.md · 1 sections · 4389 characters
vault: 02 - Research/Official Records/Official filings/2026-08-26-0000 - Declaring a National Emergency to Secure the United States Bulk-Power System.md
Canonical source SHA-256: c75e276f172bf0dd2796e3328744f0b67c3d20cc9a0e1b53127ea47872a64407
Served copy SHA-256: c75e276f172bf0dd2796e3328744f0b67c3d20cc9a0e1b53127ea47872a64407
Owner evidence cutoffs: {"official-records-source-library": "2026-10-14"}
These are package-level cutoffs, not a claim that this source was rechecked on those dates. Use its own publication and capture dates.
Owners: official-records-source-library
Section 1 of 1
# Declaring a National Emergency to Secure the United States Bulk-Power System
NOW, THEREFORE, I, DONALD J. TRUMP, President of the United States of America, find that the situation with respect to the foreign supply of bulk-power system electric equipment constitutes an unusual and extraordinary threat, which has its source in whole or substantial part outside the United States, to the national security, foreign policy, and economy of the United States and hereby declare a national emergency with respect to that threat.
The following actions are prohibited: any acquisition, importation, transfer, or installation of any foreign-produced bulk-power system electric equipment (transaction) by any person, or with respect to any property, subject to the jurisdiction of the United States, … where the transaction was initiated after the date of this order, and where the Secretary of Energy (Secretary), in coordination with the Director of the Office of Management and Budget and in consultation with [named heads], has determined that: (i) the transaction involves bulk-power system electric equipment — or any critical component, software, firmware, digital service, maintenance service, or remote-access capability associated with such equipment — designed, developed, manufactured, or supplied by persons owned by, controlled by, or subject to the jurisdiction or direction of a Covered Foreign Entity; and (ii) the transaction: (A) poses an undue risk of sabotage, subversion, unauthorized access, malicious remote action, or supply disruption …; (B) poses an undue risk of catastrophic effects on the security or resilience of United States critical infrastructure or the economy of the United States; or (C) otherwise poses an unacceptable risk to the national security of the United States or the security and safety of United States persons.
Within 120 days of the date of this order, the Secretary, in consultation with the Secretary of War, the Secretary of Homeland Security, the Director of National Intelligence, and any other senior executive branch official the Secretary deems appropriate, shall publish rules or regulations implementing the authorities delegated to the Secretary by this order as needed.
OFR identity, from Public Inspection PDF 2026-17843 and the Federal Register API document record: Executive Order 14421, FR Doc. 2026-17843, 91 FR 55995–55999, signed August 26, 2026, filed 8/28/2026 11:15 am, scheduled book publication 2026-08-31. Monday 2026-08-31: Federal Register book publication occurred as 91 FR 55995–55999 (Clerk opened the published document JSON and GovInfo PDF). HTML record: https://www.federalregister.gov/documents/2026/08/31/2026-17843/declaring-a-national-emergency-to-secure-the-united-states-bulk-power-system
White House presidential-actions page still prints Executive Order 14420 on this same instrument (https://www.whitehouse.gov/presidential-actions/2026/08/declaring-a-national-emergency-to-secure-the-united-states-bulk-power-system/). That display number is already the August 10 vaccine order. Preserve the collision as provenance. OFR/FR 14421 / 2026-17843 controls identity. No time-of-day on the instrument dateline or the White House page; 11:15 am is the OFR filing clock on August 28, not a signing time.
Claim limit: The order declares the emergency and authorizes Energy determinations, implementing rules (120-day “as needed” gate), possible later conditions on pre-order equipment, and later FAR-revision recommendations. Section 2(a) prohibitions run only after the named Energy determination (Covered Foreign Entity + risk). The text does not itself ban a named vendor, order a replacement, or disconnect any installed equipment.
This is the IEEPA/NEA leash on foreign bulk-power equipment: a declared emergency plus a determination-and-rules machine. The grid story is the authorization, not a completed rip-and-replace.