.md · 2 sections · 12850 characters

Source, owner, and dates

workbench: Research Packages/Federal Government Deep Website Review 2026-09-22/waves/WAVE_10C_BLOCKED_OBJECT_REPLAY.md

Canonical source SHA-256: d6bf5a1ab5e96d0ccc88ab2b2ebf3dd3925548269a0af430748320ab1f96c204

Served copy SHA-256: d6bf5a1ab5e96d0ccc88ab2b2ebf3dd3925548269a0af430748320ab1f96c204

Owner evidence cutoffs: {}

These are package-level cutoffs, not a claim that this source was rechecked on those dates. Use its own publication and capture dates.

Owners: federal-government-deep-website-review-2026-09-22

Opening section

Section 1 of 2

# Wave 10C — blocked-object and exact-publication replay

## Control receipt

This was a strictly bounded replay of named unresolved objects: the Wave 0 OFAC publication seam; September 16–22 War.gov contract releases; blocked State, USTDA and DSCA dated inventories; GSA Federal Register document 2026-19331; and the NTIA QFR body only if Wave 10B had left it unresolved. It did not reopen the BIS, ACA or PLO bodies already recovered by root.

The general cursor is strictly after 2026-09-16 19:10:34 EDT, with inclusive boundary-date replay for date-only, batch-posted and delayed sources. The Treasury/OFAC overlap cursor is strictly after 2026-09-20 16:20:12 EDT. September 17–18 OFAC actions were therefore reopened only to reconcile later filing/publication receipts, not to create new post-cursor sanctions events. The frozen cutoff remained 2026-09-22 11:51:46 EDT.

Later-retrieved Federal Register endpoints were used only to recover stable document identity, filing time and the body that was already publicly filed through the cutoff. No post-cutoff publication, later site state or later implementation is used to advance a claim.

This Workbench return does not authorize a Chronicle, Catalog, Registry, Return Ledger, watch, app or site change.

## Result

Two reconciliation units survive:

  1. The OFAC publication seam is now exact. Federal Register document 2026-19287, published September 22 after an 8:45 a.m. September 21 filing, is a delayed publication receipt for the Iran-related portion of OFAC's September 17 list action. Public-inspection document 2026-19488, filed September 22 at 8:45 a.m. and scheduled for September 23 publication, is instead a separate September 14 VTB Bank designation under E.O. 13902. It is not a September 17–18 event. No second sanctions event is created from either publication lead.
  2. GSA 2026-19331 is a material proposal-only control object. GSA proposes to move Federal Supply Schedule ordering procedures from FAR subpart 8.4 to GSAR part 538 and reorganize them. Comments are due October
  3. The object has no effective date and did not make the move operative through the cutoff.

No Defense contract, State press item, USTDA object or DSCA arms-sale object survived the bounded direct-source replay. Those results are access-limited or bounded empty hunts, not evidence of institutional inactivity. Wave 10B had already closed the NTIA QFR seam as a custody-only fold, so it was not reopened.

## Reconciliation 1 — OFAC direct action, filing and publication clocks

### Exact object map

Controlling object What the direct/body record establishes Filing/publication relationship through cutoff Disposition
OFAC September 17 recent action Iran-related and Cuba designations/additions plus Belarus-related SDN deletions occurred September 17 FR 2026-19287 was filed September 21 at 8:45 a.m. and published September 22. Its body says the action was issued September 17 and describes persons designated under E.O. 13902 for operating in Iran's digital-asset sector. It is the Iran publication receipt, not a republication of the Cuba additions or Belarus deletions. fold_into_existing; direct September 17 action remains the state-change owner
OFAC September 18 recent action E.O. 14046's Ethiopia emergency had expired; OFAC removed the related SDN entries and program FAQs; separately, OFAC issued Russia-related General License 131J and amended FAQs 1224 and 1225 No additional Federal Register or public-inspection identity for these September 18 objects was located in the in-cutoff September 22 publication/PI population. The direct OFAC page is therefore the controlling reached record. fold_into_existing; no duplicate publication event
PI 2026-19488 and raw filed text The body records a September 14 OFAC determination designating VTB Bank under E.O. 13902 for operating in the financial sector of Iran Filed September 22 at 8:45 a.m.; scheduled publication September 23. The scheduled publication remained future at the cutoff. The underlying sanctions action predates both the general cursor and the September 17–18 actions. coverage_only; reject as a Sep. 17–18 match or new post-cursor event

### Before/after and actor clocks

### Claim limits

The reached records establish public list, license, FAQ, filing and publication states. They do not establish a blocked payment, rejected transaction, specific-license determination, compliance response, asset recovery, enforcement action or observed economic effect. GL 131J authorizes covered conduct under its own terms; issuance does not prove that any sale, contingent contract, maintenance transaction or payment occurred. The September 18 page states that the E.O. 14046 emergency expired; this replay does not infer the legal status of any authority outside that program.

