Skip to content
Browse the whole research Library · Start page for AI agents ·

GAO IG APPENDIX AND USDA SOURCE CHAIN

.json · 2 sections · 19930 characters

Source, owner, and dates

workbench: _Working/federal-budget-2026-2027/goal/terra_institutions/gsa/batch3/GAO_IG_APPENDIX_AND_USDA_SOURCE_CHAIN.json

Canonical source SHA-256: 0a529fc476a3972246cfe39ae4b2ca08f3a3788f8bfa96c70753c83e70f2db33

Served copy SHA-256: 0a529fc476a3972246cfe39ae4b2ca08f3a3788f8bfa96c70753c83e70f2db33

Owner evidence cutoffs: {"federal-budget-fy2026-fy2027": "2026-09-11T19:55:13-04:00"}

These are package-level cutoffs, not a claim that this source was rechecked on those dates. Use its own publication and capture dates.

Owners: federal-budget-fy2026-fy2027

complete text

Opening section

Section 1 of 2

{ "artifact": "GSA FY2027 CJ — GAO-IG Act appendix and USDA FCRF project evidence chain", "created_date": "2026-09-11", "scope": "Rendered/OCR review of CJ PDF pages 342-396; bounded official-source trace of the FBF/FCRF USDA consolidation proposal.", "primary_source": { "title": "GSA FY 2027 Congressional Justification", "url": "https://www.gsa.gov/system/files/GSA%20FY%202027%20Congressional%20Justification-508.pdf", "publication_or_document_date": "2026-04-30 PDF modification date; GAO-IG Act report dated 2026-03-24", "local_source": "/tmp/gsa-fy2027-cj.pdf", "read_status": "Pages 342-396 rendered from the downloaded official PDF and visually/OCR read. OCR is used as a transcription aid; rows with an unreadable recommendation number remain explicitly marked rather than inferred. Pages 395-396 are an acronym appendix, not recommendation records." }, "appendix_structure": [ {"pdf_pages":"342-344","printed_pages":"cover-2","section":"GAO-IG Act annual-report cover, contents, and statutory report overview","read_status":"full"}, {"pdf_pages":"345-352","printed_pages":"3-10","section":"GAO Recommendation Status and Timelines","read_status":"full rendered/OCR table read"}, {"pdf_pages":"353-383","printed_pages":"11-41","section":"OIG Recommendation Status and Timelines","read_status":"full rendered/OCR table read"}, {"pdf_pages":"384-394","printed_pages":"42-52","section":"GSA-OIG 2024 Semiannual Performance Audit Reconciliation","read_status":"full rendered/OCR table read"}, {"pdf_pages":"395-396","printed_pages":"53-54","section":"Acronyms","read_status":"full"} ], "statutory_scope": "The report states that the Good Accounting Obligation in Government Act, P.L. 115-41, requires the annual budget submission to list qualifying public GAO and OIG recommendations open at least one year, include implementation timelines/explanations, and reconcile discrepancies with the OIG semiannual report and GAO public reporting (PDF 344). Dated March 24, 2026, it is prior oversight/status material compiled for the FY2027 CJ. The CJ does not identify it as a causal analytic basis for formulation of any FY2027 account request.", "recommendation_inventory": { "method": "Each item records the source-page span, report, recommendation identifiers visible in the rendered table, concise recommendation subject, and table status. Semicolon-separated IDs are separate recommendations. 'id_unreadable' means the table row was visually available but the printed ID was not reliably legible after high-resolution rendering/OCR; no number is invented.", "ga_o_open_status": [ {"pages":"345","report":"GAO-14-648","title":"Federal Real Property: GSA and DHS Need to Strengthen the Management of DHS Headquarters Consolidation","recommendations":["002"],"subject":"Develop revised DHS-headquarters cost and schedule estimates consistent with GSA guidance/leading practices, including independent evaluation.","status":"Partially addressed; GAO continues collecting documentation supporting updated estimates."}, {"pages":"346","report":"GAO-20-135","title":"Federal Real Property: GSA Should Improve Accuracy, Completeness, and Usefulness of Public Data","recommendations":["001"],"subject":"Coordinate with agencies on complete, correctly formatted public-database street addresses.","status":"Partially addressed; GAO monitoring."