.json · 1 sections · 9442 characters
workbench: _Working/federal-budget-2026-2027/goal/terra_process/doe/batch13/DOE_FY2027_CROSSCUTS_NR_DNN_FULL_CJ_REFERENCE_CENSUS.json
Canonical source SHA-256: 37c3b727f9ef3579a1969c55c1aaf129557be8fe692502e3cc59eefa5b1849f6
Served copy SHA-256: 37c3b727f9ef3579a1969c55c1aaf129557be8fe692502e3cc59eefa5b1849f6
Owner evidence cutoffs: {"federal-budget-fy2026-fy2027": "2026-09-11T19:55:13-04:00"}
These are package-level cutoffs, not a claim that this source was rechecked on those dates. Use its own publication and capture dates.
Owners: federal-budget-fy2026-fy2027
Section 1 of 1
{ "package":"DOE FY2027 Crosscuts, Naval Reactors, and Defense Nuclear Nonproliferation full-CJ receipt", "created":"2026-09-11", "selection_basis":"Next known-length unread component CJs from batch12's queue: Crosscuts 22 pages, Naval Reactors 41, and Defense Nuclear Nonproliferation 55.", "documents":[ {"source_id":"doe_fy27_crosscuts","title":"Crosscuts FY 2027 Congressional Justification","url":"https://www.energy.gov/documents/doe-fy-2027-volume-2-crosscuts","status":"full PDF read","page_coverage":"All 22 PDF pages, cover plus pages 1-21; official PDF web-text was reviewed in sequential page ranges.","role":"Cross-agency display of program-level FY2025/FY2026/FY2027 funding associated with AI/ML and other crosscut topics; it compiles rather than appropriates a separate account.","claims":[{"locator":"PDF p2-p4","claim":"AI/ML crosscut total shown as $1.969042b FY2027 request versus $888.896m FY2026 enacted, including AIQ $1.2b; tables aggregate figures from listed offices.","disposition":"crosscut request display, not a separate enacted appropriation or proof that all underlying component requests are funded."},{"locator":"PDF p4","claim":"States FY2027 is DOE's first budget cycle to operationalize the Genesis Mission presidential directive and describes related investments as initial targeted commitment.","disposition":"agency planning statement; underlying EO, appropriations act, and implementation evidence were not read here."},{"locator":"PDF p6","claim":"ART states a continuing PROMETHEUS project aims for at least 2x schedule acceleration and over 50% operating-cost reductions.","disposition":"program goal in CJ, not demonstrated achieved outcome or independent evaluation."}],"reference_census":[{"title":"Genesis Mission Executive Order","issuer":"President","date":"November 2026 as stated by CJ","locator":"PDF p4","role":"stated direction for American Science and Security Platform","status":"EO number/URL absent; not separately read."},{"title":"Working Families Tax Cut Act","issuer":"Congress","locator":"PDF p4","role":"stated FY2026 source of DOE cloud-computing/self-improving-model funding","status":"citation/URL absent; not separately read."},{"title":"DOE AI Strategy and Policy","issuer":"DOE","locator":"PDF p4","role":"stated AI-governance framework","status":"edition/URL absent; not separately read."},{"title":"Fusion Energy Sciences Roadmap","issuer":"DOE Office of Science","locator":"PDF p8","role":"stated FES AI/ML alignment input","status":"not separately read."},{"title":"Component-CJ program sources and data","issuer":"various DOE offices","locator":"throughout","role":"crosscut’s underlying funding and program claims","status":"underlying full receipts are separately tracked; crosscut itself provides no bibliography."}],"limits":"Crosscuts repeats/summarizes component programs. It is not proof of program execution, and it does not establish cross-component table equivalence beyond the figures printed in this document."}, {"source_id":"doe_fy27_naval_reactors","title":"Naval Reactors FY 2027 Congressional Justification","url":"https://www.energy.gov/documents/doe-fy-2027-volume-1-nr","status":"full PDF read","page_coverage":"All 41 PDF pages, cover plus pages 1-40; official PDF web-text was reviewed in sequential page ranges.","role":"NNSA request for naval nuclear propulsion program direction, operations, technology, and construction.","budget_basis":{"fy2025_enacted_millions":1946.0,"fy2026_enacted_millions":2134.0,"fy2027_request_millions":2393.692,"change_millions":259.692},"claims":[{"locator":"PDF p2","claim":"Proposes $2.393692b, including $71.841m available through FY2028 for program direction.","disposition":"proposed appropriation, not enacted funding."},{"locator":"PDF p9","claim":"NRT material testing/examination is described as providing operational-performance data used in design/life-extension decisions.","disposition":"agency description; underlying data/reports are not published or reviewed here."},{"locator":"PDF p24-p25,p31,p37","claim":"Construction tables present current/previous estimates, schedule and performance thresholds for Naval Examination Acquisition and spent-fuel-handling recapitalization projects; one table says FY2026 enacted funding was below baseline-revision assumption.","disposition":"CJ project estimates and stated baselines, not independent validation or actual completion."