Source, owner, and dates
workbench: _Working/federal-budget-2026-2027/goal/terra_process/epa/batch3/sources/tab-06_buildings.pdf
Canonical source SHA-256: 46c9438b3908b7eae326230e7fb5055882ce435f77839a55b41633ac4bd97947
Served copy SHA-256: 46c9438b3908b7eae326230e7fb5055882ce435f77839a55b41633ac4bd97947
Owner evidence cutoffs: {"federal-budget-fy2026-fy2027": "2026-09-11T19:55:13-04:00"}
These are package-level cutoffs, not a claim that this source was rechecked on those dates. Use its own publication and capture dates.
Owners: federal-budget-fy2026-fy2027
- PDF text is extracted page by page. Reading order, tables, figures and image-only content still require visual checking; the original PDF controls.
- Pages with little or no extractable text: 4
- Dated budget research working note or source companion. Intermediate batch coverage is historical progress, not a current complete-coverage claim. Enacted appropriations, proposals, authority, outlays and observed delivery remain separate. The maintained budget package controls its current answer.
Page 1
Section 1 of 10
EP A-190R26002 "QSJM 2026
www.epa.gov/cj
United States
Environmental Protection Agency
Fiscal Year 2027
JustifJcation of Appropriation
Estimates for the
Committee on Appropriations
Tab 06: Buildings and Facilities
Page 2
Section 2 of 10
369
Environmental Protection Agency FY 2027 Annual Performance Plan and Congressional Justification
Table of Contents – Buildings and Facilities
Resour ce Summary Table ........................................................................................................... 370 Pro gram Projects in B&F ............................................................................................................ 370 Hom eland Security ...................................................................................................................... 371 Ho meland Security: Protection of EPA Personnel and Infrastructure ........................... 372 Ope rations and Administration ................................................................................................... 374 Fa cilities Infrastructure and Operations ............................................................................ 375
Page 3
Section 3 of 10
370
Environmental Protection Agency FY 2027 Annual Performance Plan and Congressional Justification
APPROP RIATION: Building and Facilities Resource Summary Table (Dollars in Thousands)
FY 2025
Final
Actuals
FY 2026
Enacted
Operating
Plan
FY 2027
President's
Budget
FY 2027
President's Budget
v.
FY 2026 Enacted
Operating Plan
Building and Facilities
Budget Authority $8,639 $40,676 $35,076 -$5,600
Total Workyears 0.0 0.0 0.0 0.0
Bill Lang
uage: Buildings and Facilities
For construction, repair, improvement, extension, alteration, and purchase of fixed equipment or
facilities of, or for use by, the Environmental Protection Agency, $35,076,000, to remain available
until expended.
Program Projects in B&F
(Dollars in Thousands)
Program Project
FY 2025
Final Actuals
FY 2026
Enacted
Operating
Plan
FY 2027
President's
Budget
FY 2027 President's
Budget v.
FY 2026 Enacted
Operating Plan
Homeland Security
Homeland Security: Protection of EPA Personnel
and Infrastructure $1,492 $6,676 $6,176 -$500
Operations and Administration
Facilities Infrastructure and Operations $7,147 $34,000 $28,900 -$5,100
TOTAL B&F $8,639 $40,676 $35,076 -$5,600
Page 4
Section 4 of 10
371
Home land Security
Page 5
Section 5 of 10
372
Homeland Security: Protection of EPA Personnel and Infrastructure Program Area: Homeland Security Goal: Advance Permitting Reform, Cooperative Federalism, and Cross-Agency Partnership Objective(s): Cooperative Federalism
(Dollars in Thousands)
FY 2025 Final Actuals FY 2026 Enacted Operating Plan FY 2027 President's Budget FY 2027 President's Budget v. FY 2026 Enacted Operating Plan Environmental Programs & Management $5,124 $2,639 $4,986 $2,347 Science & Technology $436 $735 $500 -$235 Building and Facilities $1,492 $6,676 $6,176 -$500 Hazardous Substance Superfund $698 $1,126 $915 -$211 Total Budget Authority $7,750 $11,176 $12,577 $1,401 Total Workyears 13.0 13.3 13.3 0.0 The Agency notes that FY 2026 levels are estimates and subject to refinement based on Administration priorities. Total workyears in FY 2027 include 13.3 FTE to support Homeland Security Working Capital Fund (WCF) services.
