Skip to content
Browse the whole research Library · Start page for AI agents ·

batch4 — FY2027 C-1: physical PDF pages 225–299

.md · 1 sections · 1826 characters

Source, owner, and dates

workbench: _Working/federal-budget-2026-2027/goal/terra_institutions/defense/c1/batch4/REPORT.md

Canonical source SHA-256: 4dd96765d309a5004d3522d32a616e61167266027c2c74e869e70a68b9451f1d

Served copy SHA-256: 4dd96765d309a5004d3522d32a616e61167266027c2c74e869e70a68b9451f1d

Owner evidence cutoffs: {"federal-budget-fy2026-fy2027": "2026-09-11T19:55:13-04:00"}

These are package-level cutoffs, not a claim that this source was rechecked on those dates. Use its own publication and capture dates.

Owners: federal-budget-fy2026-fy2027

complete text

FY2027 C-1: physical PDF pages 225–299

Section 1 of 1

# FY2027 C-1: physical PDF pages 225–299

This staged receipt fully reads one-based physical PDF pp. 225–299 of the 450-page official FY2027 Military Construction and Family Housing C-1 (pypdf indices 224–298). Pages 300–450 remain unread.

The range completes the FY2027 material headed Total Obligation Authority as Requested: domestic, overseas, unspecified-location, and family-housing tables. It is a request-side accounting presentation. The inside-US total is $31.600 billion authorization, $16.554 billion authorization for appropriations, and $16.466 billion each for the appropriation and TOA columns; overseas is $4.913 billion / $4.392 billion / $4.392 billion. Each measure is retained separately. A striking example is the Puget Sound Multi-Mission Dry Dock: $14.759 billion authorization but $245 million in each of the other displayed columns; this table does not provide a cost methodology or performance result.

Pages 256–290 recast FY2025 facility-type and project tables, and pp. 291–299 begin FY2026 facility-type tables. These are historical accounting presentations. The document itself uses slightly different headers (some summary pages say simply “For 2025/2026,” while later FY2025 tables say “as Enacted”), so this receipt does not extend an enactment characterization beyond the printed headers.

No separately named study, strategy, model, estimate, statute, audit, or decision record appears in this scope. Project and program labels—including PDI, CTC, GBSD, ERCIP, NATO, BRAC, DPRI, and “Mawar Supplemental-Congressional”—are recorded as table labels, not evidence sources. Exact locators and the upstream queue are in DEFENSE_FY2027_C1_P225_P299_RECEIPT.json.