Skip to content
Browse the whole research Library · Start page for AI agents ·

tab-06 buildings

.pdf · 10 sections · 13271 characters

Source, owner, and dates

workbench: _Working/federal-budget-2026-2027/goal/terra_process/epa/batch3/sources/tab-06_buildings.pdf

Canonical source SHA-256: 46c9438b3908b7eae326230e7fb5055882ce435f77839a55b41633ac4bd97947

Served copy SHA-256: 46c9438b3908b7eae326230e7fb5055882ce435f77839a55b41633ac4bd97947

Owner evidence cutoffs: {"federal-budget-fy2026-fy2027": "2026-09-11T19:55:13-04:00"}

These are package-level cutoffs, not a claim that this source was rechecked on those dates. Use its own publication and capture dates.

Owners: federal-budget-fy2026-fy2027

pdf text needs review

Page 1

Section 1 of 10

EP A-190R26002 "QSJM 2026 www.epa.gov/cj United States Environmental Protection Agency Fiscal Year 2027 JustifJcation of Appropriation Estimates for the
Committee on Appropriations Tab 06: Buildings and Facilities

Page 2

Section 2 of 10

369

Environmental Protection Agency FY 2027 Annual Performance Plan and Congressional Justification

Table of Contents – Buildings and Facilities

Resour ce Summary Table ........................................................................................................... 370 Pro gram Projects in B&F ............................................................................................................ 370 Hom eland Security ...................................................................................................................... 371 Ho meland Security: Protection of EPA Personnel and Infrastructure ........................... 372 Ope rations and Administration ................................................................................................... 374 Fa cilities Infrastructure and Operations ............................................................................ 375

Page 3

Section 3 of 10

370

Environmental Protection Agency FY 2027 Annual Performance Plan and Congressional Justification

APPROP RIATION: Building and Facilities Resource Summary Table (Dollars in Thousands)

FY 2025 Final Actuals FY 2026 Enacted Operating Plan FY 2027 President's Budget FY 2027 President's Budget v. FY 2026 Enacted Operating Plan Building and Facilities
Budget Authority $8,639 $40,676 $35,076 -$5,600 Total Workyears 0.0 0.0 0.0 0.0 Bill Lang uage: Buildings and Facilities

For construction, repair, improvement, extension, alteration, and purchase of fixed equipment or facilities of, or for use by, the Environmental Protection Agency, $35,076,000, to remain available until expended. Program Projects in B&F (Dollars in Thousands) Program Project FY 2025 Final Actuals FY 2026 Enacted Operating Plan FY 2027 President's Budget FY 2027 President's Budget v. FY 2026 Enacted Operating Plan Homeland Security
Homeland Security: Protection of EPA Personnel and Infrastructure $1,492 $6,676 $6,176 -$500 Operations and Administration
Facilities Infrastructure and Operations $7,147 $34,000 $28,900 -$5,100 TOTAL B&F $8,639 $40,676 $35,076 -$5,600

Page 4

Section 4 of 10

371

Home land Security

Page 5

Section 5 of 10

372

Homeland Security: Protection of EPA Personnel and Infrastructure Program Area: Homeland Security Goal: Advance Permitting Reform, Cooperative Federalism, and Cross-Agency Partnership Objective(s): Cooperative Federalism

(Dollars in Thousands)

FY 2025 Final Actuals FY 2026 Enacted Operating Plan FY 2027 President's Budget FY 2027 President's Budget v. FY 2026 Enacted Operating Plan Environmental Programs & Management $5,124 $2,639 $4,986 $2,347 Science & Technology $436 $735 $500 -$235 Building and Facilities $1,492 $6,676 $6,176 -$500 Hazardous Substance Superfund $698 $1,126 $915 -$211 Total Budget Authority $7,750 $11,176 $12,577 $1,401 Total Workyears 13.0 13.3 13.3 0.0 The Agency notes that FY 2026 levels are estimates and subject to refinement based on Administration priorities. Total workyears in FY 2027 include 13.3 FTE to support Homeland Security Working Capital Fund (WCF) services.

