Skip to content
Browse the whole research Library · Start page for AI agents ·

DEFENSE FY2027 C1 P0 P74 RECEIPT

.json · 1 sections · 5592 characters

Source, owner, and dates

workbench: _Working/federal-budget-2026-2027/goal/terra_institutions/defense/c1/batch1/DEFENSE_FY2027_C1_P0_P74_RECEIPT.json

Canonical source SHA-256: 510e5a8ed04d53db2de7364c3fa7dea3b1cef3aa790cb1f19db82682e7929cf6

Served copy SHA-256: 510e5a8ed04d53db2de7364c3fa7dea3b1cef3aa790cb1f19db82682e7929cf6

Owner evidence cutoffs: {"federal-budget-fy2026-fy2027": "2026-09-11T19:55:13-04:00"}

These are package-level cutoffs, not a claim that this source was rechecked on those dates. Use its own publication and capture dates.

Owners: federal-budget-fy2026-fy2027

complete text

Opening section

Section 1 of 1

{ "receipt_type": "bounded partial sequential-read construction-accounting and reference inventory", "created": "2026-09-11", "source": {"title": "Construction Programs (C-1), Department of War Budget, Fiscal Year 2027", "publisher": "Office of the Under Secretary of War (Comptroller)", "cover_date": "April 2026", "official_url": "https://comptroller.war.gov/Portals/45/Documents/defbudget/FY2027/FY2027_c1.pdf", "local_snapshot": "/private/tmp/fy2027_c1.pdf", "observed_pdf_pages": 450, "file_metadata_observed": {"creation_date": "2026-04-02 10:59:07 EDT", "modification_date": "2026-04-15 15:58:25 EDT", "caution": "metadata is not release-date evidence"}}, "read_coverage": {"status": "partial; assigned first 75 physical pages read sequentially", "pdf_pages_read": "0-74 inclusive", "sections": [{"pdf_pages":"0-3","scope":"cover, preface, contents"},{"pdf_pages":"4-8","scope":"FY27 funding overview, mandatory justification, authorization/BA/TOA summary, host-country in-kind project lists"},{"pdf_pages":"9-33","scope":"FY25 summary and state/country tables"},{"pdf_pages":"34-57","scope":"FY26 summary and state/country tables"},{"pdf_pages":"58-74","scope":"FY27 summary, TOA by component/purpose/location, and first state/country pages"}], "unread_pdf_pages": "75-449 inclusive", "next_scope": "FY27 state/country tables continue at p.75, followed by individual project detail."}, "accounting_basis": {"principal_fields": ["Authorization Amount", "Authorization for Appropriations", "Appropriation Amount", "Budget Authority", "Total Obligational Authority"], "distinction": "Unlike the M-1/O-1/R-1 exhibits, C-1 expressly displays authorization, Budget Authority, and TOA. FY27 project and funding fields are a President's Budget request and do not establish appropriation/enactment."}, "FY2027_topline_thousands": {"locator":"PDF pp.4-6,58-63", "discretionary":26400903, "mandatory_reconciliation":2684633, "total_C1_funding_overview":29085536, "authorization_of_appropriations":31250315, "budget_authority":31250315, "TOA":31250315, "host_country_in_kind_contributions":550500, "explanation":"The $29.086B funding-overview total and $31.250B C-1 authorization/BA/TOA total are distinct published accounting presentations and must not be collapsed."}, "mandatory_basis": {"locator":"PDF pp.4-5", "FY2027_mandatory_total":2684633, "breakout":{"Over_the_Horizon_Radar_INC_Homeland_Defense":217000,"unspecified_minor_MILCON_Homeland_Defense":190000,"family_housing_construction_and_operations_Warrior_Ethos":2277633}, "stated_rationale":"Page 5 says the $217M is Defense-Wide MILCON for a long-range early-detection over-the-horizon-radar facility co-funded with the Air Force; $190M supports unspecified smaller homeland-defense facility projects; about $2.2B is for family-housing quality-of-life investments.", "limits":"This narrative is a request rationale. It cites no feasibility study, cost model, condition survey, life-cycle analysis, or performance evaluation."}, "FY2027_selected_TOA_thousands": [{"account":"Military Construction, Army","TOA":1931638},{"account":"Military Construction, Navy","TOA":8266703},{"account":"Military Construction, Air Force","TOA":10601180},{"account":"Military Construction, Defense-Wide","TOA":3809951},{"account":"Military Construction, Army National Guard","TOA":358909},{"account":"Military Construction, Air National Guard","TOA":525221},{"account":"Military Construction, Army Reserve","TOA":209913},{"account":"Military Construction, Navy Reserve","TOA":132272},{"account":"Military Construction, Air Force Reserve","TOA":22172},{"account":"NATO Security Investment Program","TOA":604270},{"account":"Base Realignment and Closure","TOA":372317},{"account":"Family Housing total","TOA":4415769}], "named_source_and_legal_reference_census": [{"name":"Public Law 119-21, §20013 (called OBBBA in C-1)","locator":"PDF p.4 footnote 1","role":"C-1 says a detailed FY2026 MILCON spend plan was submitted to Congress in an April 2026 update under this provision.","underlying_object_read":false,"limit":"The exact spend-plan artifact and update are not reproduced or linked."},{"name":"FY2026 detailed Military Construction spend plan","locator":"PDF p.4 footnote 1","role":"comparison/provenance input for FY2026 mandatory reconciliation presentation","underlying_object_read":false,"limit":"date is only 'April 2026 update'; no exact URL/title in C-1."}], "project_lists_not_evidence": [{"locator":"PDF pp.7-8","items":"Poland and Republic of Korea host-country in-kind project lists","treatment":"project authorization requests and in-kind contribution listings, not cost-benefit analyses or implementation evidence"},{"locator":"PDF pp.73-74 and continuing","items":"FY2027 state/country entries","treatment":"geographic accounting allocation, not an evidentiary causation study"}], "evidence_limits": ["No named study, condition assessment, engineering estimate, environmental review, force-structure analysis, appraisal, model, or performance result was identified in PDF pp.0-74.","The project names and construction categories are not promoted to studies or proof of need/outcome.","Individual project justification forms and the exact FY26 spend plan remain necessary for project-level rationale and execution analysis."], "upstream_queue": ["Exact FY2026 P.L.119-21 §20013 MILCON spend-plan update.","Individual project C-1 justification forms/pages after PDF p.75.","Any cited condition assessments, engineering designs/cost estimates, or environmental documents identified in those project records."] }