Skip to content
Browse the whole research Library · Start page for AI agents ·

VA FY2027 VOLUME4 PHYSICAL 121 160 AUDIT

.json · 2 sections · 18999 characters

Source, owner, and dates

workbench: _Working/federal-budget-2026-2027/goal/terra_human/va/batch30/VA_FY2027_VOLUME4_PHYSICAL_121_160_AUDIT.json

Canonical source SHA-256: e0a03ea7e883f7a6baa12876f67bb16b802a3148895a0f446e64f76e60868566

Served copy SHA-256: e0a03ea7e883f7a6baa12876f67bb16b802a3148895a0f446e64f76e60868566

Owner evidence cutoffs: {"federal-budget-fy2026-fy2027": "2026-09-11T19:55:13-04:00"}

These are package-level cutoffs, not a claim that this source was rechecked on those dates. Use its own publication and capture dates.

Owners: federal-budget-fy2026-fy2027

complete text

Opening section

Section 1 of 2

{ "artifact_type": "bounded_full_sequential_CJ_read_receipt", "status": "complete_for_assigned_physical_page_range", "created": "2026-09-11", "source_document": { "identity": "U.S. Department of Veterans Affairs, FY 2027 Budget Submission, Volume 4 of 5: Construction, Long Range Capital Plan and Appendix", "official_url": "https://department.va.gov/wp-content/uploads/2026/04/Volume-4.pdf", "physical_pdf_page_count_observed_in_official_reader": 502, "local_source_path": null, "source_access": "Official PDF reader; no local download or local extraction path claimed." }, "page_coverage": { "physical_pdf_pages_read": "121-160 inclusive, one-based; official-reader indices P120-P159", "printed_content_covered": "2-101 through 4-31, including printed 4-15 and 4-23 intentionally blank", "sequential_read_method": "All 40 assigned physical pages read in order in the official PDF reader. Tables were inspected for funding clock, authority, cost/forecast designation, and source identity; figures were not transcribed cell by cell.", "next_unread_physical_page_one_based": 161, "next_unread_reader_index": 160, "next_unread_printed_page": "4-32", "remaining_scope": "physical pp.161-502 / reader indices P160-P501" }, "claims_and_boundaries": [ { "printed_pages": "2-101 to 2-102", "claim": "VA requests $164.160m in FY2027 budget authority and $118.180m in RETF for a non-Departmental Federal Entity to provide project-management support for major projects costing more than $100m; it states 10% of estimated construction cost and 8% of design cost as estimated service costs.", "status": "FY2027_request_with_agency_estimation_rule", "boundary": "The 10%/8% figures are VA estimates in the CJ, not an independently reviewed cost model or observed performance result." }, { "printed_pages": "3-1 to 3-6", "claim": "VA requests $861m for Construction, Minor, split between time-limited and no-year availability. It compares FY2025 actual, FY2026 budget estimate, FY2026 current estimate, and FY2027 request; it labels certain balances as including expired budgetary resources.", "status": "appropriation_language_and_budget_formulation", "boundary": "FY2025 actual, FY2026 estimate/current estimate, FY2027 request, unobligated balances, RETF, and P.L.118-158 hurricane-supplemental entries are different accounting clocks and must not be combined as a single current program total." }, { "printed_pages": "3-6 to 3-8", "claim": "VHA's $670.719m minor-construction request includes a stated $2m share of the Department of State Capital Security Cost Sharing program for Manila. NCA's $107.181m request is described as SCIP-prioritized and references the Facility Condition Assessment report and Millennium Act study. VBA requests $24.1m, including $2.9m of DoS cost sharing.", "status": "FY2027_requests_with_named_or_described_inputs", "boundary": "The cited Facility Condition Assessment and Millennium Act study were not read. The DoS program description/14-year $17.5bn statement is a CJ footnote, not independently verified here." }, { "printed_pages": "4-1 to 4-6", "claim": "The Major Medical Facility authorization/lease-notification chapter identifies statutory notification, APDF report, committee-resolution, and