.csv · 3 sections · 30729 characters
workbench: Research Packages/Federal Government Full Freshness Sweep 2026-08-22/relevance_retroaudit/wave_4_strict/WAVE_4_CONTROLLING_RELEVANCE_SUPPLEMENT.csv
Canonical source SHA-256: ce8030ffcb593cc44b9ab4102b931a84890f9c945e9886e6d7e4d19a68bb882f
Served copy SHA-256: ce8030ffcb593cc44b9ab4102b931a84890f9c945e9886e6d7e4d19a68bb882f
Owner evidence cutoffs: {"federal-government-full-freshness-sweep-2026-08-22": "2026-08-23"}
These are package-level cutoffs, not a claim that this source was rechecked on those dates. Use its own publication and capture dates.
Owners: federal-government-full-freshness-sweep-2026-08-22
Section 1 of 3
object_id,relevance_class,canonical_plotlines,canonical_subplots,material_change_types,promotion_action,promotion_unit_id,relevance_basis W4-CI-OBJ-001,routine_or_duplicate_reject,[],[],[],none,W4-CI-PU-001,"A recurring unified-agenda carrier is maintenance of the regulatory plan, not a standalone Observatory event." W4-CI-OBJ-006,routine_or_duplicate_reject,[],[],[],none,W4-CI-PU-006,Exact pre-campaign research coverage bars re-promotion regardless of topical importance. W4-CI-OBJ-007,completeness_census_only,[],[],[],none,W4-CI-PU-007,Routine facility-conduct administration is outside the Observatory intake. W4-CI-OBJ-003,plotline_support_only,"[""Technology/AI""]","[""Infrastructure — roads, water & the physical grid""]",[],none,W4-CI-PU-003,The final voluntary profile supports infrastructure-cyber resilience without creating a binding or operating state. W4-CI-OBJ-002,promotion_review,"[""Technology/AI""]","[""The AI build-out"",""Drones, eVTOL & the airspace"",""Robotics & automation""]","[""authority"",""implementation"",""operating"",""chartable_date""]",new_event_review,W4-CI-PU-002,"Strict re-audit retained: A signed interagency operating agreement and two identified implementation sprints materially advance established AI, autonomy, and drone-production threads." W4-CI-OBJ-009,completeness_census_only,[],[],[],none,W4-CI-PU-009,"Research papers, meeting notices, and program calls are grouped because none materially changed an established plotline." W4-CI-OBJ-005,plotline_support_only,"[""Technology/AI""]","[""The AI build-out""]",[],none,W4-CI-PU-005,The draft links AI use to CSF 2.0 analysis but is not yet final or operating. W4-CI-OBJ-004,plotline_support_only,"[""Technology/AI""]","[""The AI build-out""]",[],none,W4-CI-PU-004,The evaluation draft supports the established AI-governance thread but remains proposal-stage material. W4-CI-OBJ-008,plotline_support_only,"[""Economy""]",[],[],none,W4-CI-PU-008,"The final audit supports program-integrity context, but its bounded award findings do not clear the non-routine material-change gate." W4-CI-OBJ-012,completeness_census_only,[],[],[],none,W4-CI-PU-012,Periodic admission-criteria administration remains outside plotline intake. W4-CI-OBJ-013,completeness_census_only,[],[],[],none,W4-CI-PU-013,Proposal-stage office siting is not an operating entity change. W4-CI-OBJ-011,completeness_census_only,[],[],[],none,W4-CI-PU-011,A precedential patent-practice decision is real but outside the currently established Observatory plotlines. W4-CI-OBJ-010,plotline_support_only,"[""Economy""]",[],[],none,W4-CI-PU-010,"The report refreshes the economic evidence base but does not itself alter law, authority, funding, or operations." W4-CI-OBJ-015,routine_or_duplicate_reject,[],[],[],none,W4-CI-PU-015,"Scheduled maintenance, gazette publication, and events are routine operational churn." W4-CI-OBJ-014,completeness_census_only,[],[],[],none,W4-CI-PU-014,State selection without an operating office remains below the Observatory material-change threshold. W4-CI-OBJ-019,routine_or_duplicate_reject,[],[],[],none,W4-CI-PU-019,Exact pre-campaign substantive coverage defeats novelty. W4-CI-OBJ-018,routine_or_duplicate_reject,[],[],[],none,W4-CI-PU-018,This is both an exact duplicate and a proposal-stage object. W4-CI-OBJ-016,routine_or_duplicate_reject,[],[],[],none,W4-CI-PU-016,Exact