Skip to content
Browse the whole research Library · Start page for AI agents ·

batch1 — VA FY2027 projected capital-expenditure assumptions — batch 1

.md · 1 sections · 2386 characters

Source, owner, and dates

workbench: _Working/federal-budget-2026-2027/goal/terra_institutions/va/expenditure/batch1/REPORT.md

Canonical source SHA-256: 60556d21b10f27a7778e72c12127131f991908288c35727e2ca4c6236ffb21c6

Served copy SHA-256: 60556d21b10f27a7778e72c12127131f991908288c35727e2ca4c6236ffb21c6

Owner evidence cutoffs: {"federal-budget-fy2026-fy2027": "2026-09-11T19:55:13-04:00"}

These are package-level cutoffs, not a claim that this source was rechecked on those dates. Use its own publication and capture dates.

Owners: federal-budget-fy2026-fy2027

complete text

VA FY2027 projected capital-expenditure assumptions — batch 1

Section 1 of 1

# VA FY2027 projected capital-expenditure assumptions — batch 1

Read scope: VA FY2027 Budget Submission, Volume IV, local /tmp/va_fy27_volume4.pdf, physical PDF pp. 294–296 in full, plus p. 293 only for immediate prior-table context. The target is the table printed at 6.2-71, labelled exactly as “Table 2-7: Projected Capital Expenditures.” It is a five-year FY2026 BY–FY2030 BY+4 table in dollars for VA-owned and leased facilities under lifecycle plans. It is neither an enacted-appropriations table nor a total spending measure: no total is printed and its coded lifecycle rows are not demonstrated to be additive.

The footnotes identify two different kinds of input. New requirements (52E) and replacement leases (52F) are based on current operating plans and projected awards, subject to actual execution and congressional/GSA approval. Five categories (53J, 53K, 53L, 55P, and 55Q) are expressly rough-order-of-magnitude estimates because the data are not independently captured. Engineering/technical services (57S) has a funding-scope note, not a projection method.

The remaining stated 2-percent figures are extrapolation assumptions, not independently sourced forecasts in the material read. 52C, 53G, 53H, 54N, and 54O make an explicit two-percent statement, but the table does not supply the component split or the FY2024 actual and FY2026 estimate bases needed to reproduce each aggregate. 53H is arithmetically consistent with two-percent compounding from FY2027 through FY2030, allowing displayed-dollar rounding. The combined 52C, 53G, 54N, and 54O rows do not display uniform 2-percent growth; that discrepancy cannot be explained from the table without inventing unseen NCA/VHA/VBA components.

FY2024 actual is named only in selected footnotes, without a value, dataset, report, or locator. FY2026 is the table's BY comparison column and is named as a VHA estimate basis in selected notes, but no derivation is supplied. Bounded official exact-phrase searches recovered only this FY2027 Volume IV, not a public original for either basis, model version, or validation. This is recorded as an identification gap—not proof that no internal source exists.

The structured receipt retains every displayed row, footnote method, calculation, exclusion, and exact search scope in VA_FY2027_PROJECTED_CAPITAL_EXPENDITURES_ASSUMPTIONS_RECEIPT.json.