NSSTS Bottleneck Monitoring Runbook

.md · 2 sections · 14742 characters

Source, owner, and dates

workbench: Research Packages/Federal Science Operating System/NSSTS Technology-to-Company Map 2026-08-18/NSSTS_BOTTLENECK_MONITORING_RUNBOOK_2026-08-18.md

Canonical source SHA-256: 2ddcfb65d31ce1fe2d6ec23b6a19e83aff75adc98b6001dbc40f39635e598f86

Served copy SHA-256: 2ddcfb65d31ce1fe2d6ec23b6a19e83aff75adc98b6001dbc40f39635e598f86

Owner evidence cutoffs: {"nssts-technology-company-map": "2026-08-19"}

These are package-level cutoffs, not a claim that this source was rechecked on those dates. Use its own publication and capture dates.

Owners: nssts-technology-company-map

NSSTS Bottleneck Monitoring Runbook

Section 1 of 2

# NSSTS Bottleneck Monitoring Runbook

Evidence cutoff: 2026-08-18
Status: active workbench control record
Registry: NSSTS_BOTTLENECK_MONITORING_REGISTRY_2026-08-18.json
Boundary: standalone research object; not a Federal Group, company promotion, portfolio, investment recommendation, supplier-contract assertion or active automation

## Purpose

This runbook turns the cross-sector dependency registry into a dated manual research queue. It tells a researcher what official surface to revisit, what evidence would raise or lower a bottleneck claim, and when the underlying evidence horizon expires. The registry is inert data: cadence and next_check do not schedule a task, send a notification, browse a source or update a factual state automatically.

## Monitor object model

Field Meaning Control
monitor_id stable monitoring-record identity never substitute for the dependency object
monitor_type shared_rail or propagation_scenario the types carry different claims
object_id exact cross-sector registry object must resolve in the canonical dependency registry
title human-facing watch name descriptive only
sectors exposed NSSTS lanes reach, not probability
priority_tier date/reach-oriented queue class not likelihood or financial materiality
current_state state at the evidence cutoff scenarios explicitly say no trigger is asserted
evidence_grade A–C evidence strength inherited from the dependency object not a probability score
next_check next manual review date a due date does not change state
cadence recommended manual review rhythm no automation is active
owner_surfaces official agencies/programs associated with linked edges does not prove one shared authority
primary_source_ids canonical registry sources to revisit resolve IDs before using new secondary material
trigger event that could activate propagation not asserted merely by appearing here
promotion_test evidence needed to strengthen or activate the claim requires manual adjudication
downgrade_test evidence that reduces, narrows or contradicts the claim preserve the adverse clock
affected_dossier_ids evidence joins to company dossiers not proof of common architecture, ownership or supply
last_checked last factual review date currently 2026-08-18
expiry evidence-horizon date not a prediction that the program ends
status active, watch or blocked active describes a verified rail, not an active failure
inference_boundary explicit non-claim and derivation note must travel with any reuse

## Shared rail versus propagation scenario

## Priority tiers and cadence

Tier Date rule in this build Default cadence Use
immediate next check on or before 2026-10-31 weekly overdue, near acceptance or high-reach gates
near_term 2026-11-01 through 2026-12-31 monthly later-year build, integration and qualification returns
structural after 2026-12-31 quarterly slow facility or institutional change; none are assigned at cutoff
acquisition exception any tier event-driven task, option, definitive agreement, cancellation, award or reassignment

event_driven means check when an official acquisition object appears; it does not create a standing automated search. Rail dates are derived from the earliest edge-overlap scenario when available; otherwise the fallback is 2026-10-31. Each rail records that derivation in its inference_boundary, and edge overlap is a scheduling join rather than proof of shared architecture.

## Immediate queue

Ordered by next_check, then monitor_id.

