.json · 1 sections · 5370 characters
workbench: _Working/federal-budget-2026-2027/goal/terra_institutions/defense/p1/batch2/DEFENSE_FY2027_P1_PHYSICAL_076_150_RECEIPT.json
Canonical source SHA-256: ff0ccc61842f8043407aee5a8e84041387ce22c0fbbf62647d630c1eae5c84d9
Served copy SHA-256: ff0ccc61842f8043407aee5a8e84041387ce22c0fbbf62647d630c1eae5c84d9
Owner evidence cutoffs: {"federal-budget-fy2026-fy2027": "2026-09-11T19:55:13-04:00"}
These are package-level cutoffs, not a claim that this source was rechecked on those dates. Use its own publication and capture dates.
Owners: federal-budget-fy2026-fy2027
Section 1 of 1
{ "receipt_type": "bounded_document_read_and_named-input_census", "created_date": "2026-09-11", "document": { "title": "Procurement Programs (P-1), Department of War Budget, Fiscal Year 2027", "publisher": "Office of the Under Secretary of War (Comptroller)", "document_date": "April 2026", "official_url": "https://comptroller.war.gov/Portals/45/Documents/defbudget/FY2027/FY2027_p1.pdf", "local_snapshot": "/private/tmp/fy2027_p1.pdf", "local_text_extract": "/private/tmp/fy2027_p1_p76_150.txt", "physical_pdf_pages": 335 }, "read_scope": { "status": "full_sequential_read_for_bounded_range", "physical_pages_read_one_based": "76-150 inclusive", "printed_exhibit_pages_observed": "71-145", "prior_bounded_read": "physical pp. 1-75 (batch1)", "combined_coverage_after_this_batch": "physical pp. 1-150 inclusive", "unread_physical_pages_one_based": "151-335", "method": "Text extracted from every physical page in the bounded range and reviewed sequentially, including tables." }, "section_coverage": [ {"physical_pages": "76-87", "content": "2035A Other Procurement, Army detail completion (lines 87-126 and account total)"}, {"physical_pages": "88-91", "content": "0390D Chemical Agents and Munitions Destruction, Defense: activity summary and detail"}, {"physical_pages": "92-93", "content": "Department of the Navy appropriation summary"}, {"physical_pages": "94-111", "content": "1506N Aircraft Procurement, Navy: activity summary and detail through account total"}, {"physical_pages": "112-127", "content": "1507N Weapons Procurement, Navy: activity summary and detail through account total"}, {"physical_pages": "128-135", "content": "1508N Procurement of Ammunition, Navy and Marine Corps: activity summary and detail through account total"}, {"physical_pages": "136-150", "content": "1611N Shipbuilding and Conversion, Navy: activity summary and detail through the opening of auxiliaries/craft/prior-year-program costs"} ], "accounting_and_status_basis": { "measure": "Total Obligational Authority; all tables state dollars in thousands.", "comparison_columns": ["FY2025 Actuals", "FY2026 Discretionary Enacted", "FY2026 P.L. 119-21 Spend Plan", "FY2026 Total", "FY2027 Discretionary Request", "FY2027 Mandatory Request", "FY2027 Total"], "status_boundary": "The FY2027 entries are requested TOA, including separately printed mandatory requests. FY2026 discretionary enacted and P.L. 119-21 spend-plan columns are distinct historical/current comparison inputs, not interchangeable with the FY2027 request.", "selected_table_totals_thousands": { "chemical_agents_and_munitions_destruction_fy2026_total": 213282, "chemical_agents_and_munitions_destruction_fy2027_total_request": 55972, "navy_fy2026_total": 103353859, "navy_fy2027_discretionary_request": 126006432, "navy_fy2027_mandatory_request": 24017834, "navy_fy2027_total_request": 150024266, "aircraft_procurement_navy_fy2027_total_request": 34400753, "weapons_procurement_navy_fy2027_total_request": 22619315, "procurement_ammunition_navy_marine_corps_fy2027_total_request": 1958597, "shipbuilding_conversion_navy_fy2027_total_request": 65825017 }, "advance_and_subsequent_funding_labels": "The Navy aircraft and shipbuilding detail contains advance-procurement, subsequent-full-funding, completion-prior-year-shipbuild, and forward-year notation. These are accounting labels and timing allocations in this exhibit; no underlying cost-estimate or program-justification document is cited in this tranche." }, "named_upstream_inputs_and_references_in_read_scope": [ { "name": "P.L. 119-21", "role_stated": "A separately labeled FY2026 spend-plan column throughout the account and item tables.", "locator": "physical pp. 76, 78, 80, 82, 84, 86, 88, 90, 92, 94, 96 and repeated through p. 150", "public_url_or_access": "No statutory citation or versioned spend-plan URL is provided in these P-1 pages.", "read_status": "not separately reviewed in this batch", "reliance_classification": "legal/funding comparator label" } ], "source_census_limits": { "new_named_source_objects": "None beyond the P.L. 119-21 comparator already identified in batch1. The preface's Next Generation Resource Management System database is outside this physical range but remains the document-level stated source.", "studies_audits_strategies_models": "No separately titled study, audit, strategy, cost-estimate report, requirements document, data set, or analytic model is cited in physical pp. 76-150. This finding does not extend to unread pages or related service justifications.", "excluded_from_upstream_census": "Ship, aircraft, weapons, munition, facility, industrial-base, program, budget-activity, and line-item labels are exhibit content rather than independent source documents." }, "next_queue": [ "Read physical pp. 151-335 before claiming whole-P-1 coverage.", "Acquire and assess the cited FY2026 P.L. 119-21 spend plan if its allocations are used as independent evidence.", "Use component/program justification documents for causation, cost-estimate methods, requirements, or performance claims rather than infer them from these TOA tables." ] }