor: DOE Office of Energy Dominance Financing; NextEra Energy; NRC as later gate
Clocks: close announced 2026-09-08. Plant ceased 2020. Restart pending NRC licensing. Stated 615 MW is nameplate claim, not generated power.
URL: DOE close
Disposition: promotion_review

This is the week’s strongest civilian energy money-state move: financial close, not a newsroom paraphrase of a future FOA. Keep the ladder: close ≠ first draw ≠ construction complete ≠ NRC authorization ≠ criticality ≠ MWh.

Claim limit: “Up to $1.9 billion” is a ceiling. Close is not outstanding principal. Job counts are agency projection.

### 2. NNSA completed B61-13 canned-subassembly production at Y-12

Actor: NNSA; Y-12 / Consolidated Nuclear Security; Pantex as next assembly node; Department of War as recipient
Clocks: diamond-stamp / War-Reserve certification 2026-09-01; NNSA announcement 2026-09-10. Agency says complete production cycle ~7 months ahead of last-production-unit need.
URL: NNSA Y-12
Disposition: promotion_review as a production/acceptance object on a civilian DOE site. Not a 2D service-site census.

Canned subassemblies are the secondary-stage hardware. After Y-12 they ship to Pantex for weapon assembly, then to War. This is completed CSA production and acceptance testing, not a fielded bomb, not a delivery to a combat unit, and not a stockpile upload receipt.

Claim limit: CSA complete ≠ Pantex assembly complete ≠ War acceptance ≠ deployed B61-13. Yield/target language in the release is program description, not a use event.

### 3. GSA OneGov AI 2.0: 27-month OpenAI ChatGPT consumption agreement

Actor: GSA Federal Acquisition Service; OpenAI
Clocks: announced 2026-09-10; expected effect 2026-10-01; 27-month term. Ordering through Multiple Award Schedule once live.
URL: GSA release; OneGov agreements
Disposition: promotion_review

Governmentwide vehicle: 50% token discount including FedRAMP-authorized environments; no platform fee, no minimum, no spend commitment; federal/state/local/tribal eligibility; GSA AI terms. GSA claims ~$1.68B OneGov savings to date (~$1.4B from AI agreements / ~3.5 million employees). Those savings are agency-reported, not audited here.

Claim limit: Agreement announcement is not agency onboarding, not a token burned, not FedRAMP authorization of a new model, not proof of mission use. Oct 1 is the access clock.

### 4. GSA listed Lanham Federal Building + Fort Worth garage for disposition (~$348 million claimed avoidance)

Actor: GSA
Clocks: announced 2026-09-10. Disposition plans, not a closed sale.
URL: GSA Fort Worth
Disposition: promotion_review

Agency claims >127 properties disposed since Jan 2025, $614 million proceeds, $1.15 billion avoided delinquent maintenance/operating expense. The Fort Worth object is addition to the disposition list plus a claimed $348 million cost avoidance. Not a deed, not proceeds in hand, not tenant move complete.

Claim limit: Listing ≠ sale ≠ proceeds ≠ vacated building. Avoidance figure is not cash recovered.

### 5. NASA opened the U.S. Space Academy host-state RFI

Actor: NASA; Presidential Commission on the United States Space Academy (Isaacman chair)
Clocks: EO signed 2026-08-28 (out of window; 120-day commission mandate). First commission meeting 2026-09-09. RFI posted 2026-09-10; responses due 2026-10-26 18:00 EDT; one submission per governor. Stated build path: groundbreaking ≤2027; first 300 students 2028 (temporary); permanent campus 2031.
URL: NASA release; SAM.gov RFI
Disposition: promotion_review

In-window state is the RFI + first commission meeting, not the August EO. Not a site selection, not a groundbreaking, not a student body.

Claim limit: RFI is not a location decision, appropriation, construction start, or academy in operation.

### 6. EPA issued the first Good Samaritan abandoned-mine cleanup permit (Bodie Mine, WA)

Actor: EPA; Trout Unlimited Inc.
Clocks: permit approved 2026-09-09. First of 15 statutory pilots under the 2024 Good Samaritan Act. Agency says it has 7 years to implement the pilot set.
URL: EPA permit
Disposition: promotion_review

Authorization to remediate abandoned hardrock tailings at Bodie Mine (Okanogan County, WA) affecting Toroda Creek. Not work complete, not contaminant reduction measured, not all 15 pilots granted.