Next check Monitor Type Title Cadence Status
2026-08-27 monitor-rail-classified-cloud-icam-02 shared_rail Classified cloud, ICAM and authorization plane weekly active
2026-08-27 monitor-rail-doe-compute-data-01 shared_rail DOE and NNSA national-laboratory compute and scientific-data plane weekly active
2026-08-27 monitor-rail-packaging-foundry-04 shared_rail Advanced semiconductor prototyping, packaging and domestic qualification weekly watch
2026-08-27 monitor-rail-power-cooling-03 shared_rail Grid interconnection, transformers and thermal rejection weekly watch
2026-08-27 monitor-rail-user-facilities-08 shared_rail Federated robotics, pilot-plant and user-facility access weekly watch
2026-08-27 monitor-scenario-006 propagation_scenario Argonne frontier-AI center readiness weekly watch
2026-10-18 monitor-rail-ota-transition-13 shared_rail OTA and consortium prototype-to-production transition event_driven watch
2026-10-18 monitor-scenario-016 propagation_scenario Booz Allen cross-program eligibility and capacity event_driven watch
2026-10-31 monitor-rail-benchmark-ivv-09 shared_rail Government benchmark, independent verification and recognized qualification output weekly watch
2026-10-31 monitor-rail-consortium-build-15 shared_rail Institute, project-call and planning-to-build execution event_driven watch
2026-10-31 monitor-rail-field-test-capacity-12 shared_rail Flight, field, range and operational-user evaluation capacity weekly watch
2026-10-31 monitor-rail-launch-checkout-10 shared_rail Assured launch, rideshare integration and on-orbit checkout weekly active
2026-10-31 monitor-rail-manufacturing-qualification-07 shared_rail Digital twin, metrology, NDE and manufacturing qualification weekly watch
2026-10-31 monitor-rail-photonics-optics-05 shared_rail Photonics, germanium and silicon optics, and scalable laser-source chain weekly watch
2026-10-31 monitor-rail-sbir-phase3-14 shared_rail SBIR and STTR Phase II to Phase III or system insertion event_driven watch
2026-10-31 monitor-rail-space-ground-relay-11 shared_rail Space ground segment, relay and terminal interoperability weekly active
2026-10-31 monitor-rail-strategic-materials-06 shared_rail Strategic-material conversion into qualified domestic lots weekly watch
2026-10-31 monitor-scenario-001 propagation_scenario Transformer capacity and field-qualification propagation weekly watch
2026-10-31 monitor-scenario-004 propagation_scenario SpaceX launch and Space Data Network concentration weekly watch
2026-10-31 monitor-scenario-005 propagation_scenario Domestic rare-earth magnet qualification weekly watch
2026-10-31 monitor-scenario-010 propagation_scenario GPS IIIF delivery and on-orbit acceptance weekly watch
2026-10-31 monitor-scenario-011 propagation_scenario Germanium refining and IR-optics qualification weekly watch
2026-10-31 monitor-scenario-012 propagation_scenario HPE compute and DISA cloud integration weekly watch
2026-10-31 monitor-scenario-013 propagation_scenario Ginkgo platform and program qualification weekly watch
2026-10-31 monitor-scenario-014 propagation_scenario Quantum CHIPS letter-of-intent conversion event_driven watch
2026-10-31 monitor-scenario-015 propagation_scenario QTIME nondestructive-evaluation qualification weekly watch
2026-10-31 monitor-scenario-017 propagation_scenario Lockheed parent-family common-cause watch weekly watch
2026-10-31 monitor-scenario-018 propagation_scenario NSSL task, certification and reassignment watch event_driven watch

## Near-term and structural inventory

Next check Tier Monitor Type Title Cadence Status
2026-11-17 near_term monitor-scenario-002 propagation_scenario PWSA ground-network and cryptography integration monthly watch
2026-11-18 near_term monitor-scenario-008 propagation_scenario NASA commercial-relay transition event_driven watch
2026-11-24 near_term monitor-scenario-003 propagation_scenario AWS secure-cloud authorization and service concentration monthly watch
2026-11-24 near_term monitor-scenario-007 propagation_scenario Autonomous-laboratory testbed commissioning monthly watch
2026-12-31 near_term monitor-scenario-009 propagation_scenario Domestic HBM and advanced-packaging ramp monthly watch

No monitor is assigned structural at the 2026-08-18 cutoff. The tier remains available for later slow-moving facility or institutional watches.

## Official return surfaces

Use owner_surfaces to route the check and primary_source_ids to locate the exact canonical evidence. Preferred surfaces are:

Do not treat a press release, company claim or secondary report as the return when the promotion test requires an official instrument, test or acceptance.

## Manual review procedure

  1. Open the monitor by next_check, cadence or a qualifying official event.
  2. Resolve object_id in the cross-sector dependency registry and read its full inference boundary before opening company dossiers.
  3. Resolve every primary_source_id in the canonical Wave 1–4 registries. Verify exact legal entity, site, program, instrument and date.
  4. Separate vehicle from task, ceiling from obligation, award from delivery, installation from acceptance, prototype from operation and family from entity.
  5. Compare the return against trigger, promotion_test and downgrade_test.
  6. Record one of four manual dispositions: no change, upgrade proposed, downgrade proposed or blocked/contradicted proposed.
  7. Any proposed factual change requires a reviewed edit to the canonical registry and corresponding audit. The monitor never promotes itself, a company, a dossier or a dependency edge.

Promotion and downgrade controls

Section 2 of 2

## Promotion and downgrade controls

Promotion requires the exact object stated in promotion_test: for example a named site supplier, accepted lot, definitive agreement, task and obligation, ATO plus migrated workload, Type 1 certification, successful checkout, accepted service or an official common-cause record. Technical fit, repeated company name, consortium membership, vehicle access or adjacency never satisfies the test.

Downgrade when downgrade_test is satisfied, an adverse source appears, the exact entity changes, a vehicle expires or is canceled, a qualification fails, or accepted redundancy disproves the concentration. Preserve canceled, expired and suspended objects—JEDI, Protective DNS, CMMC Phase II and SMART USA—as contrary clocks rather than silently deleting them.

## Expiry and refresh rules

## Dossier joins

affected_dossier_ids contains only the twelve supported dossier identifiers: dossier-aws, dossier-spacex, dossier-booz-allen, dossier-oracle, dossier-palantir, dossier-ge-vernova, dossier-ginkgo, dossier-lockheed, dossier-northrop, dossier-l3harris, dossier-raytheon and dossier-bae-iesi.

The join means a dossier and monitor share one or more evidence edges. It does not prove shared architecture, supplier relationship, contract, facility, workforce, control, cross-default, or operational impact. Empty dossier arrays are valid. A dossier may be opened for context only after the monitor boundary and canonical edge are read.

## Validation checklist

### Return-governance reconciliation — 2026-08-27

The complete 33-record queue is package_context_only. A next_check is a manual package review date, not a Return Ledger entry, canonical watch or authorization for automation. This reconciliation does not advance the package evidence cutoff.