Program Project Description:
The EPA Buildings and Facilities Homeland Security: Protection of EPA Personnel and Infrastructure Program will realize savings due to space consolidation plans that reduce the number of occupied facilities, consolidate space within remaining facilities, a nd reduce square footage, yielding cost savings to the American taxpayer. This program supports the protection of federal employees, contractors, grantees, and private citizens (occupants) who work within or visit EPA facilities nationwide. EPA’s buildings are a combination of headquarters and regional offices, program and research laboratories, and support facilities/warehouses. These facilities are either EPA owned/leased or General Services Administration (GSA) owned/leased. This funding ensures federal mandates are met as they relate to physical security and local emergency preparedness for all Agency locations. These funds support the physical security protection equipment and mechanisms required to protect occupants during facility relocation ( e.g., moves, new leases, consolidations, etc.), physical equipment upgrades/modernization, or corrective actions required to address security vulnerabilities identified during security assessments.
FY 2027 Activities and Performance Plan:
Work in this program directly supports Goal 3/Objective 2, Cooperative Federalism , in the
FY 2026-2030 EPA Strategic Plan.
In FY 2027, EPA will continue the adoption of GSA’s Enterprise Physical Access Control System (ePACS) at EPA facilities. ePACS supports the Agency’s modernization of its security infrastructure in compliance with Homeland Security Presidential Directive-12 (HSPD-12) and
Page 6
Section 6 of 10
373
ensures that the Agency is undertaking every effort to enhance safety,1 security, and efficiency by more effectively controlling access into all EPA-controlled physical space and networks.
In FY 2027, EPA will conduct security projects to ensure protection of occupants and compliance with federal mandates for physical security, including:
• Migrating to ePACS at the Region 2 Edison Laboratory, Edison, NJ; Region 3 Wheeling Field Office, Wheeling, WV; Duluth Environmental Laboratory, Duluth, MN; Robert S. Kerr Environmental Research Center, Ada, OK; and Region 2 Guaynabo Field Office, Guaynabo, Puerto Rico. • Upgrading physical security in response to vulnerabilities identified from previously conducted physical security assessments. • Continuing to utilize GSA’s Managed Service Office program, USAccess. USAccess is a shared services solution that provides EPA with the ability to produce and maintain secure and reliable forms of identification for all EPA employees and contractors, as required per HSPD-12.
Performance Measure Targets:
FY 2027 performance goals and targets are located in the FY 2027 Performance Goals tab.
FY 2027 Change from FY 2026 Enacted Budget (Dollars in Thousands):
• (-$500.0) This program change will reduce physical security funding in anticipation of space consolidation plans that will reduce the number of occupied facilities, consolidate space within remaining facilities, and reduce square footage, yielding cost sav ings to the American taxpayer.
Statutory Authority:
Intelligence Reform and Terrorism Prevention Act of 2004; Homeland Security Act of 2002;
Reorganization Plan No. 3 of 1970, 84 Stat. 2086, as amended by Pub. L. 98–80, 97 Stat. 485
(codified at Title 5, App.) (EPA’s organic statute).
1 For additional information, please see: https://www.dhs.gov/homeland-security-presidential-directive-12.
Page 7
Section 7 of 10
374
Ope rations and Administration
Page 8
Section 8 of 10
375
Facilities Infrastructure and Operations Program Area: Operations and Administration Goal: Advance Permitting Reform, Cooperative Federalism, and Cross-Agency Partnership Objective(s): Organizational Excellence
( Dollars in Thousands)
FY 2025
Final Actuals
FY 2026
Enacted
Operating
Plan
FY 2027
President's
Budget
FY 2027 President's
Budget v.
FY 2026 Enacted
Operating Plan
Environmental Programs & Management $281,585 $258,274 $252,262 -$6,012
Science & Technology $68,981 $64,714 $60,311 -$4,403
Building and Facilities $7,147 $34,000 $28,900 -$5,100
Leaking Underground Storage Tanks $457 $764 $627 -$137
Inland Oil Spill Programs $275 $676 $555 -$121
Hazardous Substance Superfund $65,886 $66,713 $61,868 -$4,845
Total Budget Authority $424,331 $425,141 $404,523 -$20,618
Total Workyears 295.1 256.2 308.0 51.8
The Agency notes that FY 2026 levels are estimates and subject to refinement based on Administration priorities.
