VA FY2027 VOLUME4 PHYSICAL 201 240 AUDIT

.json · 2 sections · 17690 characters

Source, owner, and dates

workbench: _Working/federal-budget-2026-2027/goal/terra_human/va/batch32/VA_FY2027_VOLUME4_PHYSICAL_201_240_AUDIT.json

Canonical source SHA-256: eca572946e8739c10a5ca1ff7d8caaa20fa5a62eed499b9f30a8af277e68845d

Served copy SHA-256: eca572946e8739c10a5ca1ff7d8caaa20fa5a62eed499b9f30a8af277e68845d

Owner evidence cutoffs: {"federal-budget-fy2026-fy2027": "2026-09-11T19:55:13-04:00"}

These are package-level cutoffs, not a claim that this source was rechecked on those dates. Use its own publication and capture dates.

Owners: federal-budget-fy2026-fy2027

complete text

Opening section

Section 1 of 2

{ "artifact_type": "bounded_full_sequential_CJ_read_receipt", "status": "complete_for_assigned_physical_page_range", "created": "2026-09-11", "source_document": { "identity": "U.S. Department of Veterans Affairs, FY 2027 Budget Submission, Volume 4 of 5: Construction, Long Range Capital Plan and Appendix", "official_url": "https://department.va.gov/wp-content/uploads/2026/04/Volume-4.pdf", "physical_pdf_page_count_observed_in_official_reader": 502, "local_source_path": null, "source_access": "Official PDF reader; no local download/extraction path claimed." }, "page_coverage": { "physical_pdf_pages_read": "201-240 inclusive one-based; official-reader indices P200-P239", "printed_content_covered": "5-6 through 6.2-17; printed 6.1-1 is intentionally blank", "sequential_read_method": "All forty assigned pages read in physical order. Dense project tables were inspected for headers, score/accounting fields, eligibility/approval conditions, named methodology and authorities; rows were not transcribed cell-by-cell.", "next_unread_physical_page_one_based": 241, "next_unread_reader_index": 240, "next_unread_printed_page": "6.2-18", "remaining_scope": "physical pp.241-502 / reader indices P240-P501" }, "claims_and_boundaries": [ { "printed_pages": "5-6 to 5-9", "claim": "The 2027 Construction SCIP list completes with a stated total of $532.714m. The CJ says Table5-1 scores/scopes projects and that some funding decisions were made outside score order; entries are potential or budget-formulation projects.", "status": "FY2027_priority_and_request_table", "boundary": "A score, 2027 budget column, or FYDP marker is not an appropriation, award, completion, or measured project benefit." }, { "printed_pages": "5-10 to 5-16", "claim": "The Lease SCIP list shows $743.027m total current estimated cost and says projects are approved to be awarded in 2027 contingent on contracting timelines, final funding allocations, and for specified major leases Congressional resolution. It includes scored and non-scored rows.", "status": "conditional_approval_and_planning_table", "boundary": "The CJ's conditional 'approved to be awarded' statement does not establish award or execution. Current estimated cost, unserviced-rent thresholds, scores and funding are separate formulation clocks." }, { "printed_pages": "5-17 to 5-22", "claim": "The VHA NRM SCIP list reports $1.821985bn in total estimated project costs and says approval depends on final funding allocations, contracting timelines, and related feasibility studies.", "status": "conditional_NRM_priority_table", "boundary": "NRM score, type (SUS/IM), cost estimate, and described project title are planning fields. Acronyms/project labels are not evidence sources; no feasibility study was read." }, { "printed_pages": "6.1-1 to 6.1-4", "claim": "VA's executive summary describes SCIP as a 10-year gap-analysis and annual budget-formulation effort, shows a $10.4026bn FY2027 Major/Minor/NRM request including $1.45bn anticipated RETF, and states 1,681 above-threshold projects have a $99-$109bn estimated magnitude including activation costs.", "status": "agency_budget_request_and_long_range_estimate", "boundary": "The