}, {"pages":"346","report":"GAO-24-105485","title":"Federal Real Property: Agencies Should Provide More Information About Increases in Deferred Maintenance and Repair","recommendations":["010","011"],"subject":"Explain major DM&R changes, asset categories, and mission proportion; develop a backlog-reduction plan with funding and timeframes.","status":"010 partially addressed/GAO monitoring; 011 implementing, timeline 2026-03-31."}, {"pages":"347","report":"GAO-24-105658","title":"Cybersecurity: Federal Agencies Made Progress, but Need to Fully Implement Incident Response Requirements","recommendations":["016"],"subject":"Fully implement OMB-directed event-logging requirements.","status":"Implementing, timeline 2026-09-30."}, {"pages":"347","report":"GAO-24-105980","title":"Artificial Intelligence: Agencies Have Begun Implementation but Need to Complete Key Requirements","recommendations":["032"],"subject":"Complete and align GSA AI use-case inventory.","status":"Partially addressed; GAO monitoring."}, {"pages":"347","report":"GAO-24-106166","title":"Federal Contracting: Opportunities Exist to Improve the Reporting of Waivers to Domestic Preference Laws","recommendations":["007"],"subject":"Document remaining website development/resources with OMB through a formal agreement.","status":"MFR submitted/forwarded to GAO; GAO evaluating for closure."}, {"pages":"348","report":"GAO-23-104815","title":"Federal Real Property: GSA Should Leverage Lessons Learned from New Sale and Transfer Process","recommendations":["001"],"subject":"Collect, share, apply, and report FASTA disposal lessons learned.","status":"Partially addressed; GAO monitoring."}, {"pages":"348-349","report":"GAO-24-106173","title":"Single Audits: Improving Federal Audit Clearinghouse Information and Usability Could Strengthen Federal Award Oversight","recommendations":["001","002","003","008"],"subject":"Address FAC data reliability; prioritize oversight features; propose funding/timelines; train users to complete data forms accurately.","status":"Each shown as addressed; GAO evaluating for closure."}, {"pages":"349","report":"GAO-24-106324","title":"Federal Real Property: More Consistent Public Monitoring of Asbestos Could Improve Oversight","recommendations":["001"],"subject":"Implement or revise asbestos-inspection policy, including funding/timeline/database actions.","status":"Addressed; GAO monitoring implementation."}, {"pages":"350","report":"GAO-25-106640","title":"Identity Verification: GSA Needs to Address NIST Guidance, Technical Issues, and Lessons Learned","recommendations":["001","003"],"subject":"Address Login.gov technical challenges and document remote identity-proofing lessons learned.","status":"Addressed; GAO evaluating for closure."}, {"pages":"350","report":"GAO-25-107000","title":"Identity Verification: GSA Should Demonstrate Its Implementation of Policies for Testing Data Backups on Login.gov","recommendations":["001"],"subject":"Demonstrate full implementation of Login.gov data-backup testing policy.","status":"Addressed; GAO evaluating for closure."}, {"pages":"351","report":"GAO-25-107041","title":"IT Portfolio Management: OMB and Agencies Are Not Fully Addressing Selected Statutory Requirements","recommendations":["036"],"subject":"Direct GSA CIO to conduct annual IT-portfolio reviews with the Federal CIO as FITARA prescribes.","status":"Addressed; GAO evaluating for closure."}, {"pages":"351-352","report":"GAO-25-107392SU","title":"Future of Cybersecurity: Federal Actions Needed to Prepare for Quantum Computing Threat","recommendations":["063","064","065"],"subject":"Recommendation text marked Sensitive in the public table.","status":"Implementing; listed timelines 2026-04-31, 2026-09-30, and 2028-09-30 respectively (date reproduced exactly; April 31 is invalid calendar date)."}, {"pages":"352","report":"GAO-25-107469","title":"Federal Spending Transparency: Actions Needed to Help Ensure Procurement Data Quality","recommendations":["010","011","012"],"subject":"Document sampling procedures; set two-way data-quality communications; modernize remaining IAE legacy systems.","status":"010 addressed/GAO evaluating closure; 011-012 implementing, 2026-08-31."