pre-campaign substantive coverage defeats novelty; importance cannot override dedup. W4-CI-OBJ-017,routine_or_duplicate_reject,[],[],[],none,W4-CI-PU-017,Exact pre-campaign research coverage bars re-promotion. W4-CI-OBJ-020,routine_or_duplicate_reject,[],[],[],none,W4-CI-PU-020,Exact pre-campaign public-inspection coverage defeats novelty. W4-CI-OBJ-021,routine_or_duplicate_reject,[],[],[],none,W4-CI-PU-021,Exact pre-campaign public-inspection coverage defeats novelty. W4-CI-OBJ-022,completeness_census_only,[],[],[],none,W4-CI-PU-022,A company-specific ordinary enforcement settlement does not clear the Observatory materiality gate. W4-CI-OBJ-023,promotion_review,"[""Economy""]","[""Tariffs & the trade war""]","[""legal"",""implementation"",""operating"",""chartable_date""]",new_event_review,W4-CI-PU-023,Strict re-audit retained: A live Section 232-USMCA administration procedure changed deadlines and validity periods for an established tariff plotline. W4-CI-OBJ-024,promotion_review,"[""Energy"",""Technology/AI""]","[""Energy dominance & the nuclear revival"",""The data-center & compute buildout""]","[""entity"",""authority"",""implementation"",""chartable_date""]",new_event_review,W4-CI-PU-024,"Strict re-audit retained: A project-specific federal trade-zone legal state changed for an already relevant energy-compute site, while construction and operation remain explicitly unproved." W4-CI-OBJ-025,routine_or_duplicate_reject,[],[],[],none,W4-CI-PU-025,Exact pre-campaign coverage defeats novelty. W4-CI-OBJ-026,routine_or_duplicate_reject,[],[],[],none,W4-CI-PU-026,Exact pre-campaign coverage defeats novelty. W4-CI-OBJ-028,plotline_support_only,"[""Economy""]","[""Tariffs & the trade war""]",[],none,W4-CI-PU-028,The collection supports the tariff-administration thread but remains procedural and non-operative as to any applicant. W4-CI-OBJ-029,plotline_support_only,"[""Technology/AI"",""Energy""]","[""Taiwan & the chip war"",""The data-center & compute buildout"",""Energy dominance & the nuclear revival""]",[],none,W4-CI-PU-029,The proposals support industrial-metabolism monitoring but remain below the implementation threshold. W4-CI-OBJ-030,routine_or_duplicate_reject,[],[],[],none,W4-CI-PU-030,"Ordinary local approvals, withdrawals, and proposals are grouped to prevent bloat." W4-CI-OBJ-031,routine_or_duplicate_reject,[],[],[],none,W4-CI-PU-031,Exact prior coverage and advisory-only status both fail the gate. W4-CI-OBJ-027,routine_or_duplicate_reject,[],[],[],none,W4-CI-PU-027,Ordinary case-specific trade-remedy notices are grouped to prevent maintenance bloat. W4-CI-OBJ-033,plotline_support_only,"[""Economy""]","[""Infrastructure — roads, water & the physical grid""]",[],update_watch,W4-CI-PU-033,The audit initiation supports a bounded watch but cannot be promoted as a finding. W4-CI-OBJ-032,plotline_support_only,"[""Economy""]","[""Infrastructure — roads, water & the physical grid""]",[],none,W4-CI-PU-032,The batch supports the infrastructure field picture but remains ordinary local grant administration. W4-CI-OBJ-034,routine_or_duplicate_reject,[],[],[],none,W4-CI-PU-034,Routine local grant announcements are grouped to prevent maintenance bloat. W4-CI-OBJ-036,completeness_census_only,[],[],[],none,W4-CI-PU-036,Current publisher continuity is important topology evidence but is not itself a fresh plotline event. W4-CI-OBJ-035,routine_or_duplicate_reject,[],[],[],none,W4-CI-PU-035,"Recurring data-collection administration is maintenance, not plotline movement." W4-CI-OBJ-037,completeness_census_only,[],[],[],none,W4-CI-PU-037,"The office's current identity is recertified, but the new evidence is a proposal-stage budget state, not a fresh implemented event." W4-EL-OBJ-015,routine_or_duplicate_reject,[],[],[],none,W4-EL-PU-015,Exact pre-campaign duplicate retained only for deduplication and completeness provenance. W4-EL-OBJ-016,routine_or_duplicate_reject,[],[],[],none,W4-EL-PU-016,Exact pre-campaign duplicate retained only for deduplication and completeness