Claim limit: Permit ≠ shovel in the ground ≠ cleanup result. “First ever” is program-status, not a national mine-cleanup outcome.

### 7. DOT stood up the SPACE Task Force; FAA marked Texas eVTOL pilot flights

Actor: USDOT; FAA; Secretary Duffy
Clocks: SPACE Task Force launched 2026-09-09; FAA eVTOL pilot-program celebration 2026-09-10 (experimental commercial flights under the department testing initiative).
URLs: DOT SPACE Task Force; FAA eVTOL (2026-09-10 item)
Disposition: promotion_review as operating-coordination / test-program objects

SPACE Task Force is an intradepartmental coordination body for the National Space Transportation Policy (launch infrastructure, regulation streamlining, airspace integration). Not a license, not a spaceport, not 10,000 annual launches (that figure is a 2035 projection in the release). eVTOL item is celebration of experimental flights under an existing pilot, not type certification or commercial passenger service.

Claim limit: Task force ≠ launched vehicle. Experimental flight ≠ certified air carrier operation.

### 8. DOE selected $73 million in Mine of the Future proving-ground projects

Covered as 1C object 9; repeated here because the controlling source is the DOE newsroom, not FR.

URL: DOE mining
Disposition: promotion_review (same claim limits as 1C). Selection for award negotiations.

### 9. NNSA declared Vermont free of high-risk cesium-137 devices

Actor: NNSA
Clocks: announced 2026-09-10. Agency: 15th state/territory; 97% of targeted Cs-137 devices eliminated or contracted; third 2026 U.S. cleanout after North Dakota and South Carolina.
URL: NNSA Vermont
Disposition: admit_lower_rank / promotion_review as a completed removal on a civilian DOE site.

Completed state cleanout is an operating result for the named material in Vermont. It is not a U.S.-wide end of Cs-137, not a dirty-bomb plot, and not a medical-capacity finding.

Claim limit: “Free of high-risk quantities” is NNSA’s program definition, not a radiological survey of every device in the state.

## Direct-site enrichments of 1C legal objects

These do not replace the FR instruments. They confirm agency-site operation or implementation.

1C object Direct-site confirmation Limit
EO 14427 DPA White House signed page reached; no Interior/DOE DPA implementing order found on energy.gov or doi.gov in-window Delegation ≠ rated order
EO 14421 bulk-power CESER RFI webinar page 2026-09-10; webinar 2026-09-16 RFI ≠ prohibition
FSA AFT FSA news 2026-09-03 reached Permanent rule still effective 2026-10-01
Ranchers / livestock EOs USDA Ranchers First updated 2026-09-04 with “additional four actions” (BRAND endorsement expected early 2027; SPUR guaranteed-loan program named) Program names ≠ loans or insurance in force
EPA RFS deadline EPA HQ news index reached; SRE “what they are saying” page exists; controlling text remains FR 2026-18132 Extension ≠ RIN retirement
WOTUS SNPRM epa.gov/wotus live; comment close 2026-10-09 Proposal ≠ jurisdiction change
Census NPRM FR-primary; Commerce newsroom did not surface it on the department press index Ops implication stays with 1C
FCC 2026-18535 Not hunted as FCC newsroom (1A legal). Ops effect taken from retrieved rule See 1C object 11

## Existing-object clocks checked (not new atomics)

Object Clock this window Result
DOE PJM Order 202-26-41 expired 23:59 ET 2026-09-08 Expired. No public EEA3/dispatch receipt on the order page. PJM order page
DOE Carolinas 202-26-43 expired 2026-09-08 Expired. 09-03 already owned.
DOE Stanton OUC through 2026-11-30 Still live. No new order.
TransAlta Centralia 202-26-28 through 2026-09-12 Carry; expires just after cutoff. Order page
Craig 202-26-31 through 2026-09-26 Carry.
Genesis SBIR pitch 2026-09-10 14:00 ET Fold into genesis-mission. Deadline occurrence is not a new FOA and not IOC.
OPM RIF appeals notices on/after 2026-09-02; 30 days after action effective date No new clock. Live page still describes the Sep 2 transfer, eFile, exclusive administrative remedy. DC operating status 2026-09-11: Open (routine).
NASA Blue Origin Mars network 09-03 award No in-window delivery.
NASA Roman Aug 30 launch Parker Solar Probe 29th perihelion 2026-09-04 + beacon 2026-09-07 is mission-status, not a new launch. Parker check-in
NRC North Anna ESP renewal application notice FR 2026-18516 (2026-09-11) Application under consideration, not a renewed permit.

