.json · 1 sections · 9541 characters
workbench: _Working/federal-budget-2026-2027/goal/terra_human/va/batch37/VA_FY2027_VOLUME4_PHYSICAL_401_440_AUDIT.json
Canonical source SHA-256: e8fae59c3aea560b47a64b75d8bf72a506ded773a6d6727b922592dadfb53f7a
Served copy SHA-256: e8fae59c3aea560b47a64b75d8bf72a506ded773a6d6727b922592dadfb53f7a
Owner evidence cutoffs: {"federal-budget-fy2026-fy2027": "2026-09-11T19:55:13-04:00"}
These are package-level cutoffs, not a claim that this source was rechecked on those dates. Use its own publication and capture dates.
Owners: federal-budget-fy2026-fy2027
Section 1 of 1
{ "receipt_id": "terra_human_va_volume4_batch37_physical_401_440", "status": "complete_bounded_sequential_read", "created_date": "2026-09-11", "scope": { "document": "Department of Veterans Affairs, Congressional Budget Submission, FY 2027, Volume IV", "official_url": "https://department.va.gov/wp-content/uploads/2026/04/Volume-4.pdf", "local_source_path": "/tmp/va_fy27_volume4.pdf", "local_extraction_path": "/tmp/va_v4_batch37_p401_440.txt", "access_method": "Local PDF directly extracted with bundled pypdf; printed labels checked against headings.", "physical_pages_one_based": "401-440 inclusive", "pdf_reader_indices_zero_based": "400-439 inclusive", "printed_pages": "7.1-39 through 7.1-78", "sequential_read": true, "blank_pages_in_range": [], "next_unread": "physical 441; PDF-reader index 440; printed 7.1-79 (next EUL project appendix entry)." }, "coverage": { "printed_7_1_39_to_7_1_64": "Completed 26 Direct Service to Veterans / Supportive Housing EUL appendix entries, Los Angeles Building 205 through Walla Walla.", "printed_7_1_65_to_7_1_68": "Completed four Direct Service to Veterans / Senior Services appendix entries, Batavia III through Viera.", "printed_7_1_69_to_7_1_71": "Completed three Direct Service to Veterans / Special Services entries, Butler I through Vancouver II.", "printed_7_1_72_to_7_1_78": "Completed seven Improved VA Operations entries, Chicago II through Houston." }, "claims_and_boundaries": [ { "id": "va_v4_b37_c1", "locator": "printed 7.1-39 to 7.1-78", "claim": "The range contains 40 individual EUL appendix entries with project descriptions, terms, and cumulative/FY 2025/FY 2024 methodology-derived consideration tables.", "status_clock": "agency report appendix, mixing historical description and modelled accounting outputs", "limit": "Each entry is an agency report record, not an independently reviewed lease, evaluation, survey, or outcome study." }, { "id": "va_v4_b37_c2", "locator": "printed 7.1-48", "claim": "Minneapolis II cites a 2001 statewide survey as its stated local-need context.", "status_clock": "historical cited survey claim", "limit": "The survey has no title, sponsor, sampling method, or URL in this entry and was not located or read." }, { "id": "va_v4_b37_c3", "locator": "printed 7.1-53 to 7.1-54", "claim": "Roseburg I and Roseburg II state that the FY 2025 Consideration Report used the previous three fiscal years' average occupancy because current data was unavailable in time for submission.", "status_clock": "FY 2025 model-input substitution", "limit": "These FY 2025 values are not contemporaneous occupancy observations." }, { "id": "va_v4_b37_c4", "locator": "printed 7.1-57 and 7.1-71", "claim": "Sepulveda II says a 2014 report understated selected figures and was corrected; Vancouver II says its FY 2025 parking-savings calculation used the FY 2024 free-parking-space input because data was unavailable in time.", "status_clock": "historical correction and FY 2025 substituted model input", "limit": "Neither correction nor input is independently verified in this receipt." }, { "id": "va_v4_b37_c5", "locator": "printed 7.1-72 to 7.1-73", "claim": "The two energy-center entries illustrate that modelled energy savings can be negative or positive depending on benchmark/rate treatment; Chicago II shows cumulative negative energy savings while North Chicago I reports positive values.", "status_clock": "methodology-derived accounting result", "limit": "These table values do not establish independently measured net energy or climate effects." } ], "upstream_source_census": [ { "id": "v4_b37_appendix_supportive_housing_entries", "identity": "26 EUL supportive-housing entries: Los Angeles Building 205 (7.1-39); Los Angeles Building 207 (7.1-40); Los Angeles Building 208 (7.1-41); Los Angeles Building 402 (7.1-42); Los Angeles Building 404 (7.1-43); Los Angeles MacArthur Field Phase I (7.1-44); Lyons (7.1-45); Menlo Park (7.1-46); Milwaukee II (7.1-47); Minneapolis II (7.1-48); Minneapolis IV (7.1-49); Newington I (7.1-50); Northampton (7.1-51); Perry Point (7.1-52); Roseburg I (7.1-53); Roseburg II (7.1-54); Salt