} ], "oig_open_status": [ {"pages":"353-355","report":"A170119P6R20001","title":"Child Care Centers in GSA-Controlled Buildings Have Significant Security Vulnerabilities","recommendations":["001","002A","002B","002C","002D","002E","003"],"subject":"Maintain safe child-care locations; remediate identified/redacted vulnerabilities; assess all centers and move them if safety cannot be achieved.","status":"Implementing, timeline 2026-08-31."}, {"pages":"355-358","report":"A201018P4R24005","title":"Audit of GSA's Response to COVID-19: PBS Faces Challenges to Ensure Water Quality in GSA-Controlled Facilities","recommendations":["002A","002B","002C","003","005","id_unreadable (PDF 357)","008","009A","009B","009C"],"subject":"Nationwide water-quality controls, policy alignment, contract/NCMMS handling, tenant access/results notification, and reduced-use/child-care testing.","status":"Implementing; table gives 2026-04-31 for all shown rows (reproduced exactly; invalid calendar date)."}, {"pages":"359-361","report":"A230020BTF24004","title":"GSA Should Strengthen the Security of Its Robotic Process Automation Program","recommendations":["001","002","003","id_unreadable (PDF 359)","005","id_unreadable (PDF 360)","007A","007B","007C"],"subject":"RPA-policy assessment, oversight, security plans/controls, and bot-access removal controls.","status":"Implementing, timeline 2026-08-31."}, {"pages":"361","report":"A240028ITF24006","title":"Audit of GSA's Compliance with the Geospatial Data Act of 2018","recommendations":["002"],"subject":"Ensure IOLP and FRPP MS latitude/longitude accuracy except national-security exemptions.","status":"Implementing, 2026-04-30."}, {"pages":"362","report":"A230074M6F25002","title":"The Office of Government-Wide Policy's Procurement Management Review Division Should Strengthen Its Reporting Function","recommendations":["002"],"subject":"Training and oversight for proper CAP administration and closeout.","status":"Evaluating for closure."}, {"pages":"362-364","report":"A240064P2R25002","title":"Safety and Accessibility Deficiencies at the Jacob K. Javits Federal Building in New York, New York","recommendations":["001A","001B","001C","002A","002B","003"],"subject":"Fire/worker-safety remediation, contractor oversight, ABAAS signage/cataloging/remediation, and EHSF notifications.","status":"Implementing, 2026-09-30."}, {"pages":"365-366","report":"A240046P2R25003","title":"PBS Should Improve Its Oversight of the Energy Savings Performance Contract in Texas and Louisiana","recommendations":["001A","001B","001C","002","003"],"subject":"M&V training/witnessing, contractor conflicts, communication, and FAR-compliant changes.","status":"Implementing, 2026-06-30."}, {"pages":"366-367","report":"A240066H3F25003","title":"GSA's Office of Administrative Services Awarded an Invalid $13.7 Million Task Order","recommendations":["001","002","003","id_unreadable (PDF 367)"],"subject":"Competition documentation/posting, accountability, QA-risk sampling, and lower threshold for legal review.","status":"Implementing, 2026-04-30."}, {"pages":"367-370","report":"A240037Q6P25001","title":"GSA's Technology Transformation Services Violated Hiring Rules and Overpaid Incentives","recommendations":["001","002","003A","003B","003C","003D","id_unreadable (PDF 369)","005","id_unreadable (PDF 370)"],"subject":"DHA/hiring controls, merit competition/documentation, incentive/SQA reviews, job classification, and equal-pay controls.","status":"Determining; final CAP submitted dates shown as 2026-02-10, 2025-12-23, and 2025-10-08 by row."}, {"pages":"370-372","report":"A240041P9R25004","title":"Audit of Roof Fall Protection and Safety in GSA-Owned Buildings","recommendations":["001","002","003","id_unreadable (PDF 371)","005","id_unreadable (PDF 371)","007","008","id_unreadable (PDF 372)","010"],"subject":"Roof inspections, contractor safety plans, COR training, fall protection/hazards, IRIS risk conditions, replacement reviews, and signage.","status":"Determining; final CAP submitted 2025-10-08."},