provenance. W4-EL-OBJ-017,routine_or_duplicate_reject,[],[],[],none,W4-EL-PU-017,Exact pre-campaign duplicate retained only for deduplication and completeness provenance. W4-EL-OBJ-014,plotline_support_only,"[""Energy""]","[""Infrastructure — roads, water & the physical grid""]",[],none,W4-EL-PU-014,"The ETAC groundbreaking supports the existing grid-resilience record, but a generic ceremony without construction progress, accepted capability, operation or a specific established Observatory storyline consequence does not clear standalone review." W4-EL-OBJ-013,routine_or_duplicate_reject,[],[],[],none,W4-EL-PU-013,Exact pre-campaign duplicate retained only for deduplication and completeness provenance. W4-EL-OBJ-011,plotline_support_only,"[""Energy""]","[""Energy dominance & the nuclear revival""]",[],none,W4-EL-PU-011,"Nine critical-minerals selections support the existing supply-chain plotline, but selections for negotiation are routine funding-stage evidence rather than awards or implementation." W4-EL-OBJ-019,promotion_review,"[""Energy""]","[""Energy dominance & the nuclear revival""]","[""funding"",""operating"",""chartable_date""]",new_event_review,W4-EL-PU-DIABLO-CNC,"Strict re-audit retained: DOE issued the first actual Civil Nuclear Credit payment after stated conditions were met; this is beyond selection, negotiation or award-announcement state." W4-EL-OBJ-012,plotline_support_only,"[""Energy""]","[""Energy dominance & the nuclear revival""]",[],none,W4-EL-PU-012,"Seven battery/critical-minerals selections support the existing supply-chain plotline, but amount and recency do not convert negotiations into a material implementation event." W4-EL-OBJ-007,routine_or_duplicate_reject,[],[],[],none,W4-EL-PU-007,Exact pre-campaign duplicate retained only for deduplication and completeness provenance. W4-EL-OBJ-021,plotline_support_only,"[""Energy""]","[""Energy dominance & the nuclear revival""]",[],none,W4-EL-PU-021,The SEIS is legal and analytical provenance for the Diablo Canyon unit; it supports the grouped review but is not a separate standalone event. W4-EL-OBJ-020,plotline_support_only,"[""Energy""]","[""Energy dominance & the nuclear revival""]",[],none,W4-EL-PU-020,"The amended ROD is legal provenance for the same Diablo Canyon payment unit. It supports review of the first actual payment but does not independently transfer funds or change plant operation, so it is not a second D row." W4-EL-OBJ-010,plotline_support_only,"[""Technology/AI""]",[],[],none,W4-EL-PU-010,"The unnamed directive announcement supports the existing federal-science operating-control watch but cannot clear standalone review without exact directive IDs, versions or operative consequences." W4-EL-OBJ-008,routine_or_duplicate_reject,[],[],[],none,W4-EL-PU-008,Exact pre-campaign duplicate retained only for deduplication and completeness provenance. W4-EL-OBJ-009,promotion_review,"[""Energy""]","[""Infrastructure — roads, water & the physical grid""]","[""legal"",""authority"",""falsifier"",""chartable_date""]",new_event_review,W4-EL-PU-NIETC-CANCEL,"Strict re-audit retained: DOE closed the existing three-corridor designation process with no NIETC designated, a final decision-state falsifier rather than a proposal or amount." W4-EL-OBJ-018,plotline_support_only,"[""Government Fraud""]","[""The watchdogs & how the money is watched""]",[],none,W4-EL-PU-018,"The payment-integrity audit supports the established watchdog record, but a compliant annual report with recommendations is not independently reader-glad or a new machinery state." W4-EL-OBJ-001,plotline_support_only,"[""Energy""]","[""Infrastructure — roads, water & the physical grid""]","[""legal"",""authority"",""implementation"",""chartable_date""]",update_watch,W4-STRICT-C-PREPA-1E,"Demote to C: the 1E instrument is a recurring bounded successor renewal of already operative PREPA emergency authority. Preserve the exact order and reporting clock for the energy watch, but do not create a separate review unit absent dispatch, output, repair, outage, or other observed effect."