Other direct-site objects reviewed and ranked down

Section 2 of 2

## Other direct-site objects reviewed and ranked down

## Libraries / procurement / delivery pages

Surface Result Note
energy.gov newsroom reached Duane Arnold, mining $73M, NNSA Y-12, Vermont Cs, GEMS, CESER webinar
energy.gov CESER 202(c) index doe-electricity-emergency-authorities 404 Individual order pages reached (PJM, TransAlta, Craig, Stanton). Index blocked/moved ≠ missing orders
DOE loan / EDF pages reached via close release No public amortization schedule retrieved
commerce.gov/news reached No in-window department press after G20 (Sep 2–3). Census NPRM not on this index
census.gov / FR 2026-18481 FR reached; bureau newsroom not separately recensus’d Ops object is the NPRM
usda.gov/about-usda/news/press-releases 403 / Access Denied Akamai block. Not treated as empty
fsa.usda.gov news reached AFT / farm-loan 2026-09-03
usda.gov/ranchers-first reached Sep 4 additional actions
doi.gov/news press releases reached; empty in-window Latest 2026-08-30
blm.gov / eplanning NPR-A FR + regulations.gov supporting EIS reached Direct BLM newsroom not separately required once FR/EIS in hand
epa.gov newsreleases reached Good Samaritan, WOTUS, drinking-water study, CCR, tribal 319
transportation.gov briefing room reached SPACE Task Force
faa.gov newsroom reached eVTOL, AIG (fold), hazmat penalty
nasa.gov news-release reached Space Academy, Djibouti advisory, Crew-12 advisory
sam.gov Space Academy RFI reached opp 274445df4c224846adf7de19c11c4c6a
gsa.gov news releases reached OneGov ChatGPT, Fort Worth, Sep 3 capital projects (fold)
gsa.gov per diem files reached FY27 files dated 2026-09-03
itvmo.gsa.gov/onegov linked from release; not re-crawled item-by-item Vehicle page cited
opm.gov RIF appeals reached No new clock
opm.gov/chcoc/published-memos reached Sep 2 RIF-regs memo = 09-03 object
nsf.gov/news reached Leadership letter only
nrc.gov news 2026 reached Advisories; ISR NPRM is FR publication of 09-03 object
SAM.gov / USAspending / FPDS not recensus’d Bounded negative: no transaction-level pass

## Coverage receipt

Publisher family Status Missed (new) Enrichment / clock Routine/reject
DOE newsroom / EDF / CMEI / HGEO reached 4 2 3
DOE CESER emergency orders mixed: index 404; order pages reached 0 3 expirations checked 0
NNSA civilian pages reached 2 0 1 (cesium narrative extras)
Commerce / NIST / NOAA / ITA / Census sites Commerce news reached; Census NPRM FR-primary 0 0 2 (G20; ITA not recensus’d)
USDA department press blocked 403 — — —
FSA / Ranchers First reached 1 (AFT news; 1C-primary) 1 (Sep 4 Ranchers First add-on) 0
Interior / BLM / USGS / FWS news Interior empty in-window; NPR-A via FR 0 0 1
EPA newsroom reached 2 1 (WOTUS) 3
DOT / FAA / NHTSA / FRA / FHWA FAA+DOT reached; FRA/FHWA news not separately hit 2 0 3
NASA news + SAM RFI reached 1 1 (Parker) 3
GSA news / per diem / OneGov reached 2 1 (per diem) 1
OPM adjudications / status / CHCO reached 0 1 (RIF page unchanged) 1 (Open status)
NSF news reached 0 0 2
NRC news / reactor status reached 0 1 (ISR FR fold) 4
FCC FR rule retrieved in 1C; newsroom not used as discovery 0 0 —
Award systems (SAM/USAspending/FPDS) not enumerated — — bounded

The service-site line is not opened. NNSA Y-12 / cesium objects are civilian DOE postings that happen to be nuclear-security industrial; Wave 2D owns a military census if opened.

Closed: yes for the named 2C publisher families above, with three access limits left visible: USDA department press 403, CESER 202(c) index 404, and no SAM/USAspending transaction census. Those are tool-path or scope bounds, not inactivity findings.