Section 2 (continued)

Section 2 of 2

  {"pages":"373-378","report":"A230079P4R25005","title":"PBS's Pacific Rim Region Grossly Mismanaged the Battery Energy Storage Systems at the Glenn M. Anderson Federal Building and the Ronald Reagan Federal Building and U.S. Courthouse, Resulting in Health and Safety Issues","recommendations":["001","002","005A","005B","005C","005D"],"subject":"Battery-system compliance/training and Pacific Rim management/fire-department/certificate-of-occupancy actions.","status":"Implementing; 001/002/005A/005B 2026-08-14; 005C/005D 2026-02-27."},
  {"pages":"378-383","report":"A230058P5R25006","title":"PBS's Administration of Construction Manager as Constructor Contracts Needs Improvement","recommendations":["001A","001B","001C","002A","002B","002C","002D","002E","003A","003B","id_unreadable (PDF 383)"],"subject":"CMc training, fee/cost controls, contract administration, reconciliation, approval controls, and recovery of excessive fees.","status":"Implementing, 2026-09-30."},
  {"pages":"383","report":"A250032P6R26001","title":"Audit of the Impact and Cost of Crime on GSA Building Operations","recommendations":["001"],"subject":"Coordinate with federal law enforcement on security risks at GSA-owned buildings.","status":"Determining; final CAP submitted 2025-10-08."},
  {"pages":"383","report":"JE26-001","title":"Public Buildings Service Is Not Providing Oversight Of Maintenance For Indoor Firing Ranges In GSA-Owned Buildings","recommendations":["001","002"],"subject":"Assess Oroville LPOE target retrieval system and establish indoor-range operations/maintenance policy.","status":"Implementing; 2026-04-30 and 2026-11-30 respectively."}
],
"oig_2024_semiannual_reconciliation": [
  {"pages":"384","report":"A150009P4R17006","title":"PBS National Capital Region's $1.2 Billion Energy Savings Performance Contract for White Oak was Not Awarded or Modified In Accordance with Regulations and Policy","recommendations":["001"],"subject":"Expedite competitively compliant O&M procurement.","status":"Implemented management decision; OIG disagreed on CICA requirements; final action."},
  {"pages":"385","report":"A150132P4R17001","title":"GSA's Decisions to Vacate And Renovate the Leased Federal Courthouse in Pensacola Are Based on Faulty Premises and Assumptions","recommendations":["001"],"subject":"Reanalyze housing options with comparable management alternatives, appraisals, costs, and historically grounded schedules.","status":"Implemented management decision; GSA disagreed and selected relocation; final action."},
  {"pages":"386","report":"JE18-002","title":"Evaluation of GSA Non-Disclosure Policy Inquiries","recommendations":["001"],"subject":"Clarify policy on communications with Members of Congress.","status":"Implemented management decision; GSA disagreed; final action."},
  {"pages":"386","report":"JE19-002","title":"Evaluation of GSA's Management and Administration of the Old Post Office Building Lease Clauses","recommendations":["001"],"subject":"Formally review/revise interested-parties lease language.","status":"Implemented management decision; final action."},
  {"pages":"387","report":"A140143Q6P21002","title":"GSA's Transactional Data Reporting Pilot is Not Used to Affect Pricing Decisions","recommendations":["001","002"],"subject":"Restrict pilot/use of data and develop exit strategy.","status":"Implemented management decision; GSA disagreed; final action."},
  {"pages":"388-392","report":"A200975Q3P22002","title":"FAS Cannot Provide Assurance That MAS Contract Pricing Results in Orders Achieving the Lowest Overall Cost Alternative","recommendations":["001","002","003A","003B","003C"],"subject":"Cancel TDR; require independent price determinations; strengthen CSP/price-analysis controls and option-extension policy.","status":"Not implementing; table records FAS rationale and final action."},
  {"pages":"393-394","report":"A210064A3F23002","title":"GSA's Administration of Performance-Based Service Contracts Puts the Government at Risk of Unsatisfactory Contractor Performance and Wasted Funds","recommendations":["001B","004"],"subject":"Clear QASP instructions and management oversight of contractor performance.","status":"Implemented corrective action plan; final action."}
]