total request, anticipated RETF, planned NRM obligations, $99-$109bn magnitude, and comparison to earlier estimate ranges are not actual appropriations, obligations, or delivery outcomes. VA states its estimates can change with market conditions and formulation." }, { "printed_pages": "6.2-1 to 6.2-17", "claim": "The SCIP overview specifies gap definitions, a 10-year plan, capital-inventory baseline dated Sept.30,2025, action-plan/BC/SCIP Board and Panel process, analytic-hierarchy methodology, three prioritization lists, a five-year development plan, and 35% design rule for most Major VHA projects.", "status": "agency_method_and_formulation_description", "boundary": "Method/process description does not independently validate the corporate datasets, weights, panel judgments, decision software, gap estimates, project scores, or future costs. It explicitly says SCIP is a management tool that ranks relative criticality, not a mechanism determining funding amounts." }, { "printed_pages": "6.2-6 to 6.2-8", "claim": "VA defines utilization gaps using most-recent VHA workload (2023) against projected 2033 demand, NCA gravesites against projected 2039 demand, and describes lease planning costs as first-year unserviced rent plus build-out, with future-year lease estimates preliminarily mean plus/minus10%.", "status": "baseline_forecast_and_preliminary_cost_method", "boundary": "2023 workload and Sept.30,2025 capital-inventory data are distinct observed baseline dates; 2033/2039 demand, future rent, plus/minus10% planning cost, and project cost refinement are forecasts/method assumptions rather than results." }, { "printed_pages": "6.2-11 to 6.2-17", "claim": "The chapter presents excerpts of the scored construction list, decision-criteria model figures, and FYDP framework. It says FYDP projects are potential current/future requests; most VHA Major projects need 35% design before construction funding can be requested, and selection also depends on execution ability/resources.", "status": "future_funding_planning_and_prioritization", "boundary": "Tables 2-2/2-3 are SCIP excerpts and Table2-4 begins after this batch. Inclusion or a 35%-design claim does not establish design completion, authorization, appropriation, award, or construction." } ], "formulation_inputs_and_named_upstream_objects": [ { "id": "v4_scip_priority_tables_2027", "identity": "Tables5-1, 5-2, 5-4; Table2-2; Table2-3; SCIP scores, BCs, action plans, FYDP markers, and project lists", "type": "VA planning/formulation tables and internal inputs", "printed_CJ_pages": [ "5-6", "5-7", "5-8", "5-9", "5-10", "5-11", "5-12", "5-13", "5-14", "5-15", "5-16", "5-17", "5-18", "5-19", "5-20", "5-21", "5-22", "6.2-10", "6.2-11", "6.2-12", "6.2-13", "6.2-16", "6.2-17" ], "role_in_CJ": "Prioritization/ranking, requests, conditional award planning and outyear-plan inputs.", "status": "agency_formulation_not_independent_evidence", "url": null, "limits": "Underlying business cases, action plans, scores, cost estimates, feasibility studies, funding decisions, awards, and outcomes not read. Listed project names are not upstream evidence sources." }, { "id": "v4_pact_40usc3307_a11_thresholds", "identity": "PACT Act of 2022; 40 U.S.C. \u00a73307; OMB Circular A-11 lease-threshold updates", "type": "law and OMB guidance", "printed_CJ_pages": [ "5-10", "6.2-3" ], "role_in_CJ": "Defines stated major-lease Congressional-approval threshold and lease-list conditions.", "status": "cited_in_CJ_not_read_here", "url": "https://www.congress.gov/117/plaws/publ168/PLAW-117publ168.pdf", "limits": "The two CJ locations give different Circular A-11 dates/threshold sequences: p5-10 says signed Aug.11,2023 and gives FY2024-26 thresholds; p6.2-4 says signed Aug.29,2025 and gives FY2025-27 thresholds, including $4,109,355 FY2027. This