GSA process requirements; it lists $3.575090bn in FY2027 Major Project Authorization Requests and $234.580m in five lease-resolution requests, with lease estimates anticipated in FY2028 and later.", "status": "FY2027_submission_requests_and_process_description", "boundary": "A listed authorization or resolution request is not an enacted authorization, appropriated funding, executed lease, or completed project. The printed $3.961412m 40 USC3307 threshold is stated on p4-6; do not harmonize it with a different threshold stated in another CJ location/year without source-specific comparison." }, { "printed_pages": "4-7 to 4-14", "claim": "VA requests authorization to repurpose previously appropriated Building212 Major Construction funds for a $98m FY2027 West Los Angeles transitional-housing renovation supporting NCWI. It presents alternatives, market/DoD assertions, demographic projections, PIT homelessness estimates, a discounted lifecycle comparison, and a projected October2026 award/June2028 completion/July2028 activation schedule.", "status": "FY2027_authorization_and_repurposing_request_with_agency_forecasts_and_modelled_comparison", "boundary": "The request to repurpose is not evidence that reprogramming/repurposing has been approved. PIT counts, demographic forecasts, market research, DoD coordination, cost-effectiveness calculations, schedule, and operating-cost estimates are not independently sourced or validated in the CJ." }, { "printed_pages": "4-16 to 4-22", "claim": "VA requests authorization to repurpose and reprogram existing Major Construction funding for an $82m Building306 replacement supporting NCWI. The pages identify a proposed Oct2026 award and July2028 activation and show a discounted-alternatives comparison.", "status": "FY2027_authorization_and_reprogramming_request_with_agency_model", "boundary": "The CJ says the request to Congress is forthcoming. Reprogramming/re-purposing, construction, award, and activation remain requested/prospective. CTRS, CERS, MIRECC, GRECC, GEC, and CDCE are program labels in the building description, not named evidence sources or evaluations." }, { "printed_pages": "4-24 to 4-29", "claim": "VA requests authorization to reprogram $32.4m for historic rehabilitation of Wadsworth Chapel/Building20 in support of NCWI, with FY2027 funds described as reprogrammed from other projects and a 2028 delivery target. The pages give a $63.7m discounted lifecycle comparison and demographic/PIT estimates.", "status": "FY2027_authorization_and_reprogramming_request_with_agency_forecasts_and_model", "boundary": "This is not an approved reprogramming. Current 2024 demographic values, future 2029-2044 projections, PIT estimates, modelled costs, and schedule each retain their own observation/forecast/model clocks." }, { "printed_pages": "4-30 to 4-31", "claim": "The Broward outpatient-clinic replacement lease prospectus seeks a FY2027 committee resolution of $42.016m for a lease term of up to 20 years, with $7.985m unserviced annual rent; the current lease is said to expire September2028.", "status": "FY2027_resolution_request_and_lease_formulation", "boundary": "The requested committee resolution and prospective lease are not award/execution. The market research, local-planner interviews, DoD-sharing conclusion, priority score, space/workload reasoning, and alternative analysis are described inputs; their underlying records were not read in this batch." } ], "formulation_inputs_and_named_upstream_objects": [ {"id":"v4_38usc8103e1","identity":"38 U.S.C. 8103(e)(1)","type":"law","printed_CJ_pages":["2-102"],"role_in_CJ":"CJ states it requires non-Departmental Federal Entity project-management support for large major-construction projects.","status":"cited_in_CJ_not_read_here","url":"https://uscode.house.gov/","limits":"Statute text and any amendment history were not read; this records only VA's citation/description."