.json · 2 sections · 13423 characters
workbench: _Working/federal-budget-2026-2027/goal/terra_human/va/batch34/VA_FY2027_VOLUME4_PHYSICAL_281_320_AUDIT.json
Canonical source SHA-256: 3df1b95421ec450330e9b89781b40388e38510ac9fed27bcde7309e5b79d8be1
Served copy SHA-256: 3df1b95421ec450330e9b89781b40388e38510ac9fed27bcde7309e5b79d8be1
Owner evidence cutoffs: {"federal-budget-fy2026-fy2027": "2026-09-11T19:55:13-04:00"}
These are package-level cutoffs, not a claim that this source was rechecked on those dates. Use its own publication and capture dates.
Owners: federal-budget-fy2026-fy2027
Section 1 of 2
{ "receipt_id": "terra_human_va_volume4_batch34_physical_281_320", "status": "complete_bounded_sequential_read", "created_date": "2026-09-11", "scope": { "document": "Department of Veterans Affairs, Congressional Budget Submission, FY 2027, Volume IV", "official_url": "https://department.va.gov/wp-content/uploads/2026/04/Volume-4.pdf", "local_source_path": "/tmp/va_fy27_volume4.pdf", "local_extraction_path": "/tmp/va_v4_batch34_p281_320.txt", "access_method": "Local PDF directly extracted with bundled pypdf; printed labels checked against page headings.", "physical_pages_one_based": "281-320 inclusive", "pdf_reader_indices_zero_based": "280-319 inclusive", "printed_pages": "6.2-57 through 6.3-22", "sequential_read": true, "blank_pages_in_range": [], "next_unread": "physical 321; PDF-reader index 320; printed 6.3-23 (Table 3-2 continues)." }, "coverage": { "printed_6_2_57_to_6_2_66": "Completed Table 2-8, Potential Future Year Above Threshold Projects; prospective outyear rows, not independent studies or completed projects.", "printed_6_2_67": "Completed Table 2-9, VHA Full Long-Range Plan project count and cost summary, including table notes.", "printed_6_2_68_to_6_2_74": "Completed capital-planning stakeholder, DoD collaboration, real-property target, projected-capital-expenditure, VBA/OIT/OIG/OA-HRA planning sections.", "printed_6_3_1_to_6_3_8": "Completed VHA capital-planning introduction, demand/capacity/condition discussion, noncapital strategies, and Table 3-1 summary.", "printed_6_3_9_to_6_3_22": "Completed the available portion of Table 3-2, Potential Future Year Above Threshold Projects; table continues beyond this batch." }, "claims_and_boundaries": [ { "id": "va_v4_b34_c1", "locator": "printed 6.2-57 to 6.2-67", "claim": "Tables 2-8 and 2-9 present potential/outyear projects and long-range counts/costs. Table 2-9 uses different planning horizons by account and lump-sum estimates for remaining gaps through 2036.", "status_clock": "forecast/planning inventory", "limit": "These tables do not establish funding, authorization, construction, or benefits for each listed row." }, { "id": "va_v4_b34_c2", "locator": "printed 6.2-68", "claim": "VA describes stakeholder engagement and DoD collaboration; it states that the first phase of Naval Hospital Pensacola ambulatory-surgical renovation was complete and first patients were seen in 2024, while phase two was ongoing.", "status_clock": "agency-described operational status", "limit": "The CJ is the source for the description only; this receipt did not independently verify DoD project records or patient-service dates." }, { "id": "va_v4_b34_c3", "locator": "printed 6.2-69 to 6.2-74", "claim": "Office, warehouse, disposal, VBA, OIT, OIG, and OA/HRA targets rely on policy, FRPP/GSA space data, internal planning, and announced/estimated reductions. The FY 2027-31 footprint targets are forward-looking.", "status_clock": "planning target with selected stated historical actions", "limit": "The listed square-footage reductions and future closures are agency statements in this CJ, not independently validated performance estimates." }, { "id": "va_v4_b34_c4", "locator": "printed 6.2-71", "claim": "Projected capital expenditures use account-specific extrapolations, including two-percent annual growth from stated actual or estimated bases and rough-order estimates where data are not independently captured.", "status_clock": "model assumption/estimate", "limit": "The table expressly says operating plans, awards, and approvals can change actual execution." }, { "id": "va_v4_b34_c5", "locator": "printed 6.3-1 to 6.3-7", "claim": "VHA describes current facilities and a 2022-to-2032 demand/capacity planning