.md · 1 sections · 1192 characters
workbench: _Working/federal-budget-2026-2027/goal/terra_human/va/batch33/REPORT.md
Canonical source SHA-256: efbae6a38c231df98afc4a50c83058c2d10b9b13f4f1ab0cffe7b7b908311b99
Served copy SHA-256: efbae6a38c231df98afc4a50c83058c2d10b9b13f4f1ab0cffe7b7b908311b99
Owner evidence cutoffs: {"federal-budget-fy2026-fy2027": "2026-09-11T19:55:13-04:00"}
These are package-level cutoffs, not a claim that this source was rechecked on those dates. Use its own publication and capture dates.
Owners: federal-budget-fy2026-fy2027
Section 1 of 1
# VA FY2027 Volume 4 — batch 33
Read physical PDF pages 241–280 (official-reader P240–P279) sequentially, covering printed pages 6.2-17 through 6.2-56. The next unread page is physical 281 / reader P280 / printed 6.2-57.
This span completes the FYDP table, describes lease/NRM and activation-cost methods, and begins the large potential future/outyear-project inventory. The receipt separates funding through FY2026, annual FY2027–31 plan fields, remaining need after 2031, preliminary project costs, and aggregate model ranges. It does not treat a plan entry, cost, label, or project type as enacted funding, award, completion, or evidence of use.
The NRM statutory citation anomaly is preserved. The activation model, A-11 test, EHRM statements, FCA/assessment labels, and energy-performance-contract mention remain unexpanded source leads. No maintained file was changed.
Locator correction (2026-09-11): direct extraction of /tmp/va_fy27_volume4.pdf (502 pages) corrected a systematic one-page printed-label offset in the original draft. The JSON correction record retains the superseded labels and verifies physical247 = 6.2-23, physical250 = 6.2-26, and physical251 = 6.2-27.