Skip to content
Browse the whole research Library · Start page for AI agents ·

Global Oil and Gas Movements — Project Constitution and Wave Plan

.md · 1 sections · 10017 characters

Source, owner, and dates

workbench: Research Packages/Global Oil and Gas Movements 2026/PROJECT_CONSTITUTION_AND_WAVE_PLAN.md

Canonical source SHA-256: 2ff927bfb1a456a781b3af92a5446d4640fb88b8251178041cd769e6a409b9b8

Served copy SHA-256: 2ff927bfb1a456a781b3af92a5446d4640fb88b8251178041cd769e6a409b9b8

Owner evidence cutoffs: {"global-oil-gas-movements": "2026-09-30"}

These are package-level cutoffs, not a claim that this source was rechecked on those dates. Use its own publication and capture dates.

Owners: global-oil-gas-movements

Global Oil and Gas Movements — Project Constitution and Wave Plan

Section 1 of 1

# Global Oil and Gas Movements — Project Constitution and Wave Plan

Updated: 2026-09-15
Status: current project method and research boundary
Evidence cutoff for the initial plan: 2026-09-15, America/New_York

## Purpose

Build one inspectable system for answering four different questions without collapsing them:

  1. Structure: where fields, pipelines, terminals, refineries, chokepoints, storage and buyer markets sit.
  2. Movement: what moved, when, by which mode, in what quantity, according to which observation.
  3. Permission and control: who may sell, load, insure, finance, transport, receive or redirect the cargo.
  4. Execution: whether an announcement or agreement reached contract, capital, field work, production, lifting, payment, fiscal receipt and sustained operation.

## Material scope

### Core theatres

### Balancers that become material when a core route breaks

United States, Canada, Brazil, Guyana, Norway, Kazakhstan/Azerbaijan, Libya, Nigeria, Angola and Algeria. Australia, the United States, Africa and other LNG suppliers belong in the gas-balancing lane. China, India, the EU/UK, Japan, South Korea and Singapore are buyer/refining/trading hubs, not a single destination bucket.

### Chokepoints and bypasses

Hormuz; Bab el-Mandeb; Suez/SUMED; Cape of Good Hope; Turkish Straits; Danish Straits; Malacca/Singapore; Panama; and named pipeline/overland bypasses. A longer route, a pipeline route and a ship-to-ship workaround are distinct physical and cost objects.

## Commodity separation

Never use oil as a sufficient cargo description when the source is more specific. Preserve:

Oil and gas share geography and some commercial actors, but their plants, carriers, storage, contracts, units and substitution dynamics differ.

## The clock model

Every record carries one state and one observation/effective clock. Required state vocabulary:

announced
signed_or_granted
authorized
financed
under_construction_or_rehabilitation
established
operating
constrained
disrupted
produced
nominated
loaded
in_transit
discharged
paid
received
sustained
estimated
alleged
forecast
target

Do not advance a record merely because a later date arrived. The public receipt for the next state must exist.

## Evidence classes

Class Use
A-OPERATIVE Signed law/order/license, executed contract or concession, port/customs record, bill of lading, registry entry, award, filing or other object that changes a legal or operating state.
B-OFFICIAL-REPORTING Government, state-company, intergovernmental or operator report describing an occurred movement or measured aggregate.
C-MODELED-ESTIMATE EIA/IEA/IMF/customs or commercial estimate. Record method, reference period and revision risk.
D-ENTITY-CLAIM Company or government statement about its own plan, capacity, cost, reserves or performance without the underlying receipt.
E-OBSERVED-SECONDARY AIS, satellite, shipping-intelligence, press or analyst observation used for discovery or a bounded estimate.
F-OFFICIAL-ALLEGATION Sanctions, enforcement or security allegation not independently adjudicated cargo by cargo.
GAP The join or source object needed to move the claim is not public or not located.

Primary source and direct movement observation are different properties. An official forecast remains a forecast. A company contract statement may be the best public evidence that a contract was signed, but not the contract text.

## Non-conflations

  1. AIS position is not cargo identity, origin, volume, buyer, legal permission or payment.
  2. A port call is not necessarily a loading or discharge.
  3. Chokepoint transit counts are not oil volume unless vessel type, cargo and load assumptions are explicitly modeled.
  4. A sanctions license authorizes covered conduct; it does not prove a trade occurred.
  5. An agreement is not financing, FID, drilling, repaired infrastructure, production, lifting or receipt.
  6. Reserves, oil in place, productive capacity, current production and exports are different measures.
  7. Crude production and refined-product availability are not interchangeable.
  8. Seller, state oil company, field operator, marketer, title owner, vessel owner, beneficial owner, ISM manager, charterer, insurer, paying bank and final beneficiary may all differ.
  9. A blocked or sanctioned vessel state does not prove a particular cargo is illicit; a clean vessel record does not prove the voyage is lawful.
  10. War-risk advice, physical attack, closure, constrained passage and normal passage are distinct states.

## Wave plan

### Wave 0 — Constitution and source architecture — complete

### Wave 1 — Iran war and Middle East movement baseline — in progress

### Wave 2 — Venezuela execution — initial ledger complete; source recovery next

### Wave 3 — Russia and the sanctions/shadow-fleet system — initial matrix complete

### Wave 4 — Global replacement barrels and buyer rewiring — initial matrix complete

### Wave 5 — Gas and LNG as its own network — initial matrix complete

### Wave 6 — Map build — initial working globe complete; enrichment next

### Wave 7 — Recurrence and comparison — initial method complete

## Source hierarchy

  1. Signed laws, regulations, licenses, contracts/concessions and official filings.
  2. Port, pipeline, customs, state oil company, operator, registry, insurer and bank records.
  3. EIA, IEA, IMF PortWatch, OPEC/JODI and national statistical series.
  4. Commercial tanker/AIS/satellite estimates with method and access state.
  5. News and social material for discovery, never as silent cargo proof.

## Completion test for a mapped edge

An edge may be drawn as established only when its endpoints, commodity, direction, clock and source are explicit. Volume requires its own source and unit. A colored current-state overlay requires a dated state receipt. A deal target is visibly different from an observed flow.