frame. It cautions that outyear projects should not be developed solely to close modeled gap goals without planned execution.", "status_clock": "baseline description plus forecast/model", "limit": "The receipt does not treat modeled space gaps, condition findings, or projected costs as measured outcomes of a particular investment." }, { "id": "va_v4_b34_c6", "locator": "printed 6.3-6 to 6.3-8", "claim": "VHA lists telemedicine, extended hours, and community care as noncapital strategies; Table 3-1 reports a FY 2027 minor-construction request and prospective capital totals, with lifecycle costs excluded from the long-range snapshot.", "status_clock": "strategy plus budget request/forecast", "limit": "Strategy listing does not demonstrate causal demand reduction or cost savings." }, { "id": "va_v4_b34_c7", "locator": "printed 6.3-9 to 6.3-22", "claim": "Table 3-2 continues a prospective inventory of VHA above-threshold projects, including estimated costs and program labels such as USP 800 compliance and PACT.", "status_clock": "future project inventory", "limit": "Program labels and rows are not treated as separately read upstream evidence objects." } ], "upstream_source_census": [ { "id": "v4_b34_table_2_8_future_projects", "identity": "Table 2-8, Potential Future Year Above Threshold Projects", "cj_locator": "printed 6.2-57 to 6.2-66", "type": "internal planning table", "role": "Prospective capital-project inventory and estimated cost display.", "status": "read_in_CJ_only", "limits": "Rows are forecasts/plans; no individual external study or execution evidence identified." }, { "id": "v4_b34_table_2_9_long_range_plan", "identity": "Table 2-9, VHA Full Long-Range Plan", "cj_locator": "printed 6.2-67, notes 1-2", "type": "internal planning table/model", "role": "Summarizes project counts/costs; identifies 10-year, 5-year, and 3-year account horizons and lump-sum estimates through 2036.", "status": "read_in_CJ_only", "limits": "The model inputs and calculations were not supplied as a separately identified public source." }, { "id": "v4_b34_omb_memoranda", "identity": "OMB Memoranda M-20-03, M-21-25, M-22-14, M-23-15, and M-12-12", "cj_locator": "printed 6.2-68 to 6.2-74", "type": "executive-branch policy guidance", "role": "Stated basis for federal real-property, workplace, planning, and space-management actions.", "status": "identified_in_CJ_not_opened_this_batch", "exact_url": null, "limits": "This receipt records each memorandum family as cited policy guidance; it does not claim original-text review." }, { "id": "v4_b34_dod_cidm_and_pensacola", "identity": "Department of Defense Clinical Integration and Management Division process; Naval Hospital Pensacola multi-phase renovation", "cj_locator": "printed 6.2-68", "type": "interagency process and agency-described project status", "role": "VA says it assesses potential DoD opportunities and describes the Pensacola project timeline/status.", "status": "CJ_description_only", "exact_url": null, "limits": "No separately identified CIDM document or project record was cited; phase-completion and patient statements remain unverified agency claims." }, { "id": "v4_b34_frpp_and_gsa_data", "identity": "Federal Real Property Profile Management System and General Services Administration occupancy-agreement data", "cj_locator": "printed 6.2-69 to 6.2-70", "type": "administrative data", "role": "Stated information base for office/warehouse and disposal targets.", "status": "identified_in_CJ_not_opened_this_batch", "exact_url": null, "limits": "The CJ does not provide a vintage, dataset extract, or reproducible target calculation." }, { "id": "v4_b34_table_2_7_expenditure_assumptions", "identity": "Table 2-7, Projected Capital Expenditures, and notes 52E through 57S", "cj_locator": "printed 6.2-71", "type": "internal budget model/table", "role": "Uses current operating plans/projected awards, stated two-percent escalators from FY 2024 actual or FY 2026 estimate bases, and rough-order estimates for selected items.", "status": "read_in_CJ_only", "limits": "Approvals, awards, execution, and untracked data can change results; the calculation workbook was not cited." }, { "id": "v4_b34_use_it_act", "identity": "Utilizing Space Efficiently and Improving Technologies Act, P.L. 118-272, section 2302", "cj_locator": "printed 