}],"reference_census":[{"title":"Department of Energy Organization Act","citation":"42 U.S.C. 7101 et seq.","issuer":"Congress","locator":"PDF p2","role":"proposed-appropriation authority","status":"authority only; not separately read."},{"title":"NEPA documentation","issuer":"DOE/NNSA","locator":"PDF p24-p25 project cost table","role":"listed as project other-project-cost category","status":"no specific document/case cited; not read."},{"title":"Performance Baseline Revision 4 and project funding profile","issuer":"NNSA Naval Reactors","locator":"PDF p36 footnote 2","role":"stated construction funding comparator","status":"underlying baseline not linked or read."},{"title":"Naval reactor materials testing/examination data","issuer":"NNSA/INL/NRF","locator":"PDF p9","role":"stated design input","status":"no discrete report cited; not read."}],"limits":"NNSA operational, safety, and project-performance assertions are agency claims. The CJ has no public bibliography or independent audit/evaluation citation for these claims."}, {"source_id":"doe_fy27_dnn","title":"Defense Nuclear Nonproliferation FY 2027 Congressional Justification","url":"https://www.energy.gov/documents/doe-fy-2027-volume-1-dnn","status":"full PDF read","page_coverage":"All 55 PDF pages, cover plus pages 1-54; official PDF web-text was reviewed in sequential page ranges.","role":"NNSA request for nonproliferation, counterproliferation, counterterrorism, emergency-response, and related R&D programs.","budget_basis":{"fy2025_enacted_millions":2396.0,"fy2026_enacted_millions":2367.0,"fy2027_request_millions":2389.595,"change_millions":22.595},"claims":[{"locator":"PDF p2","claim":"Proposes $2.389595b under DNN appropriation.","disposition":"proposed appropriation, not enacted spending."},{"locator":"PDF p20-p21","claim":"International Nuclear Security says it uses a risk-informed/graded approach, prioritizes highest-consequence materials, and seeks greater partner cost sharing.","disposition":"agency method and plan; risk model, country data, and cost-sharing performance are not provided or independently reviewed."},{"locator":"PDF p30","claim":"DNN R&D request is $819m, up $10.241m, with subprogram changes printed in the table.","disposition":"request comparison only."},{"locator":"PDF p40-p41","claim":"NTNF/NIPC narratives describe readiness, exercises, archive work, and partner preparedness functions.","disposition":"agency program description; no outcome evaluation cited."}],"reference_census":[{"title":"Department of Energy Organization Act","citation":"42 U.S.C. 7101 et seq.","issuer":"Congress","locator":"PDF p2","role":"proposed-appropriation authority","status":"authority only; not separately read."},{"title":"Risk-informed and graded approach / engagement studies","issuer":"NNSA DNN","locator":"PDF p20","role":"stated International Nuclear Security prioritization and technical-exchange input","status":"no named risk model or study supplied; not read."},{"title":"National Nuclear Materials Archive records","issuer":"NNSA","locator":"PDF p40","role":"stated material-attribution input","status":"no discrete public archive/report cited; not read."},{"title":"DNN outyear and site funding tables","issuer":"NNSA","locator":"PDF p9,p30,p49-p54","role":"agency planning/budget data","status":"fully read as CJ tables; underlying execution data not reviewed."}],"limits":"DNN contains sensitive-domain program descriptions but no public bibliography. References above are all identifiable named inputs/authorities; none establishes actual operations, partner contributions, results, or compliance."} ], "updated_exact_39_coverage":{"initial_rows":39,"fully_read_listed_targets_after_batch13":27,"unread_listed_targets_after_batch13":9,"parent_compilations_not_separately_read":3,"parent_equivalence":"unverified; parent compilations remain source rows without any byte-for-byte or substantive-identity claim."}, "remaining_component_queue":["Nuclear Waste Disposal (URL resolved; page count unverified)","NNSA Overview (79 pages)","Weapons Activities (375 pages)","Power Marketing Administrations (119 pages)"], "remaining_summary_queue":["Summary Table by Appropriation (3 pages)","Summary Table by Organization (3 pages)","Statistical Table by Appropriation (18 pages)","Laboratory Tables (131 pages)","State Tables (94 pages)"], "separate_upstream_queue":["Genesis Mission EO, Working Families Tax Cut Act, DOE AI Strategy and Policy, and FES Roadmap","OTC and crosscut underlying outcome records","Naval Reactors project baseline revision, NEPA documents, and performance data","DNN prioritization model, engagement studies, and Archive records"], "limits":["FY2027 figures are requests or proposed language; FY2025/FY2026 comparators are marked enacted where stated.","Full document review does not mean every legal, classified, technical, or data input was available or independently reviewed.","No maintained catalog, package, vault, or app file was edited."] }