Program Project Description:

The EPA Buildings and Facilities Homeland Security: Protection of EPA Personnel and Infrastructure Program will realize savings due to space consolidation plans that reduce the number of occupied facilities, consolidate space within remaining facilities, a nd reduce square footage, yielding cost savings to the American taxpayer. This program supports the protection of federal employees, contractors, grantees, and private citizens (occupants) who work within or visit EPA facilities nationwide. EPA’s buildings are a combination of headquarters and regional offices, program and research laboratories, and support facilities/warehouses. These facilities are either EPA owned/leased or General Services Administration (GSA) owned/leased. This funding ensures federal mandates are met as they relate to physical security and local emergency preparedness for all Agency locations. These funds support the physical security protection equipment and mechanisms required to protect occupants during facility relocation ( e.g., moves, new leases, consolidations, etc.), physical equipment upgrades/modernization, or corrective actions required to address security vulnerabilities identified during security assessments.

FY 2027 Activities and Performance Plan:

Work in this program directly supports Goal 3/Objective 2, Cooperative Federalism , in the
FY 2026-2030 EPA Strategic Plan.

In FY 2027, EPA will continue the adoption of GSA’s Enterprise Physical Access Control System (ePACS) at EPA facilities. ePACS supports the Agency’s modernization of its security infrastructure in compliance with Homeland Security Presidential Directive-12 (HSPD-12) and

Page 6

Section 6 of 10

373

ensures that the Agency is undertaking every effort to enhance safety,1 security, and efficiency by more effectively controlling access into all EPA-controlled physical space and networks.

In FY 2027, EPA will conduct security projects to ensure protection of occupants and compliance with federal mandates for physical security, including:

• Migrating to ePACS at the Region 2 Edison Laboratory, Edison, NJ; Region 3 Wheeling Field Office, Wheeling, WV; Duluth Environmental Laboratory, Duluth, MN; Robert S. Kerr Environmental Research Center, Ada, OK; and Region 2 Guaynabo Field Office, Guaynabo, Puerto Rico. • Upgrading physical security in response to vulnerabilities identified from previously conducted physical security assessments. • Continuing to utilize GSA’s Managed Service Office program, USAccess. USAccess is a shared services solution that provides EPA with the ability to produce and maintain secure and reliable forms of identification for all EPA employees and contractors, as required per HSPD-12.

Performance Measure Targets:

FY 2027 performance goals and targets are located in the FY 2027 Performance Goals tab.

FY 2027 Change from FY 2026 Enacted Budget (Dollars in Thousands):

• (-$500.0) This program change will reduce physical security funding in anticipation of space consolidation plans that will reduce the number of occupied facilities, consolidate space within remaining facilities, and reduce square footage, yielding cost sav ings to the American taxpayer.

Statutory Authority:

Intelligence Reform and Terrorism Prevention Act of 2004; Homeland Security Act of 2002;
Reorganization Plan No. 3 of 1970, 84 Stat. 2086, as amended by Pub. L. 98–80, 97 Stat. 485 (codified at Title 5, App.) (EPA’s organic statute).

1 For additional information, please see: https://www.dhs.gov/homeland-security-presidential-directive-12.

Page 7

Section 7 of 10

374

Ope rations and Administration

Page 8

Section 8 of 10

375

Facilities Infrastructure and Operations Program Area: Operations and Administration Goal: Advance Permitting Reform, Cooperative Federalism, and Cross-Agency Partnership Objective(s): Organizational Excellence

( Dollars in Thousands)

FY 2025 Final Actuals FY 2026 Enacted Operating Plan FY 2027 President's Budget FY 2027 President's Budget v. FY 2026 Enacted Operating Plan Environmental Programs & Management $281,585 $258,274 $252,262 -$6,012 Science & Technology $68,981 $64,714 $60,311 -$4,403 Building and Facilities $7,147 $34,000 $28,900 -$5,100 Leaking Underground Storage Tanks $457 $764 $627 -$137 Inland Oil Spill Programs $275 $676 $555 -$121 Hazardous Substance Superfund $65,886 $66,713 $61,868 -$4,845 Total Budget Authority $424,331 $425,141 $404,523 -$20,618 Total Workyears 295.1 256.2 308.0 51.8 The Agency notes that FY 2026 levels are estimates and subject to refinement based on Administration priorities. Total workyears in FY 2027 include 3.1 FTE in Facilities Infrastructure and Operations working capital fund (WCF) services, an increase of 2.7 FTE. P rogram Project Description: This program is proposed for reduction as EPA anticipates facilities consolidation will allow EPA to reduce resources needed to maintain Agency facilities. EPA’s Buildings and Facilities (B&F) appropriation supports the design, construction, repair, and im provement of EPA’s federally owned and leased land and structures in accordance with applicable codes and standards.
FY 2027 Activities and Performance Plan:

