DOE RESOURCE ADEQUACY BASELOAD SOURCE CHAIN

.json · 1 sections · 11296 characters

Source, owner, and dates

workbench: _Working/federal-budget-2026-2027/goal/terra_institutions/strategy_drivers/batch2/DOE_RESOURCE_ADEQUACY_BASELOAD_SOURCE_CHAIN.json

Canonical source SHA-256: f4c22c1dc02f64878c239c46794a0f57c1a673faef5daf831b6671b23880cb44

Served copy SHA-256: f4c22c1dc02f64878c239c46794a0f57c1a673faef5daf831b6671b23880cb44

Owner evidence cutoffs: {"federal-budget-fy2026-fy2027": "2026-09-11T19:55:13-04:00"}

These are package-level cutoffs, not a claim that this source was rechecked on those dates. Use its own publication and capture dates.

Owners: federal-budget-fy2026-fy2027

complete text

Opening section

Section 1 of 1

{ "artifact": "DOE Resource Adequacy Report and FY2027 Baseload Power source-chain audit", "created": "2026-09-12", "question": "Does DOE's July 2025 Resource Adequacy Report determine the proposed $3.5B FY2027 Baseload Power amount, activities, or project selection, or does it supply a broader reliability rationale only?", "document_limit": "Three primary documents, all official DOE objects: the July 2025 report, six-page Baseload Power FY2027 CJ, and FY2027 Budget in Brief.", "documents": [ { "title": "Report on Evaluating U.S. Grid Reliability and Security", "issuer": "U.S. Department of Energy", "date": "July 7, 2025", "url": "https://www.energy.gov/sites/default/files/2025-07/DOE%20Final%20EO%20Report%20%28FINAL%20JULY%207%29.pdf", "pdf_pages": 73, "read_scope": "Targeted substantive read: front matter/Background (PDF 2–7); Executive Summary/methodology/results framework (7–11); selected regional-results material (12–48); Appendix A generation calibration/forecast (49–56); Appendix B transfer-limit ML methodology and validation (57–67); references and EO appendix (68–72). Visual-only figures/tables not transcribed line by line and no whole-report full-read claim is made.", "identity": "The report calls itself the response to EO 14262 section 3(b); DOE's Reliability page calls the same object the Resource Adequacy Report." }, { "title": "Baseload Power FY 2027 Congressional Justification", "issuer": "U.S. Department of Energy", "date": "FY2027 request; DOE public FY2027 document route", "url": "https://www.energy.gov/documents/doe-fy-2027-volume-3-bp", "pdf_pages": 6, "read_scope": "Full six-page official PDF read." }, { "title": "Department of Energy FY 2027 Congressional Justification, Budget in Brief (DOE/CF-0222)", "issuer": "DOE Office of the Chief Financial Officer", "date": "April 2026", "url": "https://www.energy.gov/documents/doe-fy-2027-budget-brief", "pdf_pages": 85, "read_scope": "Targeted read of printed Budget in Brief pp. 2, 5, 51–52 and relevant appropriation notes. Existing workspace receipt records a prior full 85-page review; this batch does not add a separate full-document claim." } ], "demonstrated_chain": [ { "step": 1, "source_and_locator": "EO 14262 as described in report PDF vi / physical 6–7; exact EO text not separately re-read in this three-document batch", "established": "The EO directed DOE to develop a uniform methodology for anticipated reserve margins, identify at-risk regions, and guide reliability interventions. The report represents DOE's response under section 3(b).", "boundary": "The report and its direction establish a methodology/intervention screen, not a congressionally enacted Baseload appropriation." }, { "step": 2, "source_and_locator": "Report physical 8–11 (printed 2–5), 49–56 (Appendix A), 57–67 (Appendix B)", "established": "DOE analyzes 2030 resource adequacy, producing scenario-based regional reliability/capacity information. It relies on an adapted NERC ITCS grid model, 2024 NERC LTRA capacity/additions, EIA 860 and forecast material, historical hourly wind/solar/load/thermal availability over 12 weather years, 50 GW assumed national AI/data-center load by 2030, 51 GW additional non-data-center load, and modeled transfer limits. It uses LOLH and NUSE thresholds and a required-build/perfect-capacity measure in MW.", "boundary": "Those outputs describe capacity adequacy and transfer risk, not a budget, cost curve, program activity allocation, technology selection, grant/loan award list, or a $/MW estimate." }, { "step": 3, "source_and_locator": "Baseload CJ physical 1 / printed 1 footnote 1; Budget in Brief printed 51 footnote 2", "established": "Both FY2027 budget documents explicitly cite the July 7, 2025 report alongside the 104-GW-retirement/209-GW-new-generation/22-GW-firm narrative. This is a demonstrated reliance for DOE's broad reliability-risk rationale.", "boundary": "The citations do not state that the report produced the $3.5B amount or the activity allocations." }, { "step": 4, "source_and_locator": "Baseload CJ physical 2 / printed 2; Budget in Brief printed 51", "established": "The proposal allocates $3.5B: $1.940B Coal, Oil & Gas, and Geothermal; $300M Nuclear; $10M Cybersecurity; $750M Grid and Electric; $500M Hydropower. It says the funding comes from prior-year unobligated IIJA balances and is outside DOE's annual discretionary topline.", "boundary": "Neither budget document identifies a report table, formula, cost estimate, project pipeline, scoring method, or transaction-level IIJA-balance reconciliation that yields these five figures." }, { "step": 5, "source_and_locator": "Baseload CJ physical 2–5 / printed 2–5; Budget in Brief printed 51–52", "established": "DOE proposes about 9 GW preserved and 9–13 GW added; examples include coal/natural-gas/geothermal work, nuclear improvements, reconductoring, cyber component testing, and 12–15 federal hydropower uprates. It names Army Corps of Engineers, Bureau of Reclamation, and TVA as hydropower project-identification