6.2-74", "type": "law", "role": "Cited in the OIG space-release discussion.", "status": "identified_in_CJ_not_opened_this_batch", "exact_url": null, "limits": "The exact statutory text and applicability were not independently reviewed here." }, { "id": "v4_b34_future_of_work_study", "identity": "2022 Future of Work Consolidation Study", "cj_locator": "printed 6.2-74", "type": "internal study", "role": "OA/HRA says it commissioned the study in response to M-22-14, paused it in 2023, reissued a data call, and completed it in 2024.", "status": "identity_partially_located_in_CJ_only", "exact_url": null, "limits": "No report author, publisher, methodology, results, or public link is supplied; completion is an agency statement." }, { "id": "v4_b34_return_to_office_policy_family", "identity": "OPM Return-to-Office framework; VA internal Space Policy; Executive Order described by CJ as Department of Government Efficiency Workforce Optimization Initiative; VA RIF/Reorganization Plans", "cj_locator": "printed 6.2-72 to 6.2-74", "type": "policy/strategy family", "role": "Cited as planning context for VBA, OIT, and OA/HRA real-property actions.", "status": "partially_identified_in_CJ_not_opened_this_batch", "exact_url": null, "limits": "The CJ's executive-order wording has no number or formal title here; this record does not infer a particular order." }, { "id": "v4_b34_vha_demand_condition_inputs", "identity": "VHA 2022 baseline and projected 2032 demand/capacity frame; facility-condition assessment D/F deficiencies", "cj_locator": "printed 6.3-1 to 6.3-5", "type": "agency data/model", "role": "Frames utilization, space gaps, closure/demolition needs, and outyear planning.", "status": "read_in_CJ_only", "exact_url": null, "limits": "No separately named model, data vintage, validation study, or calculation method is supplied in these pages." }, { "id": "v4_b34_noncapital_strategy_and_privacy_authorities", "identity": "Telemedicine, extended hours, community care; HIPAA and Privacy Act references", "cj_locator": "printed 6.3-6", "type": "strategy and legal-authority references", "role": "Lists noncapital approaches and conditions for community-care substitution.", "status": "read_in_CJ_only", "exact_url": null, "limits": "No empirical evaluation is cited here to establish utilization, access, or cost effects." }, { "id": "v4_b34_table_3_1_and_dos_authority", "identity": "Table 3-1, VHA Capital Investment Plan; Secure Embassy Construction and Counterterrorism Act, P.L. 106-113, section 1000(a)(7)", "cj_locator": "printed 6.3-8", "type": "budget table and law", "role": "Presents FY 2027 request/prospective totals and identifies a Department of State capital-security reimbursement context.", "status": "table_read_law_identified_not_opened_this_batch", "exact_url": null, "limits": "Lifecycle costs are excluded from the long-range snapshot; statutory text and reimbursement calculations were not independently reviewed." },
Section 2 of 2
{
"id": "v4_b34_table_3_2_future_projects",
"identity": "Table 3-2, VHA Potential Future Year Above Threshold Projects",
"cj_locator": "printed 6.3-9 to 6.3-22; continues at 6.3-23",
"type": "internal planning table",
"role": "Prospective VHA capital-project inventory with program labels and estimated costs.",
"status": "partially_read_table_continues",
"limits": "Only the table portion in this batch was read; its continuation is explicitly queued. Rows are not represented as individual evidence sources."
}
], "unresolved_or_remaining": [ "Continue Table 3-2 from physical 321 / printed 6.3-23 before treating the full VHA prospective-project inventory as reviewed.", "Original texts/data for all cited OMB memoranda, FRPP/GSA inputs, Future of Work study, internal space policy, OPM framework, and cited laws remain unexpanded.", "The CJ gives no reproducible source package for VHA demand/capacity, condition, utilization, or project-cost modeling in this range.", "No conclusion is made about the effectiveness of telemedicine, extended hours, community care, footprint reduction, or project investment." ], "quality_checks": { "physical_and_printed_labels_directly_checked": true, "sequential_full_text_and_tables_read": true, "external_originals_read_in_this_batch": false, "canonical_or_shared_files_edited": false } }