workbench: Research Packages/Federal Science Operating System/NSSTS Technology-to-Company Map 2026-08-18/NSSTS_WAVE_3_CLAIM_AUDIT_AND_WATCHBOARD_2026-08-18.md
Canonical source SHA-256: cd8b539f0dad7c414d55a8f3f4deff4960bb4f6d23778b8f8596ccbc76d7ebe2
Served copy SHA-256: cd8b539f0dad7c414d55a8f3f4deff4960bb4f6d23778b8f8596ccbc76d7ebe2
Owner evidence cutoffs: {"nssts-technology-company-map": "2026-08-19"}
These are package-level cutoffs, not a claim that this source was rechecked on those dates. Use its own publication and capture dates.
Owners: nssts-technology-company-map
Section 1 of 1
# NSSTS Wave 3 — Claim Audit and Forward Watchboard
Evidence cutoff: 2026-08-18
Status: active workbench control record
Scope: biotechnology, quantum/PNT, space, hypersonics and advanced sensing
| Unsafe compression | Ruling |
|---|---|
| A synthesis provider says it follows the federal framework, therefore it passed an independent federal benchmark. | Not established. Eligibility posture, self-attestation and independent test remain separate. |
| BioMADE membership proves a funded company project. | False. Only a named selection or instrument raises PATH. |
| A BioMADE technical project proves production. | False. Pilot, repeatability, economics, qualification and offtake remain open. |
| A DBIMP planning award means the factory will be built. | False. Planning, prototype, build, qualification and transition are distinct. |
| A fermentation batch proves cGMP production. | False. Process validation, release testing, DMF/regulator and customer acceptance control. |
| A commercial ingredient made abroad proves accepted domestic federal supply. | False. Domestic tech transfer and qualified U.S. lots remain separate. |
| QBI Stage B is a passed quantum benchmark. | False. It is risk-reduction evaluation. |
| Final US2QC participation means utility-scale quantum computing was validated. | False. No public final validation result was located. |
| A quantum CHIPS letter of intent is a final award. | False. Recipient entity, site, definitive agreement and qualified output remain open. |
| A quantum payload launch proves performance. | False. Vector/Honeywell hardware flew, but public quantitative on-orbit acceptance is missing. |
| TQS roster status means a company passed field testing. | False. Performer and test-result objects remain separate. |
| A magnetic-navigation flight proves a product was accepted for operations. | False. Quantified accuracy, repetition, procurement and program integration remain gates. |
| A MAVRC Phase 1 agreement is a receiver prototype. | False. Current work is requirements, risk reduction and design. |
| An NSSL vehicle guarantees mission assignment. | False. Blue Origin's Lane 2 position produced no FY2026 Lane 2 mission. |
| A launch means operational constellation service. | False. Orbit raising, checkout, networking and mission acceptance follow. |
| A satellite OTA means an operational missile-tracking constellation. | False. Build, qualification, launch and track acceptance remain open. |
| A lunar landing means full mission success. | False. Orientation, payload survival, data return and duration matter. |
| A new lunar award erases failed mission heritage. | False. Astrobotic and Intuitive Machines retain both clocks. |
| A hypersonic flight proves production readiness. | False. Repeatability, thermal protection, lot acceptance and fielding remain separate. |
| An interceptor design award proves a successful intercept. | False. Hardware, controlled flight, qualification and intercept remain future. |
| Corporate parent identity may replace the named awardee. | False. Exact subsidiaries and instruments remain canonical. |
## Near-term biotechnology gates
| Watch | Current state | Upgrade object | Downgrade |
|---|---|---|---|
| Nucleic-acid screening | framework and procurement rule active | public NIST benchmark and 50-nt transition controls on 2026-10-13 | benchmark failure or attestation lapse |
| DARPA RPM | named performers | independent metric pass and transition customer | close without transition |
| BioMADE Distributed Bioindustrial Production Capability | call closed 2026-07-14 | named prototype team and production-representative pilot | no award or noncompany-only path |