}, "usda_fcrf_project": { "project_name_as_cj": "Jamie L. Whitten Federal Building and Sidney R. Yates Federal Building Consolidation and the Agriculture South Federal Building Disposal Project", "cj_locators": [ {"pages":"74-75 (FBF-52 in accessible non-508 CJ)","claim":"Project description, funding structure, $375,112,500 total up-front, $25,112,500 first installment, $112,500/0.03% FCRF administration fee, 15 installments; consolidates USDA into Whitten/Yates and disposes of Agriculture South.","source_url":"https://origin-www.gsa.gov/system/files/GSA%20FY%202027%20Congressional%20Justification.pdf"}, {"pages":"73-75 (FBF-52 in accessible non-508 CJ; FBF pages in 508 CJ)","claim":"GSA says disposal of Agriculture South will eliminate over $1 billion in delinquent-maintenance liabilities and $15.2 million in annual O&M costs, while achieving a substantial space reduction. The project also requires critical infrastructure so Whitten can operate independently and alterations, move, IT, and furniture for USDA employees.","source_url":"https://origin-www.gsa.gov/system/files/GSA%20FY%202027%20Congressional%20Justification.pdf"}, {"pages":"21-85 (FBF narrative)","claim":"FBF describes portfolio project-selection factors—customer/master plans, condition/security/functionality/occupancy, lease avoidance/ROI, utilization, and risk/return—but does not publish a project-specific USDA appraisal, DCF, engineering estimate, condition assessment, or cost model in these pages.","source_url":"https://www.gsa.gov/system/files/GSA%20FY%202027%20Congressional%20Justification-508.pdf"} ], "source_chain_assessment": { "published_gsa_decision_input": "CJ project description and requested financing/repayment terms; a project-specific GSA assertion that Agriculture South disposal will eliminate over $1 billion in delinquent-maintenance liabilities and $15.2 million annual O&M costs; general FBF selection criteria.", "project_specific_independent_evidence_located": "None in the bounded official-source review.", "bounded_searches": [ "Official GSA FY2027 CJ (508 and accessible/non-508 routes).", "Official GSA historic-building page for Jamie L. Whitten Federal Building: https://www.gsa.gov/real-estate/explore-historic-buildings/find-a-historic-federal-building/jamie-l-whitten-federal-building-washington-dc", "Targeted official-domain queries for the named Agriculture South disposal/consolidation project and USDA connection." ], "not_found_or_not_published_in_reviewed_material": [ "Project-specific independent appraisal or appraisal review.", "Project-specific benefit-cost analysis, DCF/ROI model, lease-avoidance calculation, or operating-cost baseline.", "Project-specific facility-condition assessment, engineering estimate, utilization study, or USDA move/occupancy plan.", "An external validation of the $375 million project amount, installment schedule, or GSA's project-specific $1 billion/$15.2 million savings assertions." ], "interpretation_limit": "Absence is only a result of the bounded search and CJ review. It does not establish that internal GSA/USDA, OMB, appraiser, or contractor materials do not exist. The CJ presents request rationale and financing terms, not a disclosed independently reviewed project model." } }, "budget_use_boundary": "The appendix supplies oversight context, including a DHS recommendation expressly calling for independently evaluated cost/schedule estimates, and multiple PBS contract/real-property control findings. It does not itself justify, validate, or calculate the proposed USDA FCRF transaction. The USDA figures remain GSA proposal assertions unless an underlying study is produced." }