receipt preserves rather than reconciles them; no original A-11 review." }, { "id": "v4_scip_feasibility_and_funding_conditions", "identity": "Final funding allocations, contracting timelines, related feasibility studies, and Congressional resolution conditions", "type": "future decision/process inputs", "printed_CJ_pages": [ "5-10", "5-16", "5-17", "6.2-9" ], "role_in_CJ": "Conditions stated for lease/NRM approvals and prospective project movement.", "status": "described_in_CJ_only", "url": null, "limits": "No specific allocation, feasibility study, contract schedule, resolution, award, or approval record was read." }, { "id": "v4_va_capital_asset_inventory_system", "identity": "VA Capital Asset Inventory System", "type": "agency administrative dataset", "printed_CJ_pages": [ "6.2-7" ], "role_in_CJ": "Source identified for the capital inventory with data as of Sept.30,2025.", "status": "named_source_not_read", "url": null, "limits": "No dataset extract, field definitions, validation, or reconciliation read. Inventory snapshot is not a future needs forecast." }, { "id": "v4_scip_corporate_gap_data_fca", "identity": "Corporate gap-data databases; Facility Condition Assessment (FCA) data; corporate targets; planning priorities", "type": "agency data and assessment inputs", "printed_CJ_pages": [ "6.2-7", "6.2-9", "6.2-10" ], "role_in_CJ": "Baseline/forecast gaps, NRM national reprioritization, action plans, and capital need rationale.", "status": "described_in_CJ_only_identity_partly_unresolved", "url": null, "limits": "No database identity, data vintage beyond stated workload/inventory dates, FCA report, target definition, quality control, or project-level analysis was read." }, { "id": "v4_scip_analytic_hierarchy_and_decision_software", "identity": "Analytic hierarchy process; SCIP Board recommendations; governance approval; SCIP Panel scoring; unidentified decision software; figures2-3/2-4/2-5; Appendices A/B/C", "type": "internal decision methodology and governance inputs", "printed_CJ_pages": [ "6.2-9", "6.2-10", "6.2-11", "6.2-14" ], "role_in_CJ": "Develops priority weights, scores construction/lease/NRM business cases and generates ranked lists.", "status": "method_described_in_CJ_only", "url": null, "limits": "No source for criteria weights, Board/Panels' members/records, software identity/version, scoring reliability, objective/subjective response data, or Appendix definitions was read. A rank is not proof of effect or funding." }, { "id": "v4_scip_noncapital_solutions", "identity": "Telemedicine, extended-hours, and purchased community/fee-basis care approaches", "type": "strategy options", "printed_CJ_pages": [ "6.1-3", "6.2-7" ], "role_in_CJ": "Described as possible non-capital approaches to reduce access/space gaps.", "status": "strategy_description_not_evaluation", "url": null, "limits": "No implementation data, comparative evaluation, causal result, scope, or cost analysis read. The examples do not show adoption or effectiveness at any named project." }, { "id": "v4_omb_capital_programming_and_real_property_guidance", "identity": "OMB Capital Programming Guide; OMB M-20-03; M-21-25; M-22-14; M-23-15; OMB guidance on Presidential Memorandum Return to In-Person Work; 40 U.S.C. \u00a7621", "type": "OMB guidance and law", "printed_CJ_pages": [ "6.1-4", "6.2-1" ], "role_in_CJ": "Stated compliance/real-property capital-planning framework for SCIP.", "status": "cited_in_CJ_not_read_here", "url": "https://www.whitehouse.gov/omb/", "limits": "No original guidance/law review or compliance audit. The CJ describes VA's alignment; it does not establish compliance independently." }, { "id": "v4_scip_legislative_requirements", "identity": "P.L.108-422; Senate Report111-226; P.L.114-223 \u00a7258; P.L.114-318 Federal Property Management Reform Act", "type": "law and report collection",