Section 2 of 3
W4-EL-OBJ-002,plotline_support_only,"[""Energy""]","[""Infrastructure — roads, water & the physical grid""]","[""legal"",""authority"",""implementation"",""chartable_date""]",update_watch,W4-STRICT-C-PREPA-2E,"Demote to C: the 2E instrument renews the same bounded PREPA emergency-order family. The additional 400-mile directive is worth preserving in the existing grid watch, but no completed vegetation work, repair, capacity, or customer result supports a separate review unit." W4-EL-OBJ-004,routine_or_duplicate_reject,[],[],[],none,W4-EL-PU-004,Exact pre-campaign duplicate retained only for deduplication and completeness provenance. W4-EL-OBJ-006,routine_or_duplicate_reject,[],[],[],none,W4-EL-PU-006,Exact pre-campaign duplicate retained only for deduplication and completeness provenance. W4-EL-OBJ-005,routine_or_duplicate_reject,[],[],[],none,W4-EL-PU-005,Exact pre-campaign duplicate retained only for deduplication and completeness provenance. W4-EL-OBJ-003,promotion_review,"[""Energy""]","[""Infrastructure — roads, water & the physical grid""]","[""legal"",""authority"",""implementation"",""chartable_date""]",new_event_review,W4-EL-PU-EDDYSTONE-202C,Strict re-audit retained: A new signed federal emergency order placed Eddystone Units 3 and 4 into a bounded availability regime; dispatch and output remain unproved. W4-EL-OBJ-023,routine_or_duplicate_reject,[],[],[],none,W4-EL-PU-023,Exact pre-campaign duplicate retained only for deduplication and completeness provenance. W4-EL-OBJ-022,plotline_support_only,"[""Military"",""Energy""]",[],[],none,W4-EL-PU-022,The NNSA Savannah River option preserves an existing M&O relationship; ordinary continuity and its estimated amount do not clear the standalone materiality gate. W4-EL-OBJ-025,plotline_support_only,"[""Government Fraud""]","[""The watchdogs & how the money is watched""]",[],none,W4-EL-PU-025,"The historical Sandia incurred-cost audit supports the watchdog record, but its key material issue was already resolved and it does not establish a current operating incident." W4-EL-OBJ-024,plotline_support_only,"[""Military"",""Technology/AI""]","[""Defense tech & autonomous weapons""]",[],none,W4-EL-PU-024,"The historical transporter crash series supports the defense-technology record, but the current page is a retrospective and qualification/production remain unproved." W4-EL-OBJ-026,routine_or_duplicate_reject,[],[],[],none,W4-EL-PU-026,"A new lab feature restated a pre-existing DOE selection without a new selection, award or operating result; publisher recency cannot create a standalone event." W4-EL-OBJ-027,plotline_support_only,"[""Technology/AI""]","[""The AI build-out""]",[],none,W4-EL-PU-027,"The PNNL center launch supports the existing AI build-out record, but an internal lab entity launch and internal funding claim without a DOE-wide authority change, external deployment or validated operating consequence does not clear standalone review." W4-EL-OBJ-031,plotline_support_only,"[""Energy""]","[""Energy dominance & the nuclear revival""]",[],none,W4-EL-PU-031,"The NuCAMP MOU supports the nuclear-manufacturing watch, but its expressly exploratory 12-month phase is not an award, construction or qualified capability." W4-EL-OBJ-030,plotline_support_only,"[""Energy""]","[""Energy dominance & the nuclear revival""]",[],none,W4-EL-PU-030,"The ORNL-INL research agreement supports nuclear manufacturing qualification work, but ordinary interlab collaboration and a research article are not code qualification or deployment." W4-EL-OBJ-029,plotline_support_only,"[""Energy""]","[""Energy dominance & the nuclear revival""]",[],none,W4-EL-PU-029,"The UNITY-3 facility announcement supports the fusion build watch, but the lab page is not the award instrument and construction or operation remain future." W4-EL-OBJ-028,plotline_support_only,"[""Energy""]","[""Energy dominance & the nuclear revival""]",[],none,W4-EL-PU-028,"The