Skip to content
Browse the whole research Library · Start page for AI agents ·

DHS FY2027 TSA USCG FORCE DESIGN MATERIAL STRATEGY

.json · 2 sections · 12418 characters

Source, owner, and dates

workbench: _Working/federal-budget-2026-2027/goal/terra_process/material_drivers/dhs_batch2/DHS_FY2027_TSA_USCG_FORCE_DESIGN_MATERIAL_STRATEGY.json

Canonical source SHA-256: 1d8250939b334a81379509c303c49cc400ac9617342dcd09cce63e4ce0c712df

Served copy SHA-256: 1d8250939b334a81379509c303c49cc400ac9617342dcd09cce63e4ce0c712df

Owner evidence cutoffs: {"federal-budget-fy2026-fy2027": "2026-09-11T19:55:13-04:00"}

These are package-level cutoffs, not a claim that this source was rechecked on those dates. Use its own publication and capture dates.

Owners: federal-budget-fy2026-fy2027

complete text

Opening section

Section 1 of 2

{ "artifact_type": "bounded_material_strategy_receipt", "created_at": "2026-09-12", "scope": { "question": "What do the official FY2027 TSA and Coast Guard justifications, and the primary Force Design 2028 executive report, establish about TSA screening privatization and Coast Guard Force Design 2028?", "original_document_limit": 3, "original_documents_examined": 3, "full_document_claim": false, "read_boundary": "Targeted budget-comparison, program-change, and strategy passages only. No full technical appendix, screening contract, cost-model, legal-history, or Coast Guard acquisition-program review is claimed." }, "documents": [ { "source_id": "dhs_fy27_tsa_cj", "title": "Transportation Security Administration Budget Overview, Fiscal Year 2027 Congressional Justification", "url": "https://www.dhs.gov/sites/default/files/2026-04/26_0403_ocfo_fy27-budget-transportation-security-administration.pdf", "role": "Official annual request and stated proposed screening transfer", "document_pages": 247, "examined_scope": "Targeted PDF pages 1-14 (printed TSA-1 through TSA-14), 47 (TSA O&S-25), 68 (TSA O&S-46), and 72-77 (TSA O&S-51 through TSA O&S-56).", "status": "FY2027 President's Budget proposal; no enactment or execution conclusion", "claims": [ { "locator": "printed TSA-7, Comparison of Budget Authority and Request", "claim": "TSA total authority is $11.566237 billion in FY2026 annualized CR and $11.740450 billion in FY2027, an increase of $174.213 million, while total positions fall 8,385 and FTE fall 9,439. Operations and Support falls $127.187 million, while PC&I rises $246.232 million and vetting-fee authority rises $46.776 million.", "limit": "The total combines appropriated authority and fee programs; it is not a screening-only or enacted-funding measure." }, { "locator": "printed TSA-7 through TSA-8; TSA O&S-25", "claim": "The CJ proposes privatizing all Category III/IV airports by expanding the existing Screening Partnership Program (SPP): $477.341 million in SPP non-pay program change, offset by a $529.311 million reduction in federal Screener Personnel, Compensation, and Benefits. It labels the resulting reduction $51.970 million and 4,528 positions/FTE; the overview rounds this as $477.3 million, $529.3 million, and $52.0 million.", "limit": "The $52.0 million is explicitly an estimated budget reduction in the request. It is not a demonstrated saving, a signed contract amount, or a measure of operational performance." }, { "locator": "TSA O&S-25; TSA O&S-53 through O&S-56", "claim": "TSA says the increase would cover transition costs, contractor procurement, staff training, and technology upgrades, with private partners managing screening operations and technology under continued federal oversight. The SPP account rises from $286.294 million in FY2026 annualized CR to $805.409 million in FY2027 request; its non-pay airport-contract cost driver rises $519.412 million.", "limit": "The CJ gives agency rationale (flexibility, innovation, and claimed private-sector efficiencies) but cites no independent cost study, airport-by-airport transition schedule, contract bids, or evaluation establishing the proposed saving." }, { "locator": "printed TSA-14, Proposed Legislative Language; TSA O&S-51 description", "claim": "The CJ identifies SPP as an existing program that procures screening services from qualified private companies at TSA airports. Its displayed proposed legislative language changes Operations and Support dollar and fiscal-year terms and labels them no substantial change; it does not display new SPP-authorizing language in the reviewed passage.", "limit": "This bounded batch did not read the underlying statute or TSA's existing SPP agreements. It establishes a proposal to expand an existing program, not that Congress has enacted a new blanket privatization authority or that any airport transfer has occurred." } ] }, { "source_id": "dhs_fy27_uscg_cj", "title": "U.S. Coast Guard Budget Overview, Fiscal Year 2027 Congressional Justification", "url": "https://www.dhs.gov/sites/default/files/2026-04/26_0403_ocfo_fy27-budget-united-states-coast-guard.pdf", "role": "Official annual request and stated Force Design 2028 funding links", "document_pages": 242, "examined_scope": "Targeted PDF pages 1-12 (printed USCG-1 through USCG-12) and 57-59 (printed USCG O&S-22 through O&S-24).", "status": "FY2027 President's Budget proposal; no enactment or execution conclusion", "claims": [ { "locator": "printed USCG-8, Comparison of Budget Authority and Request", "claim": "The request is $15.614243 billion in total authority, compared with $13.521957 billion FY2026 annualized CR, an increase of $2.092286 billion. Operations and Support rises $2.110046 billion and 5,768 positions; PC&I falls $212.280 million. Discretionary appropriations rise $2.016541 billion.", "limit": "This is annual requested authority, not the cost of Force Design 2028 as a whole and not enacted FY2027 funding." }, { "locator": "printed USCG-6 through USCG-8", "claim": "The FY2027 request raises Military Personnel from $5.498588 billion to $6.606368 billion, an increase of $1.107780 billion. It includes first-time line items of $50.0 million for Coastal Sentinel and $346.0 million for Shore Infrastructure, and describes force support for cutters, aircraft, Arctic Security Cutters, a Stage Three Offshore Patrol Cutter program, and a long-range UAS.", "limit": "The early summary establishes requested account changes and agency plans, not acquisition outcomes, unit delivery dates, or causal evidence that each item implements a particular strategy recommendation." }, { "locator": "printed USCG O&S-23 through O&S-24", "claim": "Three labeled Force Design 2028 People program changes total $67.920 million and 170 positions: Maximize Readiness, $32.325 million/108 positions; Medical Care, $6.071 million/31 positions; Talent Management, $29.524 million/31 positions. The CJ describes recruiting offices, candidate medical screening, Cape May accessions, additional clinical personnel, a personnel-readiness system, and career/professional-development training.", "limit": "Those are request line items and agency rationales. The CJ supplies no independent evaluation, total lifecycle cost, or result measurement proving that the changes can meet the strategy's FY2028 workforce objective." } ] }, { "source_id": "uscg_force_design_2028_executive_report", "title": "Force Design 2028 Executive Report", "url": "https://media.defense.gov/2025/May/27/2003724531/-1/-1/0/REPORT%20-%20FD28%20EXECUTIVE%20REPORT%20_1166_V14.PDF", "role": "Primary Coast Guard strategy document linked by the official Coast Guard resource library", "date": "May 2025", "document_pages": 16, "examined_scope": "All 16 official PDF pages were read through the official public PDF rendering. Direct ordinary download returned 403, so no local PDF is represented as saved.", "status": "Executive strategic blueprint; it is neither an appropriation nor self-executing statutory authority", "claims": [ { "locator": "printed report page 3 / physical PDF page 5, Establish a Service Secretary", "claim": "The report says the Secretary will work with Congress to pursue legislation establishing a Coast Guard Service Secretary, nominated by the President and Senate confirmed, with described Title 14 and 50 authorities.", "limit": "The report expressly frames this as legislation to pursue. It does not establish that the office or its authorities existed when the FY2027 request was made." }, { "locator": "printed report pages 4-11 / physical PDF pages 6-13, Organization through Contracting and Acquisitions", "claim": "FD2028's stated campaigns are organization, people, technology, and contracting/acquisitions. It calls for program executive offices, a deployable specialized-forces command, strengthened cyber command, moving functions from headquarters, Coastal Sentinel, HR information technology, logistics modernization, rapid prototyping, and acquisition-process reform.", "limit": "These are desired actions and stated operating logic, not quantitative validation or an approved program baseline." }, { "locator": "printed report page 6 / physical PDF page 8, People", "claim": "The report sets a goal to grow the military workforce by at least 15,000 members by the end of FY2028.", "limit": "It does not give a complete cost estimate, annual accession path, model, or evidentiary evaluation demonstrating the goal's feasibility. The FY2027 CJ's 5,295 military-position increase is a distinct annual request metric, not proof of attainment of 15,000 members." }, { "locator": "printed report page 12 / physical PDF page 14, What Lies Ahead", "claim": "The report sets strategy chronology: Commandant execution plan within 30 days, force-posture and operational-concepts campaign within 150 days, and first semiannual update within 180 days.", "limit": "This batch did not retrieve the execution plan or updates, so completion or compliance with those milestones is not established." } ] } ], "proposal_authority_execution_boundary": { "tsa": "The FY2027 SPP expansion is a request. The CJ shows an existing SPP and proposes an expansion, but this batch did not inspect the statutory authority or contracts. No general transfer, cost savings, or execution is treated as established.", "coast_guard": "The FY2027 Coast Guard amounts are requested annual authority. Force Design 2028 is an executive strategy. Its service-secretary element requires legislation according to the report; its other initiatives remain plans unless separately documented as implemented.", "separate_multiyear_funding": "The Coast Guard CJ says the annual request is combined with WFTCA, P.L. 119-21. This receipt does not allocate WFTCA authority to the FY2027 request, and it does not combine that authority with annual-request totals." }, "material_findings": [ "The TSA screening proposal is numerically specific but rests on an agency estimate: $477.341 million more SPP contract funding, $529.311 million less federal screener compensation, and a claimed net $51.970 million reduction. The document does not supply an independent savings analysis.", "The TSA total-authority increase and workforce decline coexist because funding bases and program areas differ; the screening transfer is one part of a broader $8,385-position and 9,439-FTE request reduction.", "Force Design 2028 supplies a strategic rationale and a FY2028 workforce target, while the Coast Guard CJ supplies annual requested line items. The documents do not provide a verified total strategy cost or prove annual changes will deliver the target.", "The most consequential legal boundary found is prospective: the proposed Coast Guard Service Secretary would need legislation. The TSA CJ supports expansion of an existing SPP, not a conclusion that a new authority has already been enacted." ], "local_saved_sources": [ "/tmp/dhs_fy27_tsa.pdf", "/tmp/dhs_fy27_tsa.txt", "/tmp/dhs_fy27_uscg.pdf", "/tmp/dhs_fy27_uscg.txt" ], "access_boundary": {

Section 2 (continued)

Section 2 of 2

"force_design_report": "Read in official public web PDF rendering. Direct ordinary retrieval of the media.defense.gov PDF returned HTTP 403 after the successful official rendering; no bypass was attempted.",
"unread_material": [
  "TSA's statutory SPP authority and individual airport transition determinations/contracts",
  "Underlying TSA cost/savings model or evaluation for Category III/IV transfers",
  "Force Design 2028 execution plan and semiannual updates",
  "Coast Guard acquisition-program baselines and underlying lifecycle-cost documentation"
]

} }