Section 2 (continued)

Section 2 of 2

  "printed_CJ_pages": [
    "6.2-1",
    "6.2-15"
  ],
  "role_in_CJ": "Stated Congressional/Executive foundation for disposal planning, SCIP findings, FYDP budget-document content, and real-property planning.",
  "status": "cited_in_CJ_not_read_here",
  "url": "https://www.congress.gov/",
  "limits": "Original laws/report and their application were not read. P.L.114-223 \u00a7258 is also cited for FYDP's budget-year plus four succeeding-fiscal-years content."
},
{
  "id": "v4_va_mission_act",
  "identity": "VA MISSION Act of 2018",
  "type": "law/strategic guidance",
  "printed_CJ_pages": [
    "6.2-9"
  ],
  "role_in_CJ": "CJ says its principles/guidance encouraged capital and non-capital access solutions in Long Range Action Plan development.",
  "status": "cited_in_CJ_not_read_here",
  "url": "https://www.congress.gov/115/plaws/publ182/PLAW-115publ182.pdf",
  "limits": "No original-law review or evidence that a particular solution resulted from this guidance."
},
{
  "id": "v4_eo14296_crossreference",
  "identity": "Executive Order14296, Keeping Promises to Veterans and Establishing a National Center for Warrior Independence",
  "type": "executive authority",
  "printed_CJ_pages": [
    "6.2-16"
  ],
  "role_in_CJ": "Cross-reference for Manchester and West Los Angeles projects in the FY2027 request.",
  "status": "cited_in_CJ_not_read_here",
  "url": "https://www.federalregister.gov/",
  "limits": "EO text and project implementation records not read in this batch; cross-reference is not an authorization or appropriation."
},
{
  "id": "v4_fydp_design_execution_assumptions",
  "identity": "FYDP, 35% design requirement, design-build exception, potential near-future resource estimate, award-readiness/execution assumption",
  "type": "VA budget-planning process",
  "printed_CJ_pages": [
    "6.2-15",
    "6.2-16"
  ],
  "role_in_CJ": "Explains movement of Major Construction projects into current/future budget requests.",
  "status": "described_in_CJ_only",
  "url": null,
  "limits": "No design record, designation, resource forecast, award readiness analysis, or future appropriation was read. The CJ says estimated total cost is not locked in."
},
{
  "id": "v4_baseline_demand_and_lease_cost_definition",
  "identity": "VHA workload 2023 to projected2033 demand; NCA current gravesites to projected2039 demand; lease planning cost definition",
  "type": "agency baseline, forecast, and cost-method inputs",
  "printed_CJ_pages": [
    "6.2-6",
    "6.2-8"
  ],
  "role_in_CJ": "Defines utilization-gap baselines/forecasts and preliminary lease cost representation used in planning.",
  "status": "described_in_CJ_only",
  "url": null,
  "limits": "2023 workload is a stated baseline; 2033/2039 demands and mean plus/minus10% lease planning cost are forecasts/method assumptions. No underlying data/model read."
}

], "accounting_clock_and_measure_handling": { "observed_baselines": [ "VHA workload 2023", "VA Capital Asset Inventory data as of Sept.30,2025", "SCIP 2027 project counts and FY2027 lists as stated in submission" ], "request_or_conditional_approval": [ "FY2027 Construction/Lease/NRM table entries", "conditional lease and NRM award/approval language", "$10.4026bn FY2027 capital request and anticipated RETF" ], "forecast_or_model": [ "2033 outpatient/bed demand and 2039 gravesite demand", "$99-$109bn 10-year estimated magnitude including activation", "project scores/weights, long-range action plan, FYDP, 35%-design rule, preliminary lease cost mean plus/minus10%, market-sensitive estimates", "future award and resource scenarios" ], "separation_rule": "SCIP scores and project lists are relative-priority/formulation artifacts. VA itself says SCIP ranks need/criticality and is not a mechanism determining funding amounts; no prospective amount, score, condition, or named project is treated as an actual executed result." }, "remaining_work": [ "Continue at physical p241 / reader P240 / printed6.2-18; FYDP table begins at that boundary.", "Read original sources before relying on OMB guidance/Circular A-11, statutes/reports, PACT/MISSION/EO authorities, Capital Asset Inventory, FCA/gap data, business cases/action plans, analytics weights/software, or feasibility studies.", "The construction/lease/NRM lists and Chapter6.2 figures/appendices are source-located or partly read internal material; no upstream data or implementation outcome is complete." ], "corrections": [ { "date": "2026-09-11", "scope": "printed-page locator correction after primary local-PDF heading verification", "replaces": { "v4_pact_40usc3307_a11_thresholds": "6.2-4", "v4_va_capital_asset_inventory_system": "6.2-8", "claims_and_boundaries[5]": "6.2-7 to 6.2-10" }, "with": { "v4_pact_40usc3307_a11_thresholds": "6.2-3", "v4_va_capital_asset_inventory_system": "6.2-7", "claims_and_boundaries[5]": "6.2-6 to 6.2-8" }, "adds": "v4_baseline_demand_and_lease_cost_definition locates workload2023/projected2033 at6.2-6 and lease-cost definition at6.2-8.", "verification": "Primary inspected local PDF physical227-233 against printed headings. Analytic-hierarchy locator6.2-9 was already correct.", "limit": "This correction changes locators/record precision only; no upstream original was read." } ] }