signed ORNL technology license supports the nuclear/fusion build record, but ordinary tech transfer is not a DOE award, deployment or operating result." W4-EL-OBJ-032,plotline_support_only,"[""Health""]",[],[],none,W4-EL-PU-032,"The resumed rhenium-generator production and one delivery support the isotope/health record, but one lab-reported research delivery does not independently establish a scaled public program." W4-EL-OBJ-034,routine_or_duplicate_reject,[],[],[],none,W4-EL-PU-034,Exact pre-campaign duplicate retained only for deduplication and completeness provenance. W4-EL-OBJ-033,routine_or_duplicate_reject,[],[],[],none,W4-EL-PU-033,"The PJM notice is time-novel but purely procedural: it does not establish a governance rule, tariff change, dispute outcome or implementation, so it remains an A reject rather than a promotion candidate." W4-EL-OBJ-036,plotline_support_only,"[""Energy""]","[""Infrastructure — roads, water & the physical grid""]",[],none,W4-EL-PU-036,The CP2 scoping notice supports the established Energy legal watch; a comment process is not approval or implementation. W4-EL-OBJ-035,plotline_support_only,"[""Energy""]","[""Infrastructure — roads, water & the physical grid""]",[],none,W4-EL-PU-035,The Rio Grande environmental-assessment schedule supports the established Energy legal watch; a schedule is not authorization or construction. W4-EL-OBJ-037,plotline_support_only,"[""Energy"",""Economy""]","[""Infrastructure — roads, water & the physical grid""]",[],none,W4-EL-PU-037,"BPA's Q3 forecast supports the existing grid-finance watch, but forecast deterioration and surcharge risk are not final results or an imposed rate." W4-EL-OBJ-038,plotline_support_only,"[""Energy""]","[""Infrastructure — roads, water & the physical grid""]",[],none,W4-EL-PU-038,The recertified SEPA proposed-rate state supports the established rate watch; an unapproved proposal with no exact revision clock does not clear review. W4-AG-OBJ-001,promotion_review,"[""Health"",""Technology/AI""]","[""Surveillance & the security state""]","[""authority"",""delegation"",""implementation"",""watch"",""chartable_date""]",review_only,W4-AG-UNIT-001,Strict re-audit retained: Not routine maintenance: the signed interagency instrument formalizes USDA-DHS roles and an operating UAS/AI/biosurveillance architecture on the already-established New World screwworm border-response storyline. It does not claim a deployment or outcome. W4-AG-OBJ-012,plotline_support_only,"[""Weather/Nature""]","[""Wildlife, ecology & natural wonders""]","[""legal"",""watch"",""chartable_date""]",update_watch,W4-AG-PROV-012,Roadless rescission remains a proposal. It can update the existing forest/ecology rule watch but cannot create a final/effective/implementation event. W4-AG-OBJ-013,plotline_support_only,"[""Weather/Nature""]","[""Wildlife, ecology & natural wonders""]","[""legal"",""watch"",""chartable_date""]",update_watch,W4-AG-PROV-013,Travel Management remains notice-of-intent/public-inspection state and expressly leaves current designations intact; C watch support only. W4-AG-OBJ-002,promotion_review,"[""Weather/Nature"",""Politics"",""Government Fraud""]","[""Extreme weather & natural disasters"",""The presidency & the administrative state"",""DOGE & cutting the government""]","[""authority"",""delegation"",""entity"",""operating"",""chartable_date""]",review_only,W4-AG-UNIT-002,"Strict re-audit retained: Not routine maintenance: every Forest Service fire/aviation authority under the cited manual series moved to one Deputy Chief, changing the national command and emergency-declaration state on the established wildfire-governance and administrative-reorganization storyline." W4-AG-OBJ-003,promotion_review,"[""Weather/Nature"",""Politics"",""Government Fraud""]","[""Extreme weather & natural disasters"",""The presidency & the administrative state"",""DOGE & cutting the