Skip to content
Browse the whole research Library · Start page for AI agents ·

NSF FY2027 MATERIAL DRIVER AUDIT

.json · 1 sections · 11752 characters

Source, owner, and dates

workbench: _Working/federal-budget-2026-2027/goal/terra_human/material_drivers/batch3_nsf/NSF_FY2027_MATERIAL_DRIVER_AUDIT.json

Canonical source SHA-256: 8b25f45dc59c537c5e39a352311c669216d2014bb33c08bf787df4080a6c9c71

Served copy SHA-256: 8b25f45dc59c537c5e39a352311c669216d2014bb33c08bf787df4080a6c9c71

Owner evidence cutoffs: {"federal-budget-fy2026-fy2027": "2026-09-11T19:55:13-04:00"}

These are package-level cutoffs, not a claim that this source was rechecked on those dates. Use its own publication and capture dates.

Owners: federal-budget-fy2026-fy2027

complete text

Opening section

Section 1 of 1

{ "receipt_id": "terra_material_drivers_batch3_nsf_fy2027", "status": "completed_bounded_material_screen", "created_date": "2026-09-12", "scope": { "question": "Identify the three largest account/program changes explaining NSF's FY2027 discretionary-request reduction, the stated R&D strategy, and the boundary between asserted priority and disclosed dollar calculation.", "original_source_limit": 3, "originals_examined": 1, "not_done": [ "No program-by-program technical bibliography or original-study review was attempted.", "No hearing testimony, congressional action, or enacted FY2027 outcome was reviewed.", "No claim is made that strategy statements disclose the allocation formula for individual account levels." ] }, "source_records": [ { "source_id": "nsf_fy2027_budget_request_to_congress", "title": "National Science Foundation, FY 2027 Budget Request to Congress", "agency": "National Science Foundation", "publication_date": "2026-04-03", "document_date_as_printed": "April 3, 2026", "url": "https://nsf-gov-resources.nsf.gov/files/FY-2027-NSF-Budget-Request-to-Congress.pdf", "local_path": "/tmp/nsf_fy27.pdf", "physical_pages": 194, "coverage": [ { "physical_pages": "1, 7-9", "printed_pages": "cover; Overview 1-3", "purpose": "request date, total, strategy and cited policy inputs" }, { "physical_pages": "23-24", "printed_pages": "Summary Tables 3-4", "purpose": "summary comparators and proposed EDU consolidation note" }, { "physical_pages": "85-87", "printed_pages": "NSF-Wide Investments 31-33", "purpose": "MREFC request, project composition, review and cost-control framework" }, { "physical_pages": "119-121", "printed_pages": "R&RA 3-5", "purpose": "R&RA restated program table and R&D-priority narrative" }, { "physical_pages": "169-171", "printed_pages": "Technical Info 5-7", "purpose": "controlling FY2026-enacted-to-FY2027-request account budgetary-resource table" } ], "coverage_limit": "Targeted passages and tables only; this is not a full read of the 194-page request." } ], "presentation_and_clock": { "stage": "Executive-branch FY2027 Budget Request to Congress", "presentation_date": "2026-04-03", "not_a_congressional_outcome": true, "aggregate_measure": "Two separate controlling measures: (1) total discretionary appropriations; (2) total discretionary budgetary resources including balances and adjustments.", "fy2026_enacted_millions": 8859.76, "fy2027_request_millions": 3963.15, "change_millions": -4896.61, "percent_change": -55.3, "controlling_table": "Technical Info 5-6 (physical PDF 169-170)", "mandatory_separate_clock": { "item": "Antarctic Research Vessel mandatory appropriation", "fy2027_request_millions": 900, "relation": "Shown on Technical Info 7 as a new mandatory MREFC appropriation. It is not an offset to the discretionary-account reduction." }, "appropriation_bridge": { "fy2026_enacted_millions": 8750.0, "fy2027_request_millions": 3963.15, "change_millions": -4786.85, "percent_change": -54.7, "source_locator": "Technical Info 5-6, physical PDF 169-170; NSF Summary Table, Summary Tables 3, physical PDF 23.", "note": "The appropriation bridge is the appropriate account-appropriation comparison." }, "total_discretionary_budgetary_resources": { "fy2026_enacted_millions": 8859.76, "fy2027_request_millions": 3963.15, "change_millions": -4896.61, "percent_change": -55.3, "source_locator": "Technical Info 5-6, physical PDF 169-170.", "note": "This includes $109.76M of FY2026 beginning unobligated balances across the discretionary accounts that are absent from the FY2027 request column." } }, "largest_changes": [ { "rank": 1, "account_or_program": "Research and Related Activities plus legacy STEM Education account, treated as a consolidated comparison", "fy2026_enacted_components_millions": { "R&RA": 7176.5, "STEM Education": 938.25 }, "fy2026_enacted_combined_millions": 8114.75, "fy2027_request_components_millions": { "R&RA_including_consolidated_EDU": 3409.45, "separate_STEM_Education": 0 }, "fy2027_request_combined_millions": 3409.45, "change_millions": -4705.3, "comparator_basis": "FY2026 enacted appropriation table, adjusted only by combining the account that the request proposes to consolidate into R&RA.", "page_locator": "Technical Info 5, physical PDF 169; the R&RA table separately states that FY2027 consolidates EDU within R&RA on R&RA 3, physical PDF 119.", "interpretive_limit": "The $938.25 million separate-EDU reduction is principally a presentation/consolidation effect. The combined-account calculation is used to avoid representing that transfer as a stand-alone elimination. The request does not disclose an allocation formula for the remaining $4.7053 billion combined reduction." }, { "rank": 2, "account_or_program": "Major Research Equipment and Facilities Construction (MREFC), discretionary appropriation", "fy2026_enacted_millions": 251, "fy2027_request_millions": 