.md · 1 sections · 1949 characters
workbench: _Working/federal-budget-2026-2027/goal/terra_human/va/batch27/REPORT.md
Canonical source SHA-256: 1af802b81ee4b659b6a276849e4f0f27e2ebf14aaf7f35c08e0913ef03d4a34b
Served copy SHA-256: 1af802b81ee4b659b6a276849e4f0f27e2ebf14aaf7f35c08e0913ef03d4a34b
Owner evidence cutoffs: {"federal-budget-fy2026-fy2027": "2026-09-11T19:55:13-04:00"}
These are package-level cutoffs, not a claim that this source was rechecked on those dates. Use its own publication and capture dates.
Owners: federal-budget-fy2026-fy2027
Section 1 of 1
# VA FY2027 Volume 4 — physical pages 0–39
The official PDF is Volume 4 of 5: Construction, Long Range Capital Plan and Appendix, dated March 2026. VA’s budget page labels it 424 pages, while the official PDF reader reports 502 physical pages. This receipt retains both values and uses the 502-page physical denominator.
Physical pages 0–39 were read sequentially: cover, blank page, TOC, the full Introduction, Construction Summary, and Construction–Major through printed 2-20. The next unread physical page is 40, expected to begin printed 2-21.
The front matter describes a formulation system rather than a demonstrated construction outcome. SCIP combines 10-year gap data, projected need, action plans, business cases, panel ratings, and leadership-approved weights. VA says project selection can also depart from score order for policy, studies, execution readiness, and scheduling. The $98–109 billion full-SCIP figure is explicitly a changing snapshot, not a funded commitment.
The request is $5.4 billion in construction resources: $3.95 billion discretionary appropriations and $1.45 billion anticipated RETF resources. The latter is a planned end-of-2027 transfer of unobligated balances, not enacted or realized funds. Major Construction proposes $3.089 billion appropriations plus $1.3 billion anticipated RETF resources.
The first two prospectuses reinforce the uncertainty boundary. Indianapolis requests $1.642 billion, and San Antonio requests $30 million for land acquisition; both show total cost as TBD until 15% design and/or Army Corps acceptance. Indianapolis’s 2024 market data are an observed baseline, but its 2029–2044 workload/demographic values are forecasts. An unnamed “high-level market research” input underlies one alternative analysis and remains unresolved.
The JSON contains the complete cited-authority/process/data census, each printed locator, role, status, and limit. No maintained file was edited.