| eXoZymes | selected 100L project | repeated yield/productivity/COGS result and offtake | technical failure or financial distress |
| TEGA | scale-up/regulatory project | consistent cGMP lots and regulator-accepted pathway | potency or impurity failure |
| Capra | active BioMaP project | validated APIs, DMFs and federal procurement | closeout without evidence |
| Manus | expansion awards | commissioned cGMP lines and accepted release lots | yield, impurity or schedule failure |
| Antheia | expanded BioMaP agreement | validated Lafayette thebaine/oripavine and recurring offtake | tech-transfer or control failure |
| DBIMP planning cohort | planning awards | FY2027 build award, site and equipment | no follow-on build |
| Lygos / PPN | agreement/build phase | 2027 commissioning and customer campaigns | opening delay or transfer failure |
| bio-based materials | project batches and samples | ASTM/MIL-SPEC pass and qualified demonstration lots | properties or scale failure |
## Near-term quantum and PNT gates
| Watch | Current state | Upgrade object | Downgrade |
|---|---|---|---|
| Microsoft / PsiQuantum US2QC | final V&V phase | published government validation findings | system or component failure |
| QBI Stage B companies | risk-reduction evaluation | Stage C downselect | elimination or weak evidence |
| quantum CHIPS | letters of intent | definitive agreement, named recipient/site and qualified output plan | LOI expiration or scope change |
| IonQ clock manufacturing | contract awarded | facility opening and qualified units | integration or schedule failure |
| OASIC testbeds | Phase 2 build | routinized government test access and accepted metrics | failed testbed operation |
| Vector/Honeywell X-37B | delivered and launched | quantitative on-orbit result and platform transition | performance shortfall |
| TQS roster | field testing announced | company-specific test result or production task | no transition |
| SandboxAQ / Astra | flight or contract evidence | repeat accuracy and operational user adoption | calibration or accuracy failure |
| MAVRC | Phase 1 design | downselect, prototype and M-code/security certification | design rejection |
| GPS IIIF | incumbent production path | delivered and accepted successor satellite | schedule/interoperability failure |
## Near-term space, hypersonic and sensing gates
| Watch | Current state | Upgrade object | Downgrade |
|---|---|---|---|
| SpaceX NSSL/SDA missions | assigned | successful launch and payload checkout | mission failure or reassignment |
| ULA Vulcan | incumbent with anomaly watch | corrective action and consecutive successful missions | additional exchange or slip |
| Blue Origin | qualified Lane 2 / Lane 1 task path | successful NRO mission and Lane 2 assignment | anomaly or certification delay |
| York Tranche 1 | spacecraft launched | mesh checkout and operational acceptance | systemic link or checkout failure |
| AMDT3 | L3Harris and Sierra build awards | qualified delivery, launch and custody-quality tracks | sensor or supply-chain delay |
| FOO Fighter / Millennium | funded build | fire-control-quality track handoff | performance or launch delay |
| HALO Europa / Capella | demo award | two-spacecraft secure end-to-end demonstration | waveform or integration failure |
| Firefly CLPS | one successful landing | repeat complete delivery | repeatability failure |
| Intuitive Machines | awards with degraded IM-2 | upright complete cargo mission | another curtailed mission |
| Astrobotic | new awards after Peregrine | first successful soft landing | propulsion or landing failure |
| Astroscale U.S. | refueling prototype award | confirmed launch, rendezvous and two transfers | schedule or docking failure |
| LRHW/CPS | test and production lanes | repeat all-up-round test and accepted lots | flight or thermal-protection failure |
| GPI | funded design | hardware, controlled flight and intercept | design failure or cancellation |
| MACH-TB | successful reusable flights | sustained weeks-scale customer cadence | vehicle loss or slow turnaround |
| Raytheon interceptors | production awards | accepted lots and expanded orders | lot rejection or test failure |
| BAE decoys | production modification | delivered and platform-accepted assemblies | reliability/integration failure |