## Reconciliation 2 — GSA 2026-19331 remains a proposal

Primary objects:

### Proposed before/after state

### Authority and claim limit

GSA's Office of Acquisition Policy is the proposing actor. OFPP, OMB, DoD, GSA and NASA comprise the FAR Council described in the preamble, and OMB Memorandum M-25-26 and E.O. 14275 are the policy parents. Those relationships do not make the proposed GSAR text current law. Through the cutoff, this was a notice-and-comment proposal: no final rule, operative relocation, agency order placed under the proposed structure, procurement acceleration, cost saving or competition result was established.

Proposed disposition: plotline_support_only / fold_into_existing with the government-wide acquisition-control owner. Next qualifying gate is a final FAR/GSAR rule with an effective clock, followed separately by first traceable agency use.

## Bounded blocked-object replay

Surface State reached Coverage and claim limit
War.gov Contracts blocked_unresolved The direct index returned 403 and the official dynamic daily bodies for September 16–22 were not recoverable in this replay. Exact-title searches did not return the 2026 daily releases. No ceiling, award, obligation, order, option exercise, delivery or acceptance state can be adjudicated; no empty-period inference is allowed.
State press-release inventory blocked_unreached The direct inventory returned 403. A bounded official-domain lookup did not yield a qualifying post-cursor body. This is not evidence that State issued no release or took no action.
USTDA press inventory blocked_unreached The direct press index remained inaccessible. The only dated official item surfaced in the bounded lookup was a September 17–18 aviation-security symposium page, which is an event description rather than a new obligation, award, payment, delivery or authority change. No qualifying object retained.
DSCA Major Arms Sales library blocked_partial Search indexing exposed library filenames, but the direct dated inventory/body route remained 403 and no in-window upload clock was recoverable for a candidate. A library filename does not establish a new congressional notification clock, signed LOA, contract, payment, shipment or delivery.
NTIA publication/QFR seam not_reopened Accepted Wave 10B recorded a bounded empty hunt and retained the September 21 QFR repository timestamp only as Wave 8's custody object. No unresolved body remained for Wave 10C.

## Rejected upgrades and folds

Object Disposition Reason
FR 2026-19287 fold_into_existing Delayed official publication of the September 17 Iran action; not a second sanctions determination
PI 2026-19488 coverage_only Separate September 14 VTB determination; filing is inside the window but the action is pre-cursor and publication was still future
Sep. 17 Cuba additions and Belarus deletions fold_into_existing Direct OFAC list changes are controlling; no separate in-cutoff FR identity reached
Sep. 18 Ethiopia removals, GL 131J and FAQ changes fold_into_existing Direct OFAC owner already retained by Wave 9 reconciliation; no duplicate publication event
GSA 2026-19331 plotline_support_only / fold_into_existing Material acquisition-control proposal, but not an operative FAR/GSAR change
USTDA aviation-security symposium reject_event_only Convening/program page without authority, award, payment, delivery or operation change
DSCA indexed filenames reject_metadata_only No defensible in-window upload/body clock; proposed sale is also distinct from LOA, contract, shipment and delivery

Open gates and next cursor

Section 2 of 2

## Open gates and next cursor

  1. Replay the exact September 16–22 War.gov daily contract bodies only when the official pages become reachable. Preserve ceiling, award, obligated amount, order, option, delivery and acceptance as separate states.
  2. For OFAC, use the direct action date as the state-change cursor and fold later Federal Register publication to that owner. Do not treat scheduled September 23 publication of 2026-19488 as a new sanctions event.
  3. For GSA, return at a final-rule/effective-date gate or first traceable use of the relocated FSS procedure. Do not infer operation from comments or a supporting acquisition-policy page.
  4. Replay State, USTDA and DSCA only from direct dated inventories or a named primary body. For arms sales, congressional notification, LOA, contract, obligation/payment, shipment and delivery remain separate clocks.

Subject to those named access gaps, the next general source cursor remains 2026-09-22 11:51:46 EDT; the Treasury/OFAC source cursor also advances to that cutoff for genuinely new direct actions. Date-only, batch-posted or delayed publishers require inclusive September 22 replay on the next pass.