Lake City III (7.1-55); Sepulveda I (7.1-56); Sepulveda II (7.1-57); St. Cloud II (7.1-58); St. Cloud III (7.1-59); Togus (7.1-60); Tuscaloosa II (7.1-61); Vancouver III (7.1-62); Vancouver I (7.1-63); Walla Walla (7.1-64)", "cj_locator": "printed 7.1-39 to 7.1-64", "type": "agency EUL report appendix entries", "role": "Project narrative, contract-summary, and methodology-derived accounting display.", "status": "all_26_entries_read_in_CJ_only", "exact_url": null, "limits": "Project labels are not upstream studies. All reported benefits/outcomes inherit the EUL consideration methodology read in batch36." }, { "id": "v4_b37_appendix_senior_services_entries", "identity": "Four EUL Senior Services entries: Batavia III (7.1-65); Danville I (7.1-66); Hines II (7.1-67); Viera (7.1-68)", "cj_locator": "printed 7.1-65 to 7.1-68", "type": "agency EUL report appendix entries", "role": "Project narrative, terms, and methodology-derived accounting display.", "status": "all_4_entries_read_in_CJ_only", "exact_url": null, "limits": "Need statements and service descriptions are project narratives, not evaluated causal results." }, { "id": "v4_b37_appendix_special_services_entries", "identity": "Three EUL Special Services entries: Butler I mental-health facility (7.1-69); Tuscaloosa I hospice (7.1-70); Vancouver II crisis triage center (7.1-71)", "cj_locator": "printed 7.1-69 to 7.1-71", "type": "agency EUL report appendix entries", "role": "Project narrative, terms, and methodology-derived accounting display.", "status": "all_3_entries_read_in_CJ_only", "exact_url": null, "limits": "The Vancouver II redesign-process reference is not separately identified or read; reported project values are not a clinical evaluation." }, { "id": "v4_b37_appendix_improved_operations_entries", "identity": "Seven Improved VA Operations entries: Chicago II energy center (7.1-72); North Chicago I energy center (7.1-73); Albany regional offices/parking (7.1-74); Atlanta regional-office co-location (7.1-75); Chicago I regional office/parking (7.1-76); Columbia co-location/mixed use (7.1-77); Houston mixed use (7.1-78)", "cj_locator": "printed 7.1-72 to 7.1-78", "type": "agency EUL report appendix entries", "role": "Project narrative, contract-summary, and methodology-derived accounting display.", "status": "all_7_entries_read_in_CJ_only", "exact_url": null, "limits": "Energy/parking/rental values are accounting outcomes under VA's methodology, not independently verified savings studies." }, { "id": "v4_b37_minneapolis_2001_statewide_survey", "identity": "2001 statewide survey cited in Minneapolis II", "cj_locator": "printed 7.1-48", "type": "unnamed survey", "role": "Stated local homelessness/mental-health/substance-dependence need context.", "status": "identity_insufficient_in_CJ_not_located", "exact_url": null, "limits": "Only year and aggregate claims appear; design, sponsor, population, denominator, and results source remain unknown." }, { "id": "v4_b37_single_day_survey_claims", "identity": "Roseburg I campus single-day survey; Vancouver I campus single-day survey", "cj_locator": "printed 7.1-53 and 7.1-63", "type": "unnamed internal survey claims", "role": "Stated local housing-need context.", "status": "identity_insufficient_in_CJ_not_located", "exact_url": null, "limits": "Single-day hypothetical-discharge percentages are not annual prevalence studies; survey method, date, and denominator are absent." }, { "id": "v4_b37_input_substitution_and_correction_notes", "identity": "Roseburg I and II occupancy-average notes; Sepulveda II historical correction note; Vancouver II FY 2024 parking-space input note", "cj_locator": "printed 7.1-53, 7.1-54, 7.1-57, and 7.1-71", "type": "agency data-quality/method notes", "role": "Qualifies selected report values and model inputs.", "status": "read_in_CJ_only", "exact_url": null, "limits": "No raw occupancy, parking, or corrected historical data were provided." } ], "unresolved_or_remaining": [ "Continue at physical 441 / printed 7.1-79; the EUL appendix remains unfinished.", "The unnamed 2001 statewide survey, Roseburg/Vancouver single-day surveys, Vancouver II community redesign process, and project agreements remain unexpanded.", "External validation of EUL cost-avoidance, energy, clinical, homelessness, occupancy, and enhanced-service claims remains outstanding.", "No EUL appendix table alone is treated as an independent study, original-source verification, causal evaluation, or appropriated funding evidence." ], "quality_checks": { "physical_and_printed_labels_directly_checked": true, "sequential_full_text_and_tables_read": true, "external_originals_read_in_this_batch": false, "canonical_or_shared_files_edited": false } }