Skip to content
Browse the whole research Library · Start page for AI agents ·

VA FY2027 VOLUME4 PHYSICAL 81 120 AUDIT

.json · 1 sections · 11370 characters

Source, owner, and dates

workbench: _Working/federal-budget-2026-2027/goal/terra_human/va/batch29/VA_FY2027_VOLUME4_PHYSICAL_81_120_AUDIT.json

Canonical source SHA-256: 8fddbfcea7a34547ee5bbe9bc194cd49557b77925d959fff5e8cf3ef4e344023

Served copy SHA-256: 8fddbfcea7a34547ee5bbe9bc194cd49557b77925d959fff5e8cf3ef4e344023

Owner evidence cutoffs: {"federal-budget-fy2026-fy2027": "2026-09-11T19:55:13-04:00"}

These are package-level cutoffs, not a claim that this source was rechecked on those dates. Use its own publication and capture dates.

Owners: federal-budget-fy2026-fy2027

complete text

Opening section

Section 1 of 1

{ "artifact_type":"bounded_full_sequential_CJ_read_receipt", "status":"complete_for_assigned_physical_page_range", "created":"2026-09-11", "source_document":{"identity":"U.S. Department of Veterans Affairs, FY 2027 Budget Submission, Volume 4 of 5: Construction, Long Range Capital Plan and Appendix","official_url":"https://department.va.gov/wp-content/uploads/2026/04/Volume-4.pdf","physical_pdf_page_count_observed_in_official_reader":502,"local_source_path":null,"source_access":"Official PDF reader; no local download/extraction path claimed."}, "page_coverage":{"physical_pdf_pages_read":"81-120 inclusive one-based; official-reader indices80-119","printed_content_covered":"Construction, Major 2-61 through 2-100","sequential_read_method":"All assigned physical pages read in order via official PDF reader. Tables inspected for labels, funding bases, current/forecast distinctions, methods, and named sources; not transcribed cell by cell.","next_unread_physical_page_one_based":121,"next_unread_reader_index":120,"next_unread_printed_page":"2-101","remaining_scope":"physical pp.121-502 / reader indices120-501"}, "claims_and_boundaries":[ {"printed_pages":"2-61 to 2-68","claim":"VA requests $77.6m to renovate WLA Building217 for NCWI-related domiciliary capacity.","status":"FY2027_project_request_and_modelled_alternative_comparison","boundary":"Current operation/100-bed statements are agency status data; stated increase to148 beds, 2028 schedule, homeless counts, and discounted lifecycle comparison are future/estimate/model inputs. The cost-effectiveness template remains unidentified."}, {"printed_pages":"2-69 to 2-74","claim":"VA describes a $63.5m WLA general-infrastructure project, requests $54.2m for FY2027 and shows $9.3m future requirement; it says VA may consider reprogramming for requirements beyond FY2027.","status":"FY2027_request_plus_future_requirement_and_possible_reprogramming","boundary":"Possible reprogramming and future request are not appropriated funds or an approved transfer. The $63.5m discounted comparison and preferred-alternative narrative are agency model/formulation statements."}, {"printed_pages":"2-75 to 2-80","claim":"VA requests $98.1m for an approximately 800-space WLA NCWI parking structure and transportation hub.","status":"FY2027_project_request_and_modelled_alternative_comparison","boundary":"Campus-growth, accessibility, preferred-alternative, FY2027 request, and estimated-cost assertions are prospective/formulation claims. Underlying parking/transport data and lifecycle model have not been read."}, {"printed_pages":"2-81 to 2-96","claim":"VA requests cemetery-development projects for National Cemetery of the Alleghenies ($97.7m), Fort Snelling ($107.5m), Ohio Western Reserve ($144m), and Great Lakes ($99.9m), with capacity/depletion and master-plan rationales.","status":"FY2027_project_requests_with_agency_capacity_forecasts","boundary":"Service-area population, Veteran-death, interment, depletion-date, and 15-plus-year-capacity statements are agency estimates/projections; they do not establish actual future demand. Each project's non-construction crypt cost is separately stated as funded in the Compensation and Pension appropriation."