Skip to content
Browse the whole research Library · Start page for AI agents ·

USDA FY2027 ARS PHYSICAL 41 52 RECEIPT

.json · 1 sections · 9360 characters

Source, owner, and dates

workbench: _Working/federal-budget-2026-2027/goal/terra_institutions/agriculture/batch6/USDA_FY2027_ARS_PHYSICAL_41_52_RECEIPT.json

Canonical source SHA-256: 2f7c82863feb52507933fe739fb4070493fdaef81d95ea5f76b8ee91418af6eb

Served copy SHA-256: 2f7c82863feb52507933fe739fb4070493fdaef81d95ea5f76b8ee91418af6eb

Owner evidence cutoffs: {"federal-budget-fy2026-fy2027": "2026-09-11T19:55:13-04:00"}

These are package-level cutoffs, not a claim that this source was rechecked on those dates. Use its own publication and capture dates.

Owners: federal-budget-fy2026-fy2027

complete text

Opening section

Section 1 of 1

{ "record_type": "bounded_document_read_and_reference_census", "created_date": "2026-09-12", "scope_status": "partial_document_read_complete; combined with the separately owned human receipt, the 52-page Chapter 20 document is covered", "source": { "title": "2027 USDA Explanatory Notes — Agricultural Research Service, Chapter 20", "official_url": "https://www.usda.gov/sites/default/files/documents/FY-2027-Chapter-20-ARS.pdf", "publisher": "U.S. Department of Agriculture", "pdf_pages_total": 52, "access_method": "Official USDA PDF source reader; direct local download was not used as source text.", "local_source_path": null }, "selection_and_nonoverlap": { "task": "Continue ARS after the human owner completed physical pages 1–40; do not count that overlap as this batch's work.", "human_receipt": "_Working/federal-budget-2026-2027/goal/terra_human/agriculture/batch1/USDA_FY2027_ARS_PHYSICAL_1_40_AUDIT.json", "this_batch_only": "physical PDF pages 41–52 / zero-based reader pages P40–P51 / printed pages 20-41–20-52", "excluded": "NASS Chapter 19 human lane; no independent original, POR, cost estimate, design package, audit, or construction record was fetched." }, "coverage": { "full_sequential_read_this_batch": { "physical_pdf_pages_one_based": "41–52 inclusive", "zero_based_reader_pages": "P40–P51 inclusive", "printed_pages": "20-41–20-52 inclusive", "sections": [ "Buildings & Facilities account: lead-off and appropriation/funding-detail tables (20-41–20-42)", "Buildings & Facilities obligations and object classification (20-43–20-45)", "Status of Construction, dated as of December 2025 (20-46–20-52)" ] }, "combined_document_boundary": "Human receipt covers physical pages 1–40 / printed 20-1–20-40. This batch covers 41–52 / printed 20-41–20-52. There is no remaining page in this 52-physical-page document.", "read_method_limit": "All prose and tables in the stated twelve-page range were read sequentially. A listed project, facility, award expectation, planning label, or construction status was not treated as an independently reviewed study or causal explanation." }, "accounting_and_clock": { "table_basis": "Tables distinguish FY2024 actual, FY2025 actual, FY2026 enacted, and FY2027 estimated. The status table reports conditions as of December 2025 and includes past actions plus future expectations; it is not an implementation record after the FY2027 request.", "FY2027_request": { "appropriation": "$0; Table ARS-16 shows a $60.650 million decrease from the FY2026 estimate/enacted amount to no FY2027 B&F budget estimate.", "source_locator": "printed 20-41, Table ARS-16" }, "appropriations_vs_resources": { "total_appropriation_thousands": {"FY2024_actual": 57164, "FY2025_actual": 42500, "FY2026_enacted": 60650, "FY2027_estimated": 0}, "total_available_thousands": {"FY2024_actual": 259563, "FY2025_actual": 173898, "FY2026_enacted": 188496, "FY2027_estimated": 84317}, "total_obligations_thousands": {"FY2024_actual": 137366, "FY2025_actual": 46052, "FY2026_enacted": 104179, "FY2027_estimated": 62592}, "explanation": "The FY2027 estimated $62.592 million in obligations is not a new FY2027 B&F appropriation: Tables ARS-17 and ARS-19 show balances, recoveries, and prior supplemental/disaster funding in the resource/obligation picture.", "source_locators": ["printed 20-41, Table ARS-17", "printed 20-43, Table ARS-19"] }, "allocation_observation": "Table ARS-18 allocates the FY2026 $60.650 million among one B&F line and community-based projects; FY2027 estimated appropriations are zero for those entries. Table ARS-20 nevertheless contains FY2027 estimated obligations for projects, including Manhattan NBAF capital improvement ($3.555 million), certain co-located facilities, community-based projects, and disaster-relief work.", "source_locators": ["printed 20-42, Table ARS-18", "printed 20-43–20-45, Table ARS-20", "printed 20-45, Table ARS-21"] }, "change_and_status_inventory": [ { "claim": "The FY2027 B&F budget estimate is zero, a $60.650 million decrease from