government""]","[""funding"",""implementation"",""watch"",""chartable_date""]",review_only,W4-AG-UNIT-003,"Strict re-audit retained: Not routine grant churn: an executed named contract commissions the specific federal wildland-fire separation/consolidation study and fixes a February 15, 2027 report horizon on an established wildfire-governance/reorganization storyline. The review packet is limited to the study award, not consolidation." W4-AG-OBJ-010,routine_or_duplicate_reject,[],[],[],none,W4-AG-PROV-010,Exact pre-campaign Weekly Delta duplicate; completeness/legal-census evidence only. W4-AG-OBJ-004,plotline_support_only,"[""Weather/Nature"",""Economy""]","[""Extreme weather & natural disasters""]","[""funding"",""implementation"",""operating"",""chartable_date""]",enrich_existing,W4-AG-PROV-004,Fresh deadline and documentation flexibility supports the existing disaster-relief story but is ordinary program administration; it creates no standalone Observatory object and proves no payment or recovery. W4-AG-OBJ-016,plotline_support_only,"[""Economy""]",[],"[""funding"",""watch"",""chartable_date""]",enrich_existing,W4-AG-PROV-016,"SPUR is application availability only. Amount and recency do not turn it into a selection, award, obligation, payment, capacity, or market event." W4-AG-OBJ-011,routine_or_duplicate_reject,[],[],[],none,W4-AG-PROV-011,Exact pre-campaign August 4 full-surface duplicate; funding availability is not a later award or delivery. W4-AG-OBJ-014,plotline_support_only,"[""Politics""]","[""The presidency & the administrative state""]","[""legal"",""watch"",""chartable_date""]",update_watch,W4-AG-PROV-014,The construction-rule rescission is a proposal. It supports the administrative-state deregulation watch but proves no final or operating change. W4-AG-OBJ-005,plotline_support_only,"[""Politics""]","[""The presidency & the administrative state""]","[""entity"",""operating"",""chartable_date""]",enrich_existing,W4-AG-PROV-005,"The oath recertifies who occupies a senior office but does not itself establish policy, delegated authority, funding, reorganization, or effect; ordinary personnel transition stays C." W4-AG-OBJ-017,plotline_support_only,"[""Health""]","[""Cancer, food & chronic disease""]","[""funding"",""watch"",""chartable_date""]",enrich_existing,W4-AG-PROV-017,"Cold-chain grant availability may support the food-system story, but no recipient, award, obligation, payment, installation, or delivery is proved." W4-AG-OBJ-006,promotion_review,"[""Government Fraud"",""Politics""]","[""DOGE & cutting the government"",""The presidency & the administrative state""]","[""entity"",""authority"",""delegation"",""implementation"",""operating"",""provenance"",""chartable_date""]",review_only,W4-AG-UNIT-004,"Strict re-audit retained: Not routine maintenance: the official mission area changed identity, reporting line, headquarters footprint, regional hubs, and retailer-compliance topology. It materially repairs the established government-reorganization storyline but is explicitly reservoir-new historical, not current catch-up." W4-AG-OBJ-009,routine_or_duplicate_reject,[],[],[],none,W4-AG-PROV-009,Exact pre-campaign Weekly Delta duplicate; completeness/legal-census evidence only. W4-AG-OBJ-015,plotline_support_only,"[""Health""]","[""Cancer, food & chronic disease""]","[""legal"",""watch"",""chartable_date""]",update_watch,W4-AG-PROV-015,"A petition and draft plant-pest assessment may support the existing food/biotech watch, but there is no final deregulation or observed food-system effect." W4-AG-OBJ-019,plotline_support_only,"[""Crypto""]","[""SWIFT & the new banking rails""]","[""implementation"",""operating"",""provenance"",""chartable_date""]",enrich_existing,W4-AG-PROV-019,"The historical electronic-only payment implementation supports the established payment-rails storyline, but it is a narrow fee-channel change with no transaction or revenue effect."