}, {"id":"v4_pl114_58","identity":"Public Law 114-58","type":"law","printed_CJ_pages":["2-102"],"role_in_CJ":"Listed with 38 USC8103(e)(1) as a requirement for non-Departmental project-management support.","status":"cited_in_CJ_not_read_here","url":"https://www.congress.gov/114/plaws/publ58/PLAW-114publ58.pdf","limits":"No original-law review in this batch."}, {"id":"v4_pl115_141","identity":"Public Law 115-141","type":"law","printed_CJ_pages":["2-102"],"role_in_CJ":"Listed with 38 USC8103(e)(1) as a requirement for non-Departmental project-management support.","status":"cited_in_CJ_not_read_here","url":"https://www.congress.gov/115/plaws/publ141/PLAW-115publ141.pdf","limits":"No original-law review in this batch."}, {"id":"v4_minor_appropriation_authorities","identity":"38 U.S.C. §§316, 2404, 2406, chapter81, and §8104(a)(3)(A)","type":"law bundle","printed_CJ_pages":["3-1"],"role_in_CJ":"Appropriation-language authorities for minor-construction purposes and project-cost limit.","status":"cited_in_CJ_not_read_here","url":"https://uscode.house.gov/","limits":"The receipt retains the cited bundle because the CJ presents it as a bundle; no original statutory review or section-by-section legal conclusion."}, {"id":"v4_pl118_158","identity":"Public Law 118-158 hurricane supplemental","type":"law/appropriation","printed_CJ_pages":["3-3","3-4"],"role_in_CJ":"Shown as FY2025 NCA hurricane supplemental and related recoveries in minor-construction tables.","status":"accounting_row_in_CJ_not_read_here","url":"https://www.congress.gov/118/plaws/publ158/PLAW-118publ158.pdf","limits":"The line is an FY2025 table entry, not FY2027 requested budget authority; original appropriation scope not read."}, {"id":"v4_scip","identity":"VA Strategic Capital Investment Planning (SCIP) process/prioritization","type":"agency planning process","printed_CJ_pages":["3-2","3-6","3-7","4-25"],"role_in_CJ":"Rationale and typical prioritization for minor construction and WLA projects.","status":"described_in_CJ_only","url":null,"limits":"No SCIP scoring record, methodology, project decision, or input dataset was read; this does not establish an independent effectiveness result."}, {"id":"v4_nca_facility_condition_assessment","identity":"NCA Facility Condition Assessment report","type":"agency report","printed_CJ_pages":["3-7"],"role_in_CJ":"Named as identifying cemetery repair projects.","status":"named_source_located_in_CJ_not_read","url":null,"limits":"No title/date/version/URL or findings given in the assigned pages; identity remains incomplete."}, {"id":"v4_millennium_act_cemetery_study","identity":"Millennium Act study on improvements to Veterans' cemeteries","type":"study","printed_CJ_pages":["3-7"],"role_in_CJ":"Named alongside the Facility Condition Assessment as an input to NCA needs.","status":"named_source_located_in_CJ_not_read","url":null,"limits":"No study identity, date, author, URL, method, or result is supplied in the CJ pages."}, {"id":"v4_dos_capital_security_program","identity":"Department of State Capital Security Cost Sharing program; Secure Embassy Construction and Counterterrorism Act of 1999, P.L.106-113 §1000(a)(7)","type":"program and law","printed_CJ_pages":["3-6"],"role_in_CJ":"Explains VHA/VBA Manila cost-sharing entries; footnote says agencies occupying DoS-controlled overseas space provide advance funding and describes a DoS 14-year/$17.5bn program to replace 150 compounds.","status":"CJ_footnote_not_read_at_original","url":"https://www.congress.gov/106/plaws/publ113/PLAW-106publ113.pdf","limits":"No original statute, amendment, DoS program plan, cost-share calculation, or $17.5bn program evidence read. The footnote's description is retained as VA's statement."}, {"id":"v4_38usc8104","identity":"38 U.S.C. §8104(b) and §8104(f)","type":"law","printed_CJ_pages":["4-1"],"role_in_CJ":"CJ states prospectus/notification and APDF report timing requirements for major medical projects.","status":"cited_in_CJ_not_read_here","url":"https://uscode.house.gov/","limits":"No original-law review; the 30-day timing is VA's stated statutory interpretation."},