Work in this program directly supports Goal 3/Objective 3, Organizational Excellence , in the
FY 2026-2030 EPA Strategic Plan. In accordance with the Office of Budget and Management ( OMB)’s M-25-25 Implementation of the Utilizing Space Efficiently and Improving Technologies Act, and HR 4465, the Federal Assets Sale and Transfer Act of 2016, 2 the Agency will continue to review its space needs. EPA is implementing a space consolidation plan that will reduce the number of occupied facilities, consolidate space within remaining facilities, and reduce square footage. B&F resources support facility-related construction and the repair and improvement of EPA’s aging real estate inventory. This program reduces bureaucratic delays and encourages increased collaboration between our federal, state, and local partners. Through master planning and nationwide efforts to use space more efficiently, EPA identifies B&F projects to be conducted each fiscal year. These projects support the long-term conditions and efficiency of EPA facilities.

2 For more information, see https://www.congress.gov/bill/114th-congress/house-bill/4465/text.

Page 9

Section 9 of 10

376

EPA is working to reduce unused office and warehouse space. In FY 2025, EPA consolidated employees out of the Ronald Reagan Building, and into existing space within the Federal Triangle in Washington, D.C. The consolidation reduced the Agency’s leased- spaced footprint by approximately 323,000 square feet and lowered annual lease costs by $1 8 million as part of the Administration’s commitment to being exceptional stewards of tax dollars. In FY 2026, the Agency continue s to explore opportunities to reconfigur e EPA’s workplaces with the goal of reducing long-term rent costs. In FY 2027, EPA will focus on footprint reductions in its most expensive leased facilities. Lease savings from space consolidations will allow the Agency to make upgrades to the existing buildings and enhance buildings for the in -person environment. E ach move, even with minimum modifications, requires B&F funding. The Agency expects these consolidations to increase its space utilization rate, which measures the usable square footage per employee against the federal benchmark. The Agency’s space utilization rate in FY 2025 was
38 percent, and targets 45 percent in FY 2027. The FY 2027 request also includes resources for ongoing projects that will provide critical maintenance for aging facilities, including laboratories that are key to ensuring that the Agency has access to safe and functional workspace. Due to persistent issues with the current Region 4 Headquarters and insufficient space at the Los Angeles facility, the Agency has begun to plan the process for both locations. These projects maintain a safe workplace, provide high quality science, support Agency priorities, and advance the Agency’s mission. Delaying essential repairs results in the deterioration of EPA’s facilities, which increases long -term repair costs and presents safety risks. In FY 2027, EPA will continue its phased approach to accomplish major B&F projects across the country, including replacement of roofs in Durham, NC and Ann Arbor, MI and several projects that involve the replacement of mechanical systems nearing the end of their useful life, the lab consolidation projects in Athens, Georgia as well as moving the R6 Houston, Texas laboratory to Ada, Oklahoma, further reducing the Agency’s laboratory footprint. Performance Measure Targets FY 2027 performance goals and targets are located in the FY 2027 Performance Goals tab. FY 2027 Change from FY 2026 Enacted Budget (Dollars in Thousands): • (-$5,100.0) This program change reduces facility infrastructure funding in anticipation of space consolidation that will reduce the number of occupied facilities, consolidate space within remaining facilities, and reduce square footage, yielding cost savings to the American taxpayer. This program is proposed for reduction in alignment with Administration priorities to use taxpayer dollars efficiently and to shrink the federal real estate footprint by eliminating unused federal office space.

Page 10

Section 10 of 10

377

Statutory Authority:

Federal Property and Administration Services Act (FPAS); Reorganization Plan No. 3 of 1970, 84 Stat. 2086, as amended by Pub. L. 98–80, 97 Stat. 485 (codified at Title 5, App.) (EPA’s organic statute).