Section 3 of 3
W4-AG-OBJ-020,plotline_support_only,"[""Health""]",[],"[""watch"",""operating""]",update_watch,W4-AG-PROV-020,The page recertifies the existing New World screwworm port watch and does not prove a new detection or actual reopening. W4-AG-OBJ-018,plotline_support_only,"[""Weather/Nature""]","[""Wildlife, ecology & natural wonders""]","[""legal"",""implementation"",""watch"",""chartable_date""]",update_watch,W4-AG-PROV-018,"The final potato-wart order is material to its own program but lacks a tight established Observatory storyline join; retain as C legal-state support, not a new plotline." W4-AG-OBJ-022,completeness_census_only,[],[],[],none,W4-AG-PROV-022,"The FCIC page exposes only a notice and agenda and still labels the scheduled date upcoming; without minutes or actions, no outcome can be assigned relevance." W4-AG-OBJ-021,plotline_support_only,"[""Weather/Nature"",""Economy""]","[""Extreme weather & natural disasters""]","[""implementation"",""watch"",""chartable_date""]",update_watch,W4-AG-PROV-021,The apple-freeze bulletin expands emergency procedures by crop and state but remains ordinary loss-adjustment administration; no indemnity or recovery is proved. W4-AG-OBJ-007,plotline_support_only,"[""Economy"",""Weather/Nature""]","[""Extreme weather & natural disasters""]","[""funding"",""implementation"",""operating"",""chartable_date""]",enrich_existing,W4-AG-PROV-007,"The bulletin is fresh but is ordinary crop-insurance payment flexibility; it supports the farm/disaster economy without proving approval, indemnity, payment, or recovery." W4-AG-OBJ-008,plotline_support_only,"[""Economy"",""Weather/Nature""]","[""Extreme weather & natural disasters""]","[""funding"",""implementation"",""operating"",""chartable_date""]",enrich_existing,W4-AG-PROV-008,"The reinstated option is ordinary crop-insurance program administration. Availability for a future crop cycle is not purchase, payment, loss, or effect." W4-TT-OBJ-001,routine_or_duplicate_reject,[],[],[],none,W4-TT-EVID-001,Exact pre-campaign weekly object; a fresh sighting is provenance only. W4-TT-OBJ-020,plotline_support_only,"[""Government Fraud""]","[""Missing money & waste"",""The watchdogs & how the money is watched""]",[],update_watch,W4-TT-EVID-020,"The recurring statutory compliance review updates the existing payment-integrity watch, but it made no recommendations; annual cadence, estimates and amounts cannot elevate it to a standalone event." W4-TT-OBJ-002,routine_or_duplicate_reject,[],[],[],none,W4-TT-EVID-002,Exact pre-campaign Great Corridors RFI; proposal amount and recency cannot create another event. W4-TT-OBJ-004,plotline_support_only,"[""Technology/AI""]","[""Drones, eVTOL & the airspace""]",[],enrich_existing,W4-TT-EVID-004,"A local tower entered operation, but the remaining technology upgrades are future and the item is not a national airspace-policy change." W4-TT-OBJ-008,plotline_support_only,"[""Technology/AI""]","[""Drones, eVTOL & the airspace""]",[],enrich_existing,W4-TT-EVID-008,"The DCA radar is implemented support for an existing airspace-modernization story, but installation does not establish safety effect or national completion." W4-TT-OBJ-009,promotion_review,"[""Technology/AI""]","[""Drones, eVTOL & the airspace""]","[""operating"",""chartable_date""]",new_event_review,W4-TT-PRU-003,Strict re-audit retained: Multistate hybrid-electric flights physically occurred under eIPP and therefore materially advance the established advanced-air-mobility plotline. W4-TT-OBJ-003,plotline_support_only,"[""Technology/AI""]","[""Drones, eVTOL & the airspace""]","[""operating"",""chartable_date""]",enrich_existing,W4-STRICT-C-EIPP-UTAH,"Demote to C: the Utah test is genuine operating evidence, but it is an earlier same-program demonstration leg. Preserve it as support for the later multistate eIPP milestone rather than creating a second near-duplicate Observatory item." W4-TT-OBJ-006,plotline_support_only,"[""Technology/AI""]","[""Drones, eVTOL & the airspace""]",[],enrich_existing,W4-TT-EVID-006,One airport's installed surface radar supports the airspace-modernization watch without warranting a standalone event. W4-TT-OBJ-019,plotline_support_only,"[""Space""]","[""Commercial space & the high ground""]",[],update_watch,W4-TT-EVID-019,"A draft EA advances an existing commercial-space licensing watch but remains short of a final finding, license or operation." W4-TT-OBJ-013,completeness_census_only,[],[],[],none,W4-TT-EVID-013,A fourteen-day draft-handbook comment extension changes only a procedural proposal clock. W4-TT-OBJ-012,promotion_review,"[""Technology/AI""]","[""Drones, eVTOL & the airspace""]","[""legal"",""implementation"",""chartable_date""]",new_event_review,W4-TT-PRU-004,"Strict re-audit retained: FAA adopted a new environmental-review pathway for specified supersonic SFA actions at an exact issuance/publication/effect clock, advancing the established advanced-airspace legal architecture." W4-TT-OBJ-014,completeness_census_only,[],[],[],none,W4-TT-EVID-014,"The GAO report is descriptive, makes no recommendation and does not itself change airport fee law or enforcement." W4-TT-OBJ-021,plotline_support_only,"[""Government Fraud""]","[""Missing money & waste"",""The watchdogs & how the money is watched""]",[],update_watch,W4-TT-EVID-021,"The FRA audit opening is an exact watchdog clock, but it has no findings, questioned costs or recovery and therefore remains support only." W4-TT-OBJ-010,completeness_census_only,[],[],[],none,W4-TT-EVID-010,NCAP test removals are only proposed and do not map tightly enough to an existing Observatory plotline for standalone intake. W4-TT-OBJ-011,completeness_census_only,[],[],[],none,W4-TT-EVID-011,"The supplemental minibus waiver is proposal-stage procurement administration, not a material established-plotline change." W4-TT-OBJ-005,plotline_support_only,"[""Energy""]","[""Infrastructure — roads, water & the physical grid""]",[],update_watch,W4-TT-EVID-005,"Engineering entry advances an existing rail-project watch but does not prove agreement, obligation, construction or service." W4-TT-OBJ-007,plotline_support_only,"[""Energy""]","[""Infrastructure — roads, water & the physical grid""]",[],update_watch,W4-TT-EVID-007,"The aggregate selection closes a prior Small Shipyard watch, but it remains a routine grant-program selection; the announced amount, recency and 45 local awards do not clear the materiality gate." W4-TT-OBJ-015,routine_or_duplicate_reject,[],[],[],none,W4-TT-EVID-015,Exact pre-campaign August 4 recertification object; no second Seaway event is allowed. W4-TT-OBJ-016,plotline_support_only,"[""Energy""]","[""Infrastructure — roads, water & the physical grid""]",[],update_watch,W4-TT-EVID-016,The June HTF state is accounting support for an existing infrastructure watch; reporting lag and amounts do not create a fresh event. W4-TT-OBJ-017,completeness_census_only,[],[],[],none,W4-TT-EVID-017,The AATF row is an access/completeness hold; a stale public balance and current forecast cannot be promoted. W4-TT-OBJ-018,plotline_support_only,"[""Energy""]","[""Infrastructure — roads, water & the physical grid""]",[],update_watch,W4-TT-EVID-018,"The HMTF budget shelf supports the existing infrastructure-money watch but does not prove authorization use, obligation, outlay or physical work."