}, {"printed_pages":"2-97 to 2-100","claim":"Volume4 requests $125.281m for Advance Planning and Design Fund activity, $172.889m for Construction and Facilities Management staff, and begins a $35m NCA Land Acquisition Fund request.","status":"FY2027_line_item_requests","boundary":"The tables distinguish FY2025 actual from FY2026 estimates/current estimate and FY2027 request. Planning/design work and staffing request do not demonstrate downstream construction authorization, award, or completion."} ], "formulation_inputs_and_named_upstream_objects":[ {"id":"v4_eo14296_and_scip_repeated","identity":"Executive Order14296 and VA SCIP/Secretary-priority process","type":"executive authority and agency planning priority","printed_CJ_pages":["2-61","2-63","2-65","2-69","2-71","2-75","2-77"],"role_in_CJ":"Frames WLA/NCWI priorities and stated deviations from ordinary SCIP prioritization.","status":"cited_or_described_in_CJ_only","url":null,"limits":"Neither the EO nor source SCIP records/priority decisions were read. Policy designation does not establish enacted funding, execution, or outcome."}, {"id":"v4_wla_market_coordination_cost_model_repeated","identity":"High-level WLA market research; VHA Office of Interagency Health Affairs—Office of VA-DoW Coordination; and unidentified cost-effectiveness analysis template","type":"unidentified market/interagency inputs and lifecycle model","printed_CJ_pages":["2-64","2-65","2-71","2-72","2-77","2-78"],"role_in_CJ":"Supports exclusion of acquisition/joint-facility alternatives and supplies discounted life-cycle alternative-comparison inputs.","status":"described_in_CJ_only_identity_unresolved","url":null,"limits":"No research identity, coordination record, template version, discount rate, horizon, assumptions, data source, or validation is supplied."}, {"id":"v4_wla_pit_and_market_forecasts_repeated","identity":"VISN22 Greater Los Angeles/all-market projections and VA Point in Time homelessness-count estimates","type":"agency data and forecast bundle","printed_CJ_pages":["2-63","2-65","2-72","2-73","2-75"],"role_in_CJ":"Inputs to WLA capacity/need narratives; Building217 gives January2024 national count over32,800 while related tables cite catchment/California/national estimates.","status":"agency_data_and_forecast_in_CJ_only","url":null,"limits":"Underlying data, PIT methodology/vintage/geography, forecast model and uncertainty were not read. Slightly different rounded national figures should not be silently harmonized."}, {"id":"v4_wla_master_plan_and_infrastructure_assumptions","identity":"WLA Master Plan, campus-growth/active-project assumptions, and general-infrastructure needs","type":"agency strategy and administrative planning assumptions","printed_CJ_pages":["2-69","2-70","2-71","2-72","2-75"],"role_in_CJ":"Supports general-infrastructure and parking descriptions, including a potential 6,000-Veteran/270-acre campus framing and 12-14 active-construction-project estimate.","status":"described_in_CJ_only","url":null,"limits":"Master Plan/assumption source not read; figures are planning assertions, not observed capacity or future delivery evidence."}, {"id":"v4_nca_master_plans_capacity_and_depletion_forecasts","identity":"NCA cemetery master plans; 75-mile service-area Veteran population/death estimates; interment/depletion projections; gravesite inventory/capacity assumptions","type":"agency administrative data and forecast bundle","printed_CJ_pages":["2-81","2-82","2-85","2-86","2-89","2-90","2-93","2-94","2-95"],"role_in_CJ":"Rationales and prioritization for four gravesite-development projects, including projected depletion dates and stated 15-plus-year added capacity.","status":"agency_data_and_forecast_in_CJ_only","url":null,"limits":"No master plan, population/death/interment data, capacity/depletion methodology, or forecast validation was read. The cited estimates do not demonstrate future demand or project results."