partners and says CyTRICS would test components.", "boundary": "The report contains no project list or selection mechanism for those activities. The CJ's 'Undesignated LPI' site table places all $3.5B in one undesignated line. Capacity estimates mix generation, transmission transfer capacity, and project counts and cannot be added as one modeled output." } ], "report_method_and_assumptions": [ { "locator": "physical 8 / printed 2", "item": "Model design", "detail": "Deterministic, hour-by-hour simulation based on NERC ITCS; uses time-correlated generation/outages and historical weather-synchronized data. DOE says it chose deterministic analysis for transparency and detailed historical-system conditions rather than a probabilistic method." }, { "locator": "physical 8–9 / printed 2–3", "item": "Load growth", "detail": "AI/data-center estimates in cited organizations ranged 35–108 GW; DOE chose a 50-GW national midpoint for 2030, then allocated it by S&P state growth ratios. It separately modeled 51 GW non-data-center load using NERC/historical loads/simulated weather years, adjusted by EIA's 2022 forecast and interpolated to 2030." }, { "locator": "physical 10–11 / printed 4–5", "item": "Scenario and adequacy thresholds", "detail": "Plant Closures assumes announced retirements plus NERC Tier 1 additions; No Plant Closures assumes no retirements plus Tier 1 additions; Required Build compares capacity needed to restore the current-system reliability level. Thresholds are no more than 2.4 annual lost-load hours and NUSE below 0.002%; reported industry estimates span 0.0001–0.003%." }, { "locator": "physical 11 / printed 5; physical 49–56 / Appendix A", "item": "Generation data and retirement/build assumptions", "detail": "DOE ran 12 historic weather years. Current system uses 2023 actual generation plus 2024 Tier 1 additions. Plant Closures assumes 104 GW announced retirements, approximately 71 GW coal and 25 GW gas, and assumes all 209 GW of 2024 LTRA Tier 1 additions are built by 2030. Appendix A starts from 2024 ITCS/2023 LTRA capacity and maps 13 NERC assessment areas into 23 ITCS regions using EIA plant data; announced retirements can include public notices/disclosures not formally notified to operators." }, { "locator": "physical 57–60 / Appendix B", "item": "Canadian-transfer treatment", "detail": "Uses a 15-year 2010–2024 load/generation data set and XGBoost to forecast daily transfer limits, chooses a conservative 25th-percentile forecast, reports hold-out validation measures for one Ontario–NYISO interface, and notes future enhancements could add weather, neighboring-region dynamics, and fuel-specific profiles." } ], "analysis_limits_material_to_budget_use": [ "The report's principal output is regional capacity/reliability risk through 2030, with a hypothetical perfect-capacity measure in MW. It does not calculate a dollar appropriation, expected ratepayer savings, project-level cost, benefit-cost ratio, or allocation across coal, gas, geothermal, nuclear, cyber, grid, and hydropower activities.", "The 50-GW AI/data-center assumption is a chosen midpoint from a 35–108-GW cited range; regional allocation follows S&P forecast ratios. The 51-GW non-data-center load projection uses an EIA 2022 forecast and interpolation. These are scenario inputs, not observed 2030 conditions.", "Plant Closures assumes announced retirements and full 2030 construction of Tier 1 additions. 'Announced' can include public notices/disclosures, and Tier 1 is a maturity screen, not a guarantee of completion. No sensitivity result was found that translates an alternative scenario into a Baseload-dollar amount.", "DOE explicitly chose deterministic rather than probabilistic modeling. Appendix B validates transfer forecasting, but the report's accessible material does not provide an independent validation of the aggregate nationwide capacity-adequacy result or of the proposed program's capacity claims.", "Budget in Brief's reconductoring footnote itself calls the cited transmission estimate a quick estimate with simplifying deliverability/congestion assumptions and says a system-specific dispatch-based study would be more accurate." ], "answer": { "demonstrated_reliance": "Yes, but narrow: the FY2027 Baseload CJ and Budget in Brief expressly invoke the July 2025 report for the high-level retirements, inadequate firm replacement, load-growth, and grid-reliability rationale.", "does_report_determine_3_5b": "No demonstrated evidence. The report has no $3.5B figure or $/MW model, and the CJs do not trace the total or five activity allocations to a report calculation.", "does_report_select_projects_or_technologies": "No demonstrated evidence. It is regional/technology-stack adequacy analysis. The CJ's proposed projects, partner process, five activity buckets, and Undesignated LPI presentation are separate DOE budget assertions.", "legal_budget_state": "FY2027 proposal, not enacted appropriation or executed investment. Funding is described as repurposed unobligated IIJA balances, but the cited documents do not provide a transaction-level balance-to-activity reconciliation." }, "next_best_originals": [ "DOE/OMB decision memorandum, passback, or activity-level cost/screening model that maps resource-adequacy findings to $3.5B and the five allocations; preserve as nonpublic/unavailable if none is public.", "IIJA unobligated-balance ledger and legal repurposing/cancellation authority that identify the exact source balances and conditions for Baseload Power.", "Project pipeline, cost estimates, and partner selection records for hydropower, reconductoring, nuclear, geothermal, and coal/gas components; these are distinct from the Resource Adequacy Report." ], "canonical_edits": false }