Section 2 (continued)

Section 2 of 2

{"id":"v4_40usc3307","identity":"40 U.S.C. §3307(a) and §3307(h)","type":"law","printed_CJ_pages":["4-1","4-6"],"role_in_CJ":"Sets cited prospectus/lease threshold and annual adjustment context; CJ prints $3,961,412 on p4-6.","status":"cited_in_CJ_not_read_here","url":"https://uscode.house.gov/","limits":"No original statute or annual GSA threshold notice read. The dollar amount is recorded as printed in this location only."},
{"id":"v4_pl117_168_703a4b","identity":"Public Law 117-168 §703(a)(4)(B)","type":"law","printed_CJ_pages":["4-1"],"role_in_CJ":"CJ says major medical facility leases at/above the cited threshold require House/Senate Veterans' Affairs committee resolutions before appropriation.","status":"cited_in_CJ_not_read_here","url":"https://www.congress.gov/117/plaws/publ168/PLAW-117publ168.pdf","limits":"No original-law review; this is VA's process description."},
{"id":"v4_pl112_74_divc625","identity":"Public Law 112-74, Division C §625","type":"law","printed_CJ_pages":["4-1"],"role_in_CJ":"CJ's definition of a new lease excludes certain extensions, expansions, renewals, and pre-negotiated options.","status":"cited_in_CJ_not_read_here","url":"https://www.congress.gov/112/plaws/publ74/PLAW-112publ74.pdf","limits":"No original-law review or application to specific leases."},
{"id":"v4_gsa_lease_authority","identity":"GSA leasing authority, policy requirements, prospectus review, and current prospectus threshold","type":"federal process/policy","printed_CJ_pages":["4-6"],"role_in_CJ":"Frames VA/GSA solicitation, award, and committee-review process for five major lease requests.","status":"described_in_CJ_only","url":null,"limits":"No GSA policy, approval, threshold notice, or project prospectus read; a stated process is not proof of approval."},
{"id":"v4_eo14296","identity":"Executive Order 14296, Keeping Promises to Veterans and Establishing the National Center for Warrior Independence","type":"executive authority","printed_CJ_pages":["4-7","4-9","4-18","4-24","4-25"],"role_in_CJ":"Priority/requirement rationale for Building212, Building306, and Chapel project proposals, including the stated 2028 timeline.","status":"cited_in_CJ_not_read_here","url":"https://www.federalregister.gov/","limits":"EO text and its implementation records were not read here. The designation does not itself appropriate, authorize, award, or complete projects."},
{"id":"v4_wla_pit_demographics_forecasts","identity":"VA Point in Time homelessness estimates; VISN22/Greater Los Angeles and all-VISN22 demographic/enrollee projections","type":"agency data and forecast bundle","printed_CJ_pages":["4-9","4-12","4-20","4-27"],"role_in_CJ":"Need/demographic inputs for WLA Building212, Building306, and Chapel proposals.","status":"agency_data_and_forecast_in_CJ_only","url":null,"limits":"PIT methodology, vintage, geography, forecast model, uncertainty, and source records were not supplied/read. The CJ itself contains nonidentical rounded California/national homelessness figures across project pages; they are not harmonized here."},
{"id":"v4_wla_market_dod_and_cost_template","identity":"High-level market research; local VA planners; VHA Office of Interagency Health Affairs—Office of VA-DoD Coordination; unidentified cost-effectiveness analysis template","type":"unidentified agency/market inputs and model","printed_CJ_pages":["4-10","4-11","4-18","4-19","4-26","4-27","4-31"],"role_in_CJ":"Supports alternative exclusions and discounted lifecycle cost comparisons for WLA projects and Broward lease.","status":"described_in_CJ_only_identity_partly_unresolved","url":null,"limits":"No market-research record, planner interview, coordination memorandum, template version, discount rate, horizon, assumptions, input data, or validation was read. These claims are not independently established."},
{"id":"v4_wla_program_labels","identity":"CTRS, CERS, MIRECC, GRECC, GEC, CDCE, NCWI, and WLA campus program/building labels","type":"program/site labels","printed_CJ_pages":["4-16","4-17","4-18","4-24"],"role_in_CJ":"Describes proposed occupants/services and NCWI project context.","status":"not_evidence_source","url":null,"limits":"No label is treated as a study, evaluation, administrative dataset, or named upstream source absent a separately identified document."},
{"id":"v4_reprogramming_and_project_cost_tables","identity":"VA project authorization/reprogramming tables, cost estimates, FTEE and operating-cost schedules","type":"internal budget formulation and accounting tables","printed_CJ_pages":["4-7","4-8","4-13","4-16","4-17","4-21","4-24","4-25","4-28","4-29"],"role_in_CJ":"States existing appropriations, requested repurpose/reprogramming, cost components, requested FY, future request, schedules, and operating-cost presentation.","status":"agency_CJ_tables_not_independent_source","url":null,"limits":"The tables contain mixed actual/current/projected/discounted/reprogramming-request fields. They do not establish approval, award, completion, or benefit and no underlying accounting records/model files were read."},
{"id":"v4_broward_lease_inputs","identity":"Broward lease priority score, current lease expiration, market research, local-planner interviews, SCIP space-gap output, and VA/DoD sharing assessment","type":"agency planning/market/process inputs","printed_CJ_pages":["4-30","4-31"],"role_in_CJ":"Rationale for replacement lease, preferred alternative, and excluded alternatives.","status":"described_in_CJ_only","url":null,"limits":"No supporting scorecard, lease, demand/workload data, market analysis, interviews, or coordination material was read. Current lease expiration is a CJ assertion, not independently verified."}

], "accounting_clock_and_measure_handling": { "actual_or_currently_described": ["FY2025 Actual table columns", "FY2026 Current Estimate table columns", "existing Building212/306/20 status descriptions", "current lease expiration stated for Broward"], "request_or_authorization": ["FY2027 appropriation and line-item requests", "FY2027 major-project authorization and committee-resolution requests", "requests to repurpose/reprogram existing appropriations", "requested project cost and funding tables"], "forecast_or_model": ["FY2026 Budget Estimate and FY2027 RETF", "2028 and later anticipated lease estimates", "2029-2044 demographics/enrollee forecasts", "PIT estimates", "schedules", "discounted lifecycle costs/net-present-value style comparisons", "estimated operating costs/FTEE and market availability"], "separation_rule": "No request is treated as an appropriation, resolution as approval, reprogramming request as executed transfer, estimate as actual, or program name as evidence source." }, "remaining_work": [ "Continue Volume4 at physical p161 / reader index P160 / printed4-32.", "Original-source work remains for statutes, EO14296, SCIP record/methods, NCA reports, DoS capital-security materials, GSA policies/thresholds, VA PIT/demographic/workload data, market/DoD coordination records, lifecycle cost-effectiveness templates, cost/schedule models, lease prospectus evidence, and reprogramming/appropriation records.", "The next pages complete the Broward prospectus's model/data sections; do not claim its supporting inputs examined from the present partial prospectus coverage." ] }