}, {"id":"v4_compensation_pension_crypt_cost_basis","identity":"Compensation and Pension appropriation basis for cemetery-project non-construction crypt costs","type":"budget-accounting input","printed_CJ_pages":["2-81","2-85","2-89","2-93"],"role_in_CJ":"Each cemetery prospectus separately labels crypt non-construction costs as funded under Compensation and Pension rather than the Major Construction project request.","status":"accounting_statement_in_CJ_only","url":null,"limits":"No appropriation language or accounting reconciliation was read; do not combine the separate crypt amounts with the construction request without a source-supported basis."}, {"id":"v4_nca_state_cemetery_grant_alternatives","identity":"VA grant-funded State Veterans cemetery alternative","type":"program/alternative described in CJ","printed_CJ_pages":["2-82","2-86","2-90","2-94"],"role_in_CJ":"One alternative considered for cemetery capacity; CJ discusses state-location/feasibility conditions.","status":"described_in_CJ_only","url":null,"limits":"No state plan, grant application, program authority, feasibility study, or cost analysis was read."}, {"id":"v4_apdf_design_process","identity":"Advance Planning and Design Fund, including schematic design, design development, construction documents, and capital-facility studies","type":"agency planning/design process","printed_CJ_pages":["2-97","2-98"],"role_in_CJ":"Proposed line-item funding for designs/studies supporting future construction requests.","status":"described_in_CJ_only","url":null,"limits":"No individual design/study, project list, output, or completed-design evidence read. FY2027 line item is a request."}, {"id":"v4_cfm_oalc_staffing_and_vol3_crossref","identity":"Office of Acquisition, Logistics and Construction and Office of Construction and Facilities Management; Volume3 Part5 OALC cross-reference","type":"agency management/staffing input and internal CJ cross-reference","printed_CJ_pages":["2-99","2-100"],"role_in_CJ":"Supports $172.889m Major Construction staff request and reimbursement to General Administration.","status":"described_in_CJ_only","url":null,"limits":"Volume3 OALC source, staffing model, staffing positions, workload evidence, and reimbursement reconciliation were not read in this batch."}, {"id":"v4_land_acquisition_fund_market_assumption","identity":"NCA Land Acquisition Fund and agency assumption regarding land-market timing/seller constraints","type":"budget request and operational assumption","printed_CJ_pages":["2-100"],"role_in_CJ":"Begins the $35m FY2027 request rationale for flexible land purchase/security/maintenance ahead of construction funding.","status":"agency_request_and_assumption_in_CJ_only","url":null,"limits":"No parcel list, appraisal, market study, transaction, or authority reconciliation read; this page begins a section that continues beyond assigned scope."} ], "table_measure_handling":{"observed_or_currently_described":["FY2025 Actual columns in APDF/CFM tables","current building/bed/capacity descriptions, subject to underlying-data limits","cemetery current inventory/depletion baselines as agency administrative descriptions"],"forecast_request_or_modelled":["FY2027 project and line-item requests; anticipated/possible reprogramming; future requirements","projected Veteran deaths, interments, depletion dates, capacity and construction schedules","discounted lifecycle/alternative comparisons and preferred-alternative conclusions"],"interpretive_limit":"Cemetery demand/depletion and WLA lifecycle narratives establish VA's stated planning logic, not independently validated future conditions, enacted funding, completed construction, or achieved benefit."}, "remaining_work":["Continue at physical p121 / reader index120 / printed2-101.","Separate upstream work is needed for EO14296, SCIP decision records, WLA master plan, PIT/market data, lifecycle model, NCA master plans/depletion methods, APDF studies, OALC staffing model, and land-acquisition documentation.","Preserve distinct funding accounts and do not treat reprogramming consideration or future request as approved funding."] }