workbench: Research Packages/US Inbound Investment and Industrial Capex Funding Map 2025-2026/FUNDS_DRAWN_AND_RISK_HOLDER_MATRIX.md
Canonical source SHA-256: 9204fdb906170a1ccd39f82de9776938b6a2c9f43726c7f12e553914bb819738
Served copy SHA-256: 9204fdb906170a1ccd39f82de9776938b6a2c9f43726c7f12e553914bb819738
Owner evidence cutoffs: {"us-inbound-investment-industrial-capex": "2026-07-31", "ai-infrastructure-capital-stack-risk-transfer": "2026-08-10", "industrial-project-finance-digital-rails": "2026-07-31"}
These are package-level cutoffs, not a claim that this source was rechecked on those dates. Use its own publication and capture dates.
Owners: us-inbound-investment-industrial-capex, ai-infrastructure-capital-stack-risk-transfer, industrial-project-finance-digital-rails
Section 1 of 1
# Funds Drawn and Risk-Holder Matrix — Six Deep Dives
For each project, preserve these three non-additive measures:
The holder of an economic claim can change through syndication, refinancing, restructuring, a guarantee, or sale of the asset. A named arranger is not necessarily the final risk holder.
| Project | Legal borrower and facility | Commitment | Actual advance / funded signal | Restricted use and spend evidence | Presently identified risk holder / residual claimant | Crucial gap |
|---|---|---|---|---|---|---|
| CP2 LNG Phase 1 | CP2 LNG LLC; guarantors CP2 Procurement and CP Express. $11.3B construction term loan + $850M working-capital/LC; CP2 Holdings separately has $2.8B equity bridge + $191M interest reserve. | $15.1B disclosed Phase-1 financial-close stack. | At 2025 year-end, $9.39B construction and $740M WC/LC capacity available, implying roughly $1.91B and $110M used/outstanding/LC—but not a separately stated cash-draw series. | Facility use: finance/develop/construct/place in service. $9.9B total CP2 Phases 1–2 project cost paid at year-end is not attributable solely to Phase 1/new facilities. | Project assets/guarantors and secured lenders; 10-K says project debt has no parent recourse/guarantee. | Facility-exhibit extraction for originating lender list; Phase-1-only draw and spend. |
| Rio Grande LNG Train 5 | Rio Grande LNG Train 5, LLC. $3.59B senior-secured non-recourse term loan + $500M senior-secured private-placement notes; equity through Train 5 JVCo. | $4.09B project debt; $2.58B committed equity. | Close established, but no public aggregate cash-draw balance. Notes fund in tranches December 2025–October 2026. | Project construction and collateral/security use; full NTP, but no numeric spend. | Secured lenders/noteholders, then JV equity; sponsor has upstream borrowing to fund its contribution. | Draw balance, lender/noteholder schedule and construction spend. |
| Thacker Pass Phase 1 | Lithium Nevada LLC, owned by Lithium Nevada Ventures LLC LAC–GM JV. DOE ATVM facility; Citibank collateral/depositary accounts. | Expected maximum $2.23B after amendment ($1.97B principal). | $867M: $435M 2025-10-20 + $432M 2026-02-24. | Restricted accounts; advances typically quarterly, spent monthly. $611.6M 2025 capitalized construction/project cost; later Q1 record reports $1.277B cumulative capitalized project costs at 2026-03-31. | DOE secured lender; LAC completion/debt guarantor; GM/LAC residual equity; GM offtake supports revenue. All LN assets/equity and tax-credit-monetization proceeds are secured. | Advance-to-vendor/use-of-proceeds schedule. |
| BlueOval SK | Original borrower BOSK; successor structure after May 2026: Ford Energy Battery holds Kentucky plants/assumed note for one advanced KY plant; SK Battery America controls BOSK/Tennessee. | Up to $9.63304B DOE/FFB multi-draw facility. | $7.83554B actual BOSK advances reported before restructure. | Construction use for KY/TN battery plants. KY Facility 1 certificate of occupancy and Facility 2 building complete; advance is not spend. | Post-restructure: Ford Energy Battery assumed $3.80504B DOE note associated with a Kentucky plant; SKBA/BOSK Tennessee exposure requires successor schedule. Ford's former $6.6B support obligation ended. | Allocation of remaining advances/notes and post-restructure spend/operations. |
| TSMC Arizona | TSMC Arizona Corporation, wholly owned by TSMC; Fab 21. CHIPS direct-funding agreement and government-loan agreements; existing Arizona notes. | Up to $6.6B direct funding + up to $5B government loans; $4.5B 2021 parent-guaranteed notes; up to $20B parent capital increase authorized. | No public direct-funding disbursement, government-loan draw, or paid-in parent-capital amount identified. | Award/loan funds subject to milestones and conditions. Fab 1 HVM; Fabs 2/3 construction milestones demonstrate build but not cost/draw. | Parent gives Commerce unconditional guarantee; parent guarantees Arizona notes; award/loan availability conditional. | Paid-in parent equity, award disbursement, loan draw and fab-specific spend. |
| Abilene DC 1 | Abilene DC 1 LLC, wholly owned by Longhorn JV (92.3% BOREC/Blue Owl; 7.7% Crusoe). | $2.288B construction loan; $926.847M equity contributions as of 2025-12-31. | Construction-loan proceeds are restricted for development; lender and numeric draw not public. | Two buildings/eight halls delivered; Oracle rent began March/July 2025; power station under development; no numeric spend. | Construction lender, then BOREC/Crusoe equity. Oracle is 100% tenant and reimburses specified construction costs under build-to-suit lease. | Lender, actual loan balance/draw and project spend. |
Only Thacker Pass has a clean public chain from facility to stated advances to a numeric capitalized-cost figure. BlueOval has a large advance figure, but a post-advance ownership/borrower restructuring. CP2 has an availability-based funding signal and combined-phases spend. The other three demonstrate financing architecture or construction, not published draw-to-spend cash paths.
This is why the eventual numerator must retain separate columns for committed, advanced, spent and operating—not collapse them into a single "investment" amount.