172.95, "change_millions": -78.05, "percent_change": -31.1, "page_locator": "Technical Info 5, physical PDF 169; MREFC overview, NSF-Wide Investments 31-33, physical PDF 85-87.", "stated_request_composition": "AIR $60.00M, Leadership-Class Computing Facility $81.45M, Mid-scale RI Track 2 $30.00M, and dedicated construction oversight $1.50M. The document separately requests $900.00M mandatory for the Antarctic Research Vessel.", "stated_budget_method_or_control": "Major facilities must meet NSF/NSB review criteria; the request describes the Research Infrastructure Guide's no-cost-overrun policy, contingency, scope-reduction, recipient/directorate risk treatment, periodic cost/schedule/risk reviews, earned-value surveillance, and independent cost estimates of rebaselines.", "interpretive_limit": "Those controls describe project selection and cost/schedule management. They are not a disclosed calculation that derives the $172.95M appropriation level." }, { "rank": 3, "account_or_program": "Office of Inspector General (OIG), discretionary appropriation", "fy2026_enacted_millions": 24.16, "fy2027_request_millions": 18, "change_millions": -6.16, "percent_change": -25.5, "page_locator": "Technical Info 6, physical PDF 170.", "interpretive_limit": "This is the third-largest negative account change after consolidating STEM Education with R&RA. The targeted overview/table review did not identify a specific evidence study or disclosed dollar model for this amount." } ], "reconciliation": { "top_three_appropriation_changes_millions": -4789.51, "difference_from_total_appropriation_change_millions": 2.66, "exact_bridge": "The top three negative changes total -$4,789.51M. The remaining accounts add +$4.70M AOAM and -$2.04M NSB, yielding the exact -$4,786.85M appropriation decline.", "resource_vs_appropriation_difference_millions": -109.76, "resource_bridge": "The total-budgetary-resources reduction (-$4,896.61M) is $109.76M larger than the appropriation reduction because FY2026 carries beginning unobligated balances that do not appear in FY2027. This is a funding-clock difference, not an additional account appropriation cut." }, "stated_strategy_and_evidence": [ { "claim_or_strategy": "NSF says it realigned its portfolio into Innovation, Discovery Science and Engineering, and Research Infrastructure, prioritizing critical high-priority challenges in a constrained fiscal environment.", "source_locator": "Overview 1, physical PDF 7.", "named_upstream_input": "OMB/OSTP FY2027 R&D Priorities Memo, dated September 23, 2025 (URL printed in footnote 1).", "role": "policy/priority framing", "demonstrated_for_dollar_calculation": false, "limit": "The narrative identifies priority themes and describes a portfolio evaluation; it does not expose a calculation translating that memo or evaluation into account-specific reductions." }, { "claim_or_strategy": "Innovation theme emphasizes AI, quantum information science, biotechnology including neuroscience, and advanced materials/manufacturing; AI and QIS are called Frontier Initiatives.", "source_locator": "Overview 2-3, physical PDF 8-9.", "stated_fy2027_crosscut_millions": { "AI": 655.23, "QIS": 231.15, "Biotechnology_including_neuroscience": 248.59, "Advanced_materials_and_manufacturing": 175.85 }, "named_upstream_inputs": [ "Executive Order on Removing Barriers to American Leadership in Artificial Intelligence, January 2025 (printed footnote 2)", "America's AI Action Plan, July 2025 (printed footnote 3)" ], "role": "claimed R&D priority and crosscut reporting", "demonstrated_for_dollar_calculation": false, "limit": "The request reports these crosscuts and frames them as priorities; it does not show that their amounts mathematically determine the account reductions above." }, { "claim_or_strategy": "R&RA is described as supporting early-stage discoveries, economic competitiveness/national security, private-sector-complementary R&D, and a strategically prepared science and engineering workforce.", "source_locator": "R&RA 3, physical PDF 119.", "role": "agency rationale for the $3.40945B R&RA request", "demonstrated_for_dollar_calculation": false, "limit": "This is an asserted program rationale. It is not evidence that a particular external study or model produced the $3.40945B request." } ], "largest_internal_program_changes_on_alternative_comparator": { "basis": "FY2025 Current Plan restated for proposed FY2027 structure, not FY2026 enacted; do not use to calculate the aggregate FY2026-enacted reduction.", "source_locator": "R&RA 3 / Summary Tables 3, physical PDF 119 / 23.", "three_largest_negative_millions": [ { "program": "Mathematical and Physical Sciences", "fy2025_current_plan_millions": 1548.25, "fy2027_request_millions": 515.28, "change_millions": -1032.97 }, { "program": "STEM Education", "fy2025_current_plan_millions": 1197, "fy2027_request_millions": 427.68, "change_millions": -769.32 }, { "program": "Geosciences", "fy2025_current_plan_millions": 1020.61, "fy2027_request_millions": 426.32, "change_millions": -594.29 } ], "limit": "These quantify material R&RA-program changes on the request's restated FY2025-current-plan basis; they should not be mixed with the FY2026-enacted account table." }, "material_evidence_gaps": [ "No disclosed account-level allocation algorithm, scoring weights, or decision record ties the three account changes to the stated priority themes.", "The request presents strategy and project-control frameworks but no independent impact evaluation showing that the requested reductions preserve or improve stated outcomes.", "FY2027 is a request dated April 3, 2026; congressional consideration, hearing evidence, and final appropriations were outside this bounded screen." ] }