FY2026.", "locator": "20-41, Table ARS-16", "state": "FY2027 request/estimate, not enacted FY2027 funding" }, { "claim": "FY2027 estimated total obligations are $62.592 million, $41.587 million below FY2026 enacted/estimated obligations of $104.179 million.", "locator": "20-43, Table ARS-19", "state": "agency estimate using available balances and prior resources, not a new appropriation" }, { "claim": "The construction status table says certain Beltsville/Urbana projects are on hold pending proposed closure.", "locator": "20-47–20-49", "state": "December 2025 agency status statement; it does not establish that a closure was approved or implemented" }, { "claim": "The table contains actual completed actions, ongoing contracts, and future award/completion expectations, each with its own stated clock.", "locator": "20-46–20-52", "state": "do not collapse planned awards, expected completions, awarded construction, and completed work into one operating status" } ], "named_formulation_or_process_inputs": [ { "id": "ars_program_of_requirement_por_family", "type": "internal planning study/document family", "identity": "Program of Requirement (POR): document defining a research program, associated space/equipment needs, and design criteria.", "citing_pages": ["20-46", "20-50"], "role": "The construction-status table supplies this definition and records that the St. Paul POR was completed in Q4 FY2025.", "read_status": "identified in CJ only; no particular POR was located or read", "reliance_boundary": "A POR is a project planning input, but this CJ does not publish a POR method, alternatives analysis, cost estimate, or link it to the FY2027 zero-appropriation decision." }, { "id": "ars_design_and_construction_status_reporting", "type": "agency administrative project-status process", "identity": "Design is defined as conceptual (35 percent) or complete (100 percent); status table is stated as of December 2025.", "citing_pages": ["20-46–20-52"], "role": "status/reporting framework for prior-year authorized or funded facilities reported uncompleted in the FY2026 explanatory notes", "read_status": "CJ passage read; underlying project records not read", "reliance_boundary": "It describes project condition and expected next actions, not an evaluation demonstrating the proposed FY2027 appropriation reduction." }, { "id": "ars_b_and_f_resource_tables", "type": "agency budget accounting tables", "identity": "Tables ARS-16 through ARS-21", "citing_pages": ["20-41–20-45"], "role": "source for request, enacted comparator, balances, recoveries, total available, obligation estimates, allocations, and object classification", "read_status": "CJ tables read", "reliance_boundary": "These are budget presentation/accounting inputs. They do not disclose a cost model, scoring model, or performance causal estimate for the B&F request." } ], "named_objects_not_promoted_to_evidence": { "projects_and_facilities": "The tables list individual facilities, community-based projects, planning/design/construction labels, awards, and anticipated completions. They were kept as project/status entries rather than multiplied into a census of studies or treated as source evidence.", "unidentified_technical_inputs": "The CJ does not identify or attach a distinct project cost estimate, alternatives analysis, engineering study, design package, POR, validation study, or model for the B&F FY2027 appropriation decision in this physical-page range.", "not_an_absence_claim": "This is a statement about the read CJ range only; it does not establish that no such records exist elsewhere." }, "formation_findings_and_limits": [ "The only substantive rationale disclosed in this B&F range is accounting/status presentation. It supplies no formal ranked project evaluation or model explaining why the FY2027 new appropriation is zero.", "Future-looking phrases such as expected award, planned completion, and anticipated construction remain agency expectations as of the table's December 2025 status cutoff.", "The source cannot establish whether later appropriations action adopted the request, or whether proposed closures occurred.", "This batch did not independently verify the agency's reported past completions, awards, obligations, or project-status statements." ], "next_work_queue": [ "If formulation tracing is needed, obtain individual published PORs, cost estimates, alternatives analyses, and project/award records for a material B&F project; none was identified with a stable source route in this CJ range.", "Reconcile the B&F request against appropriations-law action separately; this CJ establishes a request/estimate, not FY2027 enactment.", "Read any subsequently chosen USDA chapter through its own official access route; Chapter 20 is now fully covered across distinct human and agent receipts." ] }