Total workyears in FY 2027 include 3.1 FTE in Facilities Infrastructure and Operations working capital fund (WCF) services, an
increase of 2.7 FTE.
P
rogram Project Description:
This program is proposed for reduction as EPA anticipates facilities consolidation will allow EPA
to reduce resources needed to maintain Agency facilities. EPA’s Buildings and Facilities (B&F)
appropriation supports the design, construction, repair, and im provement of EPA’s federally
owned and leased land and structures in accordance with applicable codes and standards.
FY 2027 Activities and Performance Plan:
Work in this program directly supports Goal 3/Objective 3, Organizational Excellence , in the
FY 2026-2030 EPA Strategic Plan.
In accordance with the Office of Budget and Management ( OMB)’s M-25-25 Implementation of
the Utilizing Space Efficiently and Improving Technologies Act, and HR 4465, the Federal Assets
Sale and Transfer Act of 2016,
2 the Agency will continue to review its space needs. EPA is
implementing a space consolidation plan that will reduce the number of occupied facilities,
consolidate space within remaining facilities, and reduce square footage. B&F resources support
facility-related construction and the repair and improvement of EPA’s aging real estate inventory.
This program reduces bureaucratic delays and encourages increased collaboration between our
federal, state, and local partners. Through master planning and nationwide efforts to use space
more efficiently, EPA identifies B&F projects to be conducted each fiscal year. These projects
support the long-term conditions and efficiency of EPA facilities.
2 For more information, see https://www.congress.gov/bill/114th-congress/house-bill/4465/text.
Page 9
Section 9 of 10
376
EPA is working to reduce unused office and warehouse space. In FY 2025, EPA consolidated
employees out of the Ronald Reagan Building, and into existing space within the Federal Triangle
in Washington, D.C. The consolidation reduced the Agency’s leased- spaced footprint by
approximately 323,000 square feet and lowered annual lease costs by $1 8 million as part of the
Administration’s commitment to being exceptional stewards of tax dollars. In FY 2026, the
Agency continue s to explore opportunities to reconfigur e EPA’s workplaces with the goal of
reducing long-term rent costs. In FY 2027, EPA will focus on footprint reductions in its most
expensive leased facilities. Lease savings from space consolidations will allow the Agency to make
upgrades to the existing buildings and enhance buildings for the in -person environment. E ach
move, even with minimum modifications, requires B&F funding. The Agency expects these
consolidations to increase its space utilization rate, which measures the usable square footage per
employee against the federal benchmark. The Agency’s space utilization rate in FY 2025 was
38 percent, and targets 45 percent in FY 2027.
The FY 2027 request also includes resources for ongoing projects that will provide critical
maintenance for aging facilities, including laboratories that are key to ensuring that the Agency
has access to safe and functional workspace. Due to persistent issues with the current Region 4
Headquarters and insufficient space at the Los Angeles facility, the Agency has begun to plan the
process for both locations. These projects maintain a safe workplace, provide high quality science,
support Agency priorities, and advance the Agency’s mission. Delaying essential repairs results in
the deterioration of EPA’s facilities, which increases long -term repair costs and presents safety
risks.
In FY 2027, EPA will continue its phased approach to accomplish major B&F projects across the
country, including replacement of roofs in Durham, NC and Ann Arbor, MI and several projects
that involve the replacement of mechanical systems nearing the end of their useful life, the lab
consolidation projects in Athens, Georgia as well as moving the R6 Houston, Texas laboratory to
Ada, Oklahoma, further reducing the Agency’s laboratory footprint.
Performance Measure Targets
FY 2027 performance goals and targets are located in the FY 2027 Performance Goals tab.
FY 2027 Change from FY 2026 Enacted Budget (Dollars in Thousands):
• (-$5,100.0) This program change reduces facility infrastructure funding in anticipation of
space consolidation that will reduce the number of occupied facilities, consolidate space
within remaining facilities, and reduce square footage, yielding cost savings to the
American taxpayer. This program is proposed for reduction in alignment with
Administration priorities to use taxpayer dollars efficiently and to shrink the federal real
estate footprint by eliminating unused federal office space.
Page 10
Section 10 of 10
377
Statutory Authority:
Federal Property and Administration Services Act (FPAS); Reorganization Plan No. 3 of 1970, 84 Stat. 2086, as amended by Pub. L. 98–80, 97 Stat. 485 (codified at Title 5, App.) (EPA’s organic statute).