.md · 1 sections · 1786 characters
workbench: _Working/federal-budget-2026-2027/goal/terra_institutions/strategy_drivers/batch2/REPORT.md
Canonical source SHA-256: 92eb7b454f72e2807f1c94a4b51be8307f31c54897fc8628d40c69ceea7b559b
Served copy SHA-256: 92eb7b454f72e2807f1c94a4b51be8307f31c54897fc8628d40c69ceea7b559b
Owner evidence cutoffs: {"federal-budget-fy2026-fy2027": "2026-09-11T19:55:13-04:00"}
These are package-level cutoffs, not a claim that this source was rechecked on those dates. Use its own publication and capture dates.
Owners: federal-budget-fy2026-fy2027
Section 1 of 1
# DOE Resource Adequacy Report → FY2027 Baseload Power
The direct source chain is now clear. DOE's July 7, 2025 Report on Evaluating U.S. Grid Reliability and Security was prepared in response to EO 14262 and supplies a resource-adequacy rationale for the FY2027 Baseload proposal. Both the six-page Baseload CJ and the April 2026 Budget in Brief explicitly cite it next to the same 104-GW retirements, 209-GW additions, and 22-GW firm-generation discussion.
It does not establish the proposed $3.5 billion. The report models regional resource adequacy through 2030, using a deterministic hour-by-hour NERC-based framework, scenario assumptions, historical weather, forecast load growth, capacity/retirement inputs, and some transfer-limit forecasting. Its perfect-capacity output is a hypothetical MW adequacy measure. It contains no dollar appropriation, project list, technology allocation, cost curve, benefit-cost analysis, or project-selection rule.
The $3.5 billion appears in the FY2027 request: $1.940B for coal/oil/gas/geothermal, $300M nuclear, $10M cyber, $750M grid/electric, and $500M hydropower. The budget documents describe planned capacity effects and a hydropower partner-selection process, but put the entire request under an undesignated LPI line and do not map the report's outputs to the five amounts. They also say the funds would come from prior-year unobligated IIJA balances, without a transaction-level source-balance reconciliation.
The strongest remaining evidence would be the DOE/OMB decision or cost-screening record that converts resource-adequacy scenarios into those allocations, followed by IIJA balance/authority records and project-specific cost/selection materials. All figures remain proposed FY2027 funding, not enactment or execution.