Skip to content
Browse the whole research Library · Start page for AI agents ·

GAO Navy attack-submarine readiness (GAO-26-109256)

.md · 1 sections · 3807 characters

Source, owner, and dates

vault: 02 - Research/Official Records/Official filings/2026-08-27-0000 - GAO Navy attack-submarine readiness GAO-26-109256.md

Canonical source SHA-256: cbaf301076fdd4bc9c5c2bae794856d2d3ff4b2f67051bbc380b9ddbf07e2b4e

Served copy SHA-256: cbaf301076fdd4bc9c5c2bae794856d2d3ff4b2f67051bbc380b9ddbf07e2b4e

Owner evidence cutoffs: {"official-records-source-library": "2026-10-14"}

These are package-level cutoffs, not a claim that this source was rechecked on those dates. Use its own publication and capture dates.

Owners: official-records-source-library

complete text

Opening section

Section 1 of 1

# GAO Navy attack-submarine readiness (GAO-26-109256)

## Quote / Content

The U.S. Navy has not fully mitigated attack submarine fleet maintenance and other challenges affecting readiness. Over the last 10 years, the U.S. Navy has lost more than 15,000 operational days due to maintenance delays and idle time on active attack submarines. These delays resulted in an estimated $3.4 billion in costs to sustain crews and submarines that provided no operational capability.

Using historical daily cost data that the U.S. Navy adjusted for inflation, we estimated that from fiscal years 2016 through 2025, the U.S. Navy spent about $4.2 billion ($3.4 billion for days of maintenance delay and active idle time and $722 million for inactive idle time) in calendar year 2025 dollars on attack submarines sitting idle while waiting to enter the shipyards and on those delayed in completing their maintenance at the shipyards.

Without mitigation, the U.S. Navy projects that 15 more attack submarines and their crews will enter inactive idle time from fiscal years 2026 through 2030—during which time the U.S. Navy will incur more than 14,000 days of inactive idle time and $3.1 billion in operating and support costs, according to our analysis.

We are making the following two recommendations to the Department of the Navy:

The Secretary of the Navy should ensure that the Chief of Naval Operations directs the Naval Sea Systems Command to fully evaluate alternative options for decommissioning attack submarines more efficiently to optimize shipyard capacity for the operational fleet. Such options may include, but are not limited to, defueling outside of dry docks and reducing crewing for attack submarines awaiting decommissioning. (Recommendation 1)

The Secretary of the Navy should ensure that the Chief of Naval Operations directs the Naval Sea Systems Command to use the evaluation above to develop and implement a plan for attack submarine inactivations that reduces inactive idle time for crews and submarines. This plan should include steps to achieve objectives and timeframes for monitoring and mitigating risk for inactive idle time reduction. (Recommendation 2)

The Navy, on behalf of DOD, verbally concurred with the recommendations in this report, but did not provide written comments.

## My notes

GAO-26-109256, Navy Readiness: Actions Needed to Address Costly Attack Submarine Maintenance Challenges. Published and publicly released Aug. 27, 2026. Report to the House Armed Services Committee. Public version of a classified report issued July 16, 2026. Product page lists both recommendations Open.

Two clocks, kept separate.

  1. FY2016–2025 historical estimate: about $4.2 billion in calendar year 2025 dollars, which the full report states as $3.4 billion for maintenance-delay and active-idle days plus $722 million for inactive-idle time. Table 1's combined total prints as $4.17 billion. More than 15,000 lost operational days. These are GAO estimates from average daily operating-and-support rates, not invoices, obligations, outlays, or an appropriation line.

  2. FY2026–2030 projection without mitigation: 15 boats, more than 14,000 inactive-idle days, and $3.1 billion. That is not a budget request.

Do not substitute the projection for the historical estimate, or the reverse.

Two recommendations; Navy verbal concurrence is not implementation.

## Why this matters

Idle